PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/05/13 EST. NO.07 TIME 09:02 AM R.E. NAME: QURESHI, MUJAHID 08-0P8504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/05/13 EST. NO.07 TIME 09:02 AM R.E. NAME: QURESHI, MUJAHID 08-0P8504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION FEDERAL FINAL REPORT -10,000.00 05 FEDERAL FINAL REPORT 10,000.00 06 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 02/05/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P8504 TIME 09:02 AM ESTIMATE NO. 07 BID OPENING 04/12/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/30/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 02/05/13 LOCATION FINAL ESTIMATE 08-SBD-60-R0.0/R9.9 -------------- SECURITY PAVING COMPANY INC IN SAN BERNARDINO & RIVERSIDE CO ON P O BOX 1489 RTE 60 FROM LOSANGELES COLINE TO SUN VALLEY CA 913531489 RTE 60/90/215 SEPARATION & ON RTE 215 FROM MARTIN LUTHER KING BLVD UNDERCROSSING TO RTE 60/91/215 FED. AID NO. N O N E REHABILITATE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 1.000 3,000 002 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000 PROGRAM 003 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 8,500.0000 8,500.00 1.000 8,500 004 CONSTRUCTION AREA SIGNS LS 16,000.0000 16,000.00 1.000 16,000 005 TRAFFIC CONTROL SYSTEM LS 80,000.0000 80,000.00 1.000 80,000 006 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,600.0000 3,200.00 2.000 3,200 007 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 16.0000 1,248.00 0.000 0 STRIPE (HAZARDOUS WASTE) 008 LEAD COMPLIANCE PLAN LS 2,675.0000 2,675.00 1.000 2,675 009 DATA CORE LS 100.0000 100.00 0.000 0 010 DOWEL BAR (DRILL AND BOND) EA 11.3000 133,340.00 7,425.000 83,902 011 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 384.0000 1,086,720.00 2,987.500 1,147,200 012 GRIND EXISTING CONCRETE SQYD 7.7500 87,575.00 14,588.700 113,062 PAVEMENT 013 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.1500 2,107.00 0.000 0 014 THERMOPLASTIC TRAFFIC STRIPE LF 0.4300 10,535.00 24,799.000 10,663 (SPRAYABLE) 015 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2000 5,616.00 1,548.000 1,857 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.7500 4,950.00 411.000 1,541 017 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 428.0000 428.00 1.000 428 SYSTEM ELEMENTS DURING CONSTRUCTION 018 INDUCTIVE LOOP DETECTOR (EA) EA 455.0000 68,250.00 65.000 29,575 019 MODIFY VEHICLE SENSOR NODE EA 118.0000 3,776.00 0.000 0 020 VEHICLE SENSOR NODE REPLACEMENT EA 1,200.0000 38,400.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/05/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0P8504 TIME 09:02 AM ESTIMATE NO. 07 BID OPENING 04/12/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/30/12 R.E. NAME: QURESHI, MUJAHID DATE OF THIS ESTIMATE 02/05/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 1,502,605.35 ADJUSTMENT OF COMPENSATION 0.00 16,900.00 EXTRA WORK 0.00 9,120.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 1,528,625.35 021 MOBILIZATION LS 80,000.0000 80,000.00 1.000 80,000 ORIGINAL CONTRACT AMOUNT 1,637,420.00 TOTAL WORK COMPLETED 0.00 1,608,625.35 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 1,608,625.35 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/07/12 70 06/22/12 06/22/12 10/30/12 69 21 0 0 100% 100% QURESHI, MUJAHID RESIDENT ENGINEER PROGRAM CAS145 DATE 02/05/13