PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/23/21 EST. NO. 006 TIME 12:48 PM R.E. NAME: AL-KHATEEB, TAGHREED 08-0K1234 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 800.95 E.W. @ F.A.(+) 030821 N 426360 0003 36.95 030321 N 426300 004 0007 300.00 E.W. @ F.A.(+) 011421 N 114211 006 0004 1,920.76 E.W. @ F.A.(+) 030821 N 426350 0005 1,895.26 030321 N 426380 0006 2,031.49 031021 N 426390 0007 807.14 030221 N 426310 0008 807.14 030321 N 426320 0009 807.14 030421 N 426330 0010 1,400.99 030521 N 426340 012 0001 5,836.60 A.C. @ U.P.(+) 022521 N 022521 013 0004 781.16 E.W. @ F.A.(+) 030921 N 426370 0004-1 -781.16 030921 N 426370 DAO CORRECTING ENTRY 0005 869.74 030921 N 426371 015 0003 5,375.58 E.W. @ F.A.(+) 031021 N 426410 0004 3,093.53 031021 N 426421 016 0005 678.30 E.W. @ F.A.(+) 030921 N 030921 0005-1 -678.30 030921 N 030921 DAO CORRECTING ENTRY 0006 5,886.63 031121 N 031121 0006-1 -5,886.63 031121 N 031121 DAO CORRECTING ENTRY 0007 765.89 021221 N 7852 0 0008 765.89 022621 N 7853 0 0009 765.89 030321 N 7855 0 0010 8,372.74 030521 N 7854 0 0011 589.83 030921 N 7856 0 0012 5,118.81 031121 N 7859 0 42,362.32 TOTAL THIS ESTIMATE 456,204.41 TOTAL PREVIOUS ESTIMATE 498,566.73 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/23/21 EST. NO. 006 TIME 12:48 PM R.E. NAME: AL-KHATEEB, TAGHREED 08-0K1234 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K1234 TIME 12:48 PM ESTIMATE NO. 006 BID OPENING 05/19/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: AL-KHATEEB, TAGHREED DATE OF THIS ESTIMATE 03/23/21 LOCATION PROGRESS ESTIMATE 08-SBD-15-64.6/75.3 ----------------- SULLY-MILLER CONTRACTING FROM 1.2 MI. S/O SIDEWINDER ROAD OC COMPANY TO MOJAVE RIVER BRIDGE 135 S. STATE COLLEGE BLVD.; BREA CA 92821 FED. AID NO. N O N E REHABILITATE EXISTING MAINLINE AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 900.0000 900.00 1.000 900 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 200,000.00 47.000 47,000 003 DEVELOP WATER SUPPLY LS 50,000.0000 50,000.00 0.316 15,800 004 CONSTRUCTION AREA SIGNS LS 79,000.0000 79,000.00 0.900 71,100 005 TRAFFIC CONTROL SYSTEM LS 452,338.1000 452,338.10 0.235 106,299 006 TYPE II BARRICADE EA 55.0000 2,420.00 0.000 0 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 2.0000 1,400.00 0.000 0 008 CHANNELIZER (SURFACE MOUNTED) EA 55.0000 23,650.00 0.000 0 009 PORTABLE RADAR SPEED FEEDBACK SIGN LS 12,000.0000 12,000.00 0.306 3,672 SYSTEMS 010 TEMPORARY PAVEMENT MARKER EA 5.0000 160.00 0.000 0 011 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 20,000.0000 20,000.00 0.000 0 012 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 45,000.0000 45,000.00 0.306 13,770 013 TEMPORARY RAILING (TYPE K) LF 39.7500 24,645.00 0.000 0 014 TEMPORARY CRASH CUSHION MODULE EA 225.0000 3,150.00 0.000 0 015 JOB SITE MANAGEMENT LS 16,000.0000 16,000.00 0.235 3,760 016 PREPARE STORM WATER POLLUTION PREVENTION LS 16,500.0000 16,500.00 0.500 8,250 PLAN 017 TEMPORARY SOIL BINDER SQYD 1.4500 7,250.00 0.000 0 018 TEMPORARY COVER SQYD 3.0000 15,000.00 0.000 0 019 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 15,000.00 0.000 0 020 STREET SWEEPING LS 16,000.0000 16,000.00 0.000 0 021 TEMPORARY CONCRETE WASHOUT LS 