PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/26/14 EST. NO.02 TIME 08:59 AM R.E. NAME: DAVIS, DARCY 08-0K3104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/26/14 EST. NO.02 TIME 08:59 AM R.E. NAME: DAVIS, DARCY 08-0K3104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/26/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K3104 TIME 08:59 AM ESTIMATE NO. 02 BID OPENING 07/11/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 03/26/14 LOCATION PROGRESS ESTIMATE 08-SBD-95-51.2/51.6 ----------------- LAS VEGAS PAVING CORPORATION IN SAN BERNARDINO COUNTY FROM 13.9 4420 SOUTH DECATUR BLVD MILES NORTH OF HAVASU LAKE ROAD LAS VEGAS NV 89103 TO 5.5 MILES SOUTH OF ROUTE 40/95 SEPARATION. FED. AID NO. STP-P095(24)E REALIGN RDWY W HMA OVER AGGREGATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,300.0000 3,300.00 1.000 3,300 002 TEMPORARY FENCE (TYPE DESERT TORTOISE) LF 7.5000 39,825.00 0.000 0 003 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 795.0000 795.00 0.000 0 004 CONSTRUCTION AREA SIGNS LS 9,300.0000 9,300.00 0.100 930.00 0.500 4,650 005 TRAFFIC CONTROL SYSTEM LS 102,000.0000 102,000.00 0.000 0 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.6000 10,560.00 0.000 0 007 CHANNELIZER (SURFACE MOUNTED) EA 38.0000 2,508.00 0.000 0 008 TRAFFIC PLASTIC DRUM EA 28.0000 728.00 0.000 0 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 9,800.0000 19,600.00 0.000 0 010 TEMPORARY RAILING (TYPE K) LF 21.8500 91,770.00 0.000 0 011 TEMPORARY CRASH CUSHION MODULE EA 380.0000 21,280.00 0.000 0 012 JOB SITE MANAGEMENT LS 17,000.0000 17,000.00 0.000 0 013 PREPARE STORM WATER POLLUTION PREVENTION LS 1,600.0000 1,600.00 0.750 1,200 PLAN 014 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 015 TEMPORARY COVER SQYD 4.3500 10,875.00 0.000 0 016 TEMPORARY FIBER ROLL LF 3.1200 7,176.00 0.000 0 017 TEMPORARY GRAVEL BAG BERM LF 11.1100 19,998.00 0.000 0 018 STREET SWEEPING LS 12,000.0000 12,000.00 0.000 0 019 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.1100 7,104.00 0.000 0 STRIPE (HAZARDOUS WASTE) 020 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 12,000.0000 12,000.00 0.000 0 021 NATURAL RESOURCE PROTECTION PLAN LS 1,250.0000 1,250.00 0.000 0 022 REMOVE PAINTED TRAFFIC STRIPE LF 0.8500 14,025.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/26/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K3104 TIME 08:59 AM ESTIMATE NO. 02 BID OPENING 07/11/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 03/26/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.7200 5,504.00 0.000 0 024 REMOVE PAVEMENT MARKER EA 1.1000 308.00 0.000 0 025 REMOVE ROADSIDE SIGN (WOOD POST) EA 110.0000 550.00 0.000 0 026 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 19.0000 8,930.00 0.000 0 027 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 17.0000 46,070.00 0.000 0 028 CLEARING AND GRUBBING (LS) LS 51,000.0000 51,000.00 0.000 0 029 ROADWAY EXCAVATION CY 12.0000 510,000.00 0.000 0 030 SHOULDER BACKING TON 156.0000 10,920.00 0.000 0 031 PLANT (GROUP A) EA 31.0000 30,101.00 0.000 0 032 PLANT ESTABLISHMENT WORK LS 18,200.0000 18,200.00 0.000 0 033 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,050.0000 2,100.00 0.000 0 034 DUFF ACRE 6,200.0000 16,740.00 0.000 0 035 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 0.5000 58,000.00 0.000 0 036 HYDROSEED SQFT 0.0700 8,120.00 0.000 0 037 CLASS 2 AGGREGATE BASE (CY) CY 37.0000 157,620.00 0.000 0 038 HOT MIX ASPHALT (TYPE C) TON 111.0000 466,200.00 0.000 0 039 RUMBLE STRIP (GROUND-IN) STA 412.0000 10,712.00 0.000 0 040 LIQUID ASPHALT (PRIME COAT) TON 995.6000 9,956.00 0.000 0 041 TACK COAT TON 750.0000 4,500.00 0.000 0 042 DELINEATOR (CLASS 1) EA 55.0000 1,540.00 0.000 0 043 THERMOPLASTIC TRAFFIC STRIPE LF 1.3400 12,864.00 0.000 0 (SPRAYABLE) 044 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 1,680.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 03/26/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K3104 TIME 08:59 AM ESTIMATE NO. 02 BID OPENING 07/11/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 03/26/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 930.00 9,150.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 930.00 9,150.00 045 MOBILIZATION LS 183,813.0000 183,813.00 0.000 0 ORIGINAL CONTRACT AMOUNT 2,022,122.00 TOTAL WORK COMPLETED 930.00 9,150.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 930.00 9,150.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/15/13 340 10/30/13 10/30/13 08/01/14 0 95 0 0 0% 0% PROGRESS IS SATISFACTORY RIGHT OF WAY DELAY DAVIS, DARCY RESIDENT ENGINEER PROGRAM CAS145 DATE 03/26/14