PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/20/14 EST. NO.05 TIME 03:20 PM R.E. NAME: DAVIS, DARCY 08-0K3104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/20/14 EST. NO.05 TIME 03:20 PM R.E. NAME: DAVIS, DARCY 08-0K3104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/20/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K3104 TIME 03:20 PM ESTIMATE NO. 05 BID OPENING 07/11/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/14 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 06/20/14 LOCATION PROGRESS ESTIMATE 08-SBD-95-51.2/51.6 ----------------- LAS VEGAS PAVING CORPORATION IN SAN BERNARDINO COUNTY FROM 13.9 4420 SOUTH DECATUR BLVD MILES NORTH OF HAVASU LAKE ROAD LAS VEGAS NV 89103 TO 5.5 MILES SOUTH OF ROUTE 40/95 SEPARATION. FED. AID NO. STP-P095(24)E REALIGN RDWY W HMA OVER AGGREGATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,300.0000 3,300.00 1.000 3,300 002 TEMPORARY FENCE (TYPE DESERT TORTOISE) LF 7.5000 39,825.00 3,982.500 29,868 003 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 795.0000 795.00 0.300 238.50 0.900 715 004 CONSTRUCTION AREA SIGNS LS 9,300.0000 9,300.00 0.100 930.00 0.800 7,440 005 TRAFFIC CONTROL SYSTEM LS 102,000.0000 102,000.00 0.200 20,400.00 0.600 61,200 006 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.6000 10,560.00 9,900.000 5,940.00 19,584.000 11,750 007 CHANNELIZER (SURFACE MOUNTED) EA 38.0000 2,508.00 40.000 1,520 008 TRAFFIC PLASTIC DRUM EA 28.0000 728.00 26.000 728.00 26.000 728 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 9,800.0000 19,600.00 1.000 9,800 010 TEMPORARY RAILING (TYPE K) LF 21.8500 91,770.00 1,240.000 27,094.00 4,020.000 87,837 011 TEMPORARY CRASH CUSHION MODULE EA 380.0000 21,280.00 42.000 15,960.00 56.000 21,280 012 JOB SITE MANAGEMENT LS 17,000.0000 17,000.00 0.200 3,400.00 0.400 6,800 013 PREPARE STORM WATER POLLUTION PREVENTION LS 1,600.0000 1,600.00 0.750 1,200 PLAN 014 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 015 TEMPORARY COVER SQYD 4.3500 10,875.00 0.000 0 016 TEMPORARY FIBER ROLL LF 3.1200 7,176.00 0.000 0 017 TEMPORARY GRAVEL BAG BERM LF 11.1100 19,998.00 0.000 0 018 STREET SWEEPING LS 12,000.0000 12,000.00 0.200 2,400.00 0.200 2,400 019 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.1100 7,104.00 6,415.000 7,120 STRIPE (HAZARDOUS WASTE) 020 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 12,000.0000 12,000.00 0.100 1,200.00 0.100 1,200 021 NATURAL RESOURCE PROTECTION PLAN LS 1,250.0000 1,250.00 1.000 1,250 022 REMOVE PAINTED TRAFFIC STRIPE LF 0.8500 14,025.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/20/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K3104 TIME 03:20 PM ESTIMATE NO. 05 BID OPENING 07/11/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/14 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 06/20/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.7200 5,504.00 3,228.000 5,552 024 REMOVE PAVEMENT MARKER EA 1.1000 308.00 267.000 293 025 REMOVE ROADSIDE SIGN (WOOD POST) EA 110.0000 550.00 4.000 440 026 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 19.0000 8,930.00 262.250 4,982.75 262.250 4,982 027 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 17.0000 46,070.00 2,706.890 46,017.13 2,706.890 46,017 028 CLEARING AND GRUBBING (LS) LS 51,000.0000 51,000.00 0.250 12,750.00 1.000 51,000 029 ROADWAY EXCAVATION CY 12.0000 510,000.00 36,142.000 433,704 030 SHOULDER BACKING TON 156.0000 10,920.00 9.280 1,447.68 9.280 1,447 031 PLANT (GROUP A) EA 31.0000 30,101.00 0.000 0 032 PLANT ESTABLISHMENT WORK LS 18,200.0000 18,200.00 0.000 0 033 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,050.0000 2,100.00 0.000 0 034 DUFF ACRE 6,200.0000 16,740.00 2.000 12,400 035 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 0.5000 58,000.00 0.000 0 036 HYDROSEED SQFT 0.0700 8,120.00 0.000 0 037 CLASS 2 AGGREGATE BASE (CY) CY 37.0000 157,620.00 3,665.000 135,605 038 HOT MIX ASPHALT (TYPE C) TON 111.0000 466,200.00 2,696.790 299,343.69 2,696.790 299,343 039 RUMBLE STRIP (GROUND-IN) STA 412.0000 10,712.00 0.000 0 040 LIQUID ASPHALT (PRIME COAT) TON 995.6000 9,956.00 5.850 5,824.26 5.850 5,824 041 TACK COAT TON 750.0000 4,500.00 2.570 1,927.50 2.570 1,927 042 DELINEATOR (CLASS 1) EA 55.0000 1,540.00 0.000 0 043 THERMOPLASTIC TRAFFIC STRIPE LF 1.3400 12,864.00 0.000 0 (SPRAYABLE) 044 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 1,680.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/20/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K3104 TIME 03:20 PM ESTIMATE NO. 05 BID OPENING 07/11/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/14 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 06/20/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 450,583.51 1,253,948.17 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 450,583.51 1,253,948.17 045 MOBILIZATION LS 183,813.0000 183,813.00 0.050 9,190.65 1.000 183,813 ORIGINAL CONTRACT AMOUNT 2,022,122.00 TOTAL WORK COMPLETED 459,774.16 1,437,761.17 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 459,774.16 1,437,761.17 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/15/13 340 10/30/13 10/30/13 08/20/14 48 110 0 0 71% 14% PROGRESS IS SATISFACTORY DAVIS, DARCY RESIDENT ENGINEER PROGRAM CAS145 DATE 06/20/14