7,500.0000 7,500.00 0.000 0 022 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 3.0000 2,100.00 0.000 0 STRIPE (HAZARDOUS WASTE) PROGRAM CAS145 PAGE 2 DATE 03/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K1234 TIME 12:48 PM ESTIMATE NO. 006 BID OPENING 05/19/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: AL-KHATEEB, TAGHREED DATE OF THIS ESTIMATE 03/23/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.2000 8,580.00 15,160.000 3,032.00 15,160.000 3,032 024 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 342.0000 1,710.00 0.000 0 025 CLEARING AND GRUBBING (LS) LS 11,000.0000 11,000.00 1.000 11,000 026 DUST PALLIATIVE LS 5,000.0000 5,000.00 0.000 0 027 ROADWAY EXCAVATION CY 40.0000 107,600.00 0.000 0 028 SHOULDER BACKING TON 21.0000 216,300.00 0.000 0 029 ROCK BLANKET SQFT 15.0000 72,000.00 0.000 0 030 GRAVEL MULCH SQFT 7.0000 9,590.00 0.000 0 031 HYDROSEED SQFT 0.0800 102,400.00 0.000 0 032 CLASS 2 AGGREGATE SUBBASE CY 56.1700 51,676.40 0.000 0 033 REPLACE ASPHALT CONCRETE SURFACING CY 300.0000 279,000.00 972.832 291,849 034 PRIME COAT TON 800.0000 96,000.00 0.000 0 035 HOT MIX ASPHALT (TYPE A) TON 128.0000 116,480.00 0.000 0 036 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 79.0000 7,631,400.00 59,593.380 4,707,877 037 DATA CORE LS 15,000.0000 15,000.00 0.000 0 038 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 4.0000 2,880.00 0.000 0 039 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 4.0000 6,280.00 0.000 0 040 TACK COAT TON 800.0000 11,200.00 122.500 98,000 041 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 388.0000 11,640.00 26.000 10,088.00 26.000 10,088 042 REMOVE ASPHALT CONCRETE DIKE LF 2.5000 5,625.00 1,747.000 4,367 043 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.2000 1,639,000.00 466,312.850 1,025,888 044 JOINTED PLAIN CONCRETE PAVEMENT CY 320.0000 457,600.00 0.000 0 045 ISOLATION JOINT SEAL (SILICONE) LF 22.0000 15,180.00 0.000 0 046 SAND BACKFILL CY 100.0000 100.00 0.000 0 047 DETECTABLE WARNING SURFACE SQFT 68.0000 27,880.00 0.000 0 048 MINOR CONCRETE (MISCELLANEOUS CY 590.0000 13,570.00 0.000 0 CONSTRUCTION) 049 RAPID STRENGTH CONCRETE (SIDEWALK CY 780.0000 132,600.00 67.000 52,260.00 67.000 52,260 AND CURB RAMP, CURB & GUTTER, RETAINING CURB, RAISED ISLAND) PROGRAM CAS145 PAGE 3 DATE 03/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K1234 TIME 12:48 PM ESTIMATE NO. 006 BID OPENING 05/19/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: AL-KHATEEB, TAGHREED DATE OF THIS ESTIMATE 03/23/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE CONCRETE CY 400.0000 72,000.00 160.450 64,180.00 160.450 64,180 (CURB, GUTTER, AND SIDEWALK) (CY) 051 PRE/POST CONSTRUCTION SURVEYS EA 1,000.0000 22,000.00 11.000 11,000 052 REMOVE FENCE LF 5.0000 48,500.00 10,130.000 50,650 053 DESERT TORTOISE FENCE LF 12.0000 116,400.00 10,130.000 121,560 054 REMOVE PAVEMENT MARKER EA 1.0000 48.00 0.000 0 055 GUARD RAILING DELINEATOR EA 26.0000 2,470.00 0.000 0 056 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 1,170.00 0.000 0 057 PAVEMENT MARKER EA 5.0000 45,900.00 0.000 0 (RETROREFLECTIVE-RECESSED) 058 REMOVE ROADSIDE SIGN (WOOD POST) EA 65.0000 715.00 0.000 0 059 RESET OBJECT