PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/26/14 EST. NO.02 TIME 09:07 AM R.E. NAME: OBADIKE, JOSEPH 08-0M3104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/26/14 EST. NO.02 TIME 09:07 AM R.E. NAME: OBADIKE, JOSEPH 08-0M3104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE POLE INSPECTION -1,000.00 01 WPCP WITHOLDING -3,000.00 01 0.00 -4,000.00 TOTAL DEDUCTIONS 0.00 -4,000.00 PROGRAM CAS145 PAGE 1 DATE 03/26/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0M3104 TIME 09:07 AM ESTIMATE NO. 02 BID OPENING 08/08/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: OBADIKE, JOSEPH DATE OF THIS ESTIMATE 03/26/14 LOCATION PROGRESS ESTIMATE 08-RIV-60-13.3/16.6 ----------------- RAKAN INC FREDERICK ST, HEACOCK ST AND PERRIS 2312 PARK AVE SUITE 116 BLVD IN MORENO VALLEY, ADAMS ST, TUSTIN CA 92782 MADISON ST AND DAY ST IN RIVERSIDE. AND WATERMAN AVE IN SAN BERNARDINO FED. AID NO. N O N E UPGRADE PEDESTRIAN FACILITIES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,800.0000 1,800.00 0.500 900.00 1.000 1,800 002 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.750 7,500 003 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.250 2,500.00 0.750 7,500 004 TYPE III BARRICADE EA 140.0000 5,880.00 30.000 4,200 005 JOB SITE MANAGEMENT LS 1,800.0000 1,800.00 0.250 450.00 0.750 1,350 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.250 250.00 0.750 750 007 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 300.00 1.000 150 008 TEMPORARY CONCRETE WASHOUT LS 600.0000 600.00 0.500 300.00 1.000 600 009 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.2000 1,870.00 850.000 1,870.00 850.000 1,870 010 RELOCATE ROADSIDE SIGN (WOOD POST) EA 150.0000 300.00 1.000 150.00 2.000 300 011 REMOVE CONCRETE (CY) CY 250.0000 11,500.00 10.000 2,500.00 40.000 10,000 012 DRAINAGE INLET MARKER EA 100.0000 200.00 1.000 100.00 1.000 100 013 DETECTABLE WARNING SURFACE SQFT 37.0000 9,620.00 200.000 7,400.00 200.000 7,400 014 MINOR CONCRETE (CURB, SIDEWALK AND CY 600.0000 30,000.00 5.000 3,000.00 45.000 27,000 CURB RAMP) 015 THERMOPLASTIC PAVEMENT MARKING SQFT 4.5000 3,690.00 820.000 3,690.00 820.000 3,690 016 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.250 250.00 0.750 750 SYSTEM ELEMENTS DURING CONSTRUCTION 017 MODIFY SIGNAL LS 96,000.0000 96,000.00 0.100 9,600.00 0.250 24,000 PROGRAM CAS145 PAGE 2 DATE 03/26/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0M3104 TIME 09:07 AM ESTIMATE NO. 02 BID OPENING 08/08/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: OBADIKE, JOSEPH DATE OF THIS ESTIMATE 03/26/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 32,960.00 98,960.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 32,960.00 98,960.00 ORIGINAL CONTRACT AMOUNT 185,560.00 TOTAL WORK COMPLETED 32,960.00 98,960.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -4,000.00 TOTAL 32,960.00 94,960.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/19/13 30 11/13/13 11/13/13 04/03/14 20 70 0 0 53% 67% PROGRESS IS SATISFACTORY OBADIKE, JOSEPH RESIDENT ENGINEER PROGRAM CAS145 DATE 03/26/14