PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/14/12 EST. NO.03 TIME 12:31 PM R.E. NAME: QURESHI, MUJAHID 08-0P7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 836.52 E.W. @ L.S.(+) 070512 N 01 0 002 0001 4,078.00 A.C. @ L.S.(+) 080612 N 02 0 4,914.52 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 4,914.52 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/14/12 EST. NO.03 TIME 12:31 PM R.E. NAME: QURESHI, MUJAHID 08-0P7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE SOLID WASTE DISPOSAL -10,000.00 02 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 09/14/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P7104 TIME 12:31 PM ESTIMATE NO. 03 BID OPENING 03/08/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/10/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 09/14/12 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 08-RIV-74-27.5/ .0 ---------------------------------- 08-RIV-215-R8.9/R31.0 PETERSON-CHASE GENERAL REHABILITATE 12 BRIDGES ON ROUTES ENGINEERING CONSTRUCTION INC 74 AND 215 AT VARIOUS LOCATIONS 1792 KAISER AVENUE IRVINE CA 92614 FED. AID NO. N O N E METHACRYLATE SEAL, REPLACE/REPAIR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 900.0000 900.00 1.000 900.00 002 PREPARE WATER POLLUTION CONTROL LS 1,218.0000 1,218.00 1.000 1,218.00 PROGRAM 003 CONSTRUCTION AREA SIGNS LS 6,520.0000 6,520.00 1.000 6,520.00 004 TRAFFIC CONTROL SYSTEM LS 27,000.0000 27,000.00 1.000 27,000.00 005 PORTABLE CHANGEABLE MESSAGE SIGN EA 900.0000 8,100.00 5.000 4,500.00 006 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 8,780.00 4,889.000 4,889.00 STRIPE (HAZARDOUS WASTE) 007 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 7,416.00 5,325.000 4,792.50 008 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.2000 2,024.00 253.000 556.60 009 REMOVE PAVEMENT MARKER EA 1.1000 539.00 360.000 396.00 010 CLEAN BRIDGE DECK SQFT 0.0700 7,021.28 42,134.000 2,949.38 011 LEAD COMPLIANCE PLAN LS 3,300.0000 3,300.00 1.000 3,300.00 012 AGGREGATE BASE (APPROACH SLAB) CY 486.0000 8,262.00 13.780 6,697.08 30.780 14,959.08 013 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,103.0000 186,407.00 169.000 186,407.00 (F) (TYPE R) 014 CLEAN EXPANSION JOINT LF 17.0000 3,638.00 214.000 3,638.00 015 REPAIR JOINT SPALLS CF 222.0000 4,440.00 19.000 4,218.00 20.000 4,440.00 016 PUBLIC SAFETY PLAN LS 6,539.0000 6,539.00 1.000 6,539.00 017 JOINT SEAL (MR 1/2") LF 19.0000 4,066.00 214.000 4,066.00 018 JOINT SEAL (MR 1 1/2") LF 47.9000 7,280.80 152.000 7,280.80 019 TREAT BRIDGE DECK SQFT 0.2300 23,069.92 100,304.000 23,069.92 (F) 020 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 37.0000 46,472.00 64.500 2,386.50 1,095.500 40,533.50 021 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.9800 1,821.60 873.000 1,728.54 022 THERMOPLASTIC PAVEMENT MARKING SQFT 4.4000 2,552.00 1,270.000 5,588.00 PROGRAM CAS145 PAGE 2 DATE 09/14/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P7104 TIME 12:31 PM ESTIMATE NO. 03 BID OPENING 03/08/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/10/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 09/14/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC TRAFFIC STRIPE LF 0.6300 9,387.00 11,908.000 7,502.04 (SPRAYABLE) 024 PAVEMENT MARKER (NON-REFLECTIVE) EA 4.2000 798.00 104.000 436.80 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.4000 1,584.00 336.000 1,478.40 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 600.0000 600.00 1.000 600.00 SYSTEM ELEMENTS DURING CONSTRUCTION 027 INDUCTIVE LOOP DETECTOR LS 2,886.0000 2,886.00 1.000 2,886.00 PROGRAM CAS145 PAGE 3 DATE 09/14/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P7104 TIME 12:31 PM ESTIMATE NO. 03 BID OPENING 03/08/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/10/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 09/14/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 13,301.58 368,174.56 ADJUSTMENT OF COMPENSATION 4,078.00 4,078.00 EXTRA WORK 836.52 836.52 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 18,216.10 373,089.08 028 MOBILIZATION LS 33,600.0000 33,600.00 1.000 33,600.00 ORIGINAL CONTRACT AMOUNT 416,221.60 TOTAL WORK COMPLETED 18,216.10 406,689.08 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -10,000.00 TOTAL 18,216.10 396,689.08 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/25/12 70 05/10/12 05/10/12 08/10/12 60 5 0 0 100% 100% QURESHI, MUJAHID RESIDENT ENGINEER PROGRAM CAS145 DATE 09/14/12