MARKER EA 85.0000 680.00 0.000 0 060 RESET ROADSIDE SIGN (ONE POST) EA 270.0000 6,750.00 0.000 0 061 RESET ROADSIDE SIGN (TWO POST) EA 690.0000 1,380.00 0.000 0 062 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 7.0000 770.00 0.000 0 (0.063"-UNFRAMED) 063 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 1,500.00 0.000 0 (0.080"-FRAMED) 064 ROADSIDE SIGN - ONE POST EA 370.0000 3,330.00 0.000 0 065 ROADSIDE SIGN - TWO POST EA 715.0000 2,860.00 0.000 0 066 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 26.5000 135,150.00 937.500 24,843.75 3,694.500 97,904 067 MIDWEST GUARDRAIL SYSTEM LF 47.0000 5,170.00 0.000 0 (9' STEEL POST) 068 VEGETATION CONTROL (MINOR CONCRETE) SQYD 75.0000 267,750.00 0.000 0 069 TRANSITION RAILING (TYPE WB-31) EA 4,300.0000 47,300.00 2.000 8,600.00 6.000 25,800 070 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,200.0000 21,600.00 2.000 2,400.00 15.000 18,000 071 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,675.0000 110,250.00 4.000 14,700.00 23.000 84,525 072 REMOVE GUARDRAIL LF 10.2500 29,110.00 300.000 3,075.00 1,869.000 19,157 073 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 21,240.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 074 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4500 187,200.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 075 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 28,405.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 076 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 230.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 03/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K1234 TIME 12:48 PM ESTIMATE NO. 006 BID OPENING 05/19/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: AL-KHATEEB, TAGHREED DATE OF THIS ESTIMATE 03/23/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 1,080.00 0.000 0 078 12" RUMBLE STRIP STA 26.2500 41,737.50 0.000 0 (ASPHALT CONCRETE PAVEMENT) 079 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10,000.0000 10,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 080 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 150,000.0000 150,000.00 0.150 22,500.00 0.150 22,500 081 MODIFYING TRAFFIC MONITORING STATIONS LS 100,000.0000 100,000.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 03/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K1234 TIME 12:48 PM ESTIMATE NO. 006 BID OPENING 05/19/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/21 R.E. NAME: AL-KHATEEB, TAGHREED DATE OF THIS ESTIMATE 03/23/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 205,678.75 6,990,190.34 ADJUSTMENT OF COMPENSATION 5,836.60 438,206.86 EXTRA WORK 36,525.72 60,359.87 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 248,041.07 7,488,757.07 082 MOBILIZATION LS 1,450,000.0000 1,450,000.00 1.000 1,450,000 ORIGINAL CONTRACT AMOUNT 14,990,000.00 TOTAL WORK COMPLETED 248,041.07 8,938,757.07 MATERIALS ON HAND ON SITE -198,577.62 90,644.62 DEDUCTIONS 0.00 0.00 TOTAL 49,463.45 9,029,401.69 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/29/20 200 08/25/20 08/25/20 10/25/21 49 90 0 0 57% 25% PROGRESS IS SATISFACTORY AL-KHATEEB, TAGHREED RESIDENT ENGINEER PROGRAM CAS145 DATE 03/23/21