PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/25/08 EST. NO.01 TIME 10:17 AM R.E. NAME: CALIXTO, MIGUEL 08-0K9204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/25/08 EST. NO.01 TIME 10:17 AM R.E. NAME: CALIXTO, MIGUEL 08-0K9204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/25/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K9204 TIME 10:17 AM ESTIMATE NO. 01 BID OPENING 07/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: CALIXTO, MIGUEL DATE OF THIS ESTIMATE 11/25/08 LOCATION PROGRESS ESTIMATE 08-RIV-91-21.5/21.6 ----------------- ALL AMERICAN ASPHALT IN RIVERSIDE COUNTY IN RIVERSIDE ON P O BOX 2229 ROUTE 215 AND ON ROUTE 91 CORONA CA 928782229 FED. AID NO. N O N E PLACE RUBBERIZED HOT MIX ASPHALT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 0.250 625.00 0.250 625.00 02 PREPARE WATER POLLUTION CONTROL LS 533.0000 533.00 0.750 399.75 0.750 399.75 PROGRAM 03 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 4,000.00 0.000 0.00 04 TEMPORARY DRAINAGE INLET PROTECTION EA 70.0000 4,550.00 5.000 350.00 5.000 350.00 05 STREET SWEEPING LS 4,100.0000 4,100.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 12,300.0000 12,300.00 0.000 0.00 S) 07 TRAFFIC CONTROL SYSTEM LS 33,000.0000 33,000.00 0.250 8,250.00 0.250 8,250.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,700.0000 10,800.00 2.000 5,400.00 2.000 5,400.00 S) 09 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 0.7000 91,700.00 24,650.450 17,255.32 24,650.450 17,255.32 S) 10 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 1.000 1,600.00 1.000 1,600.00 11 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 102.0000 1,805,400.00 3,292.950 335,880.90 3,292.950 335,880.90 12 TACK COAT TON 550.0000 27,500.00 0.000 0.00 13 THERMOPLASTIC PAVEMENT MARKING SQFT 2.1000 2,100.00 0.000 0.00 S) 14 THERMOPLASTIC TRAFFIC STRIPE LF 0.1100 16,940.00 0.000 0.00 S) (SPRAYABLE) 15 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 5,470.00 0.000 0.00 S) 16 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.1000 8,253.00 0.000 0.00 S) 17 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION 18 DETECTOR LOOP EA 333.0000 22,644.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 11/25/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0K9204 TIME 10:17 AM ESTIMATE NO. 01 BID OPENING 07/17/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: CALIXTO, MIGUEL DATE OF THIS ESTIMATE 11/25/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 369,760.97 369,760.97 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 369,760.97 369,760.97 19 MOBILIZATION LS 56,000.0000 56,000.00 0.750 42,000.00 0.750 42,000.00 ORIGINAL CONTRACT AMOUNT 2,109,890.00 TOTAL WORK COMPLETED 411,760.97 411,760.97 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 411,760.97 411,760.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/19/08 70 00/00/00 00/00/00 12/18/08 52 3 0 0 20% 74% PROGRESS UNSATISFACTORY CALIXTO, MIGUEL RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 11/25/08