PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/28/11 EST. NO.02 TIME 01:34 PM R.E. NAME: DAVIS, DARCY 08-0P6404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/28/11 EST. NO.02 TIME 01:34 PM R.E. NAME: DAVIS, DARCY 08-0P6404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P6404 TIME 01:34 PM ESTIMATE NO. 02 BID OPENING 05/12/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/18/11 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 11/28/11 LOCATION PROGRESS ESTIMATE 08-SBD-95-57.2/80.5 ----------------- LAS VEGAS PAVING IN SAN BERNARDINO COUNTY NEAR 4420 S DECATUR BLVD NEEDLES FROM ROUTE 40 WEST LAS VEGAS NV 89103 JUNCTION TO NEVADA STATELINE FED. AID NO. ACNH-PO95(22)E PLACE HMA OVERLAY AND REPLACE AC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 80,870.0000 80,870.00 0.000 0.00 002 PREPARE WATER POLLUTION CONTROL LS 920.0000 920.00 0.000 0.00 PROGRAM 003 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 0.060 180.00 0.460 1,380.00 004 TRAFFIC CONTROL SYSTEM LS 108,000.0000 108,000.00 0.000 0.00 005 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,575.0000 4,725.00 0.000 0.00 006 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.2500 3,960.00 0.000 0.00 007 LEAD COMPLIANCE PLAN LS 600.0000 600.00 0.000 0.00 008 REPLACE ASPHALT CONCRETE SURFACING CY 250.0000 745,000.00 0.000 0.00 009 HOT MIX ASPHALT TON 95.0000 1,748,000.00 0.000 0.00 010 CENTERLINE RUMBLE STRIP (HMA, GROUND-IN STA 200.0000 5,400.00 0.000 0.00 INDENTATION) 011 DATA CORE LS 1,950.0000 1,950.00 0.000 0.00 012 TACK COAT TON 790.0000 60,830.00 0.000 0.00 013 THERMOPLASTIC PAVEMENT MARKING SQFT 4.2000 1,806.00 0.000 0.00 014 THERMOPLASTIC TRAFFIC STRIPE LF 0.2400 88,800.00 0.000 0.00 (SPRAYABLE) 015 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.1000 441.00 0.000 0.00 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.9500 9,006.00 0.000 0.00 017 PAVEMENT MARKER EA 10.2000 30,702.00 0.000 0.00 (RETROREFLECTIVE-RECESSED) 018 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 15,200.0000 15,200.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 019 INDUCTIVE LOOP DETECTOR EA 685.0000 5,480.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 11/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P6404 TIME 01:34 PM ESTIMATE NO. 02 BID OPENING 05/12/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/18/11 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 11/28/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 180.00 1,380.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 180.00 1,380.00 ORIGINAL CONTRACT AMOUNT 2,914,690.00 TOTAL WORK COMPLETED 180.00 1,380.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 180.00 1,380.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/07/11 45 09/22/11 09/22/11 11/29/11 40 0 0 0 0% 89% PROGRESS UNSATISFACTORY DAVIS, DARCY RESIDENT ENGINEER PROGRAM CAS145 DATE 11/28/11