PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/18 EST. NO. 002 TIME 11:17 AM R.E. NAME: SKEITH, JONATHAN 08-0Q6904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/18 EST. NO. 002 TIME 11:17 AM R.E. NAME: SKEITH, JONATHAN 08-0Q6904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0Q6904 TIME 11:17 AM ESTIMATE NO. 002 BID OPENING 09/20/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: SKEITH, JONATHAN DATE OF THIS ESTIMATE 04/25/18 LOCATION PROGRESS ESTIMATE 08-SBD-330-40.6/43.5 ----------------- UNITED ENGINEERING & NEAR RUNNING SPRINGS FROM 2 MILES CONSTRUCTION, INC S/O OLD CITY CREEK TO 0.6 MI S/O 336 NORTH CENTRAL AVE #10A JCT 18 GLENDALE CA 91203 FED. AID NO. N O N E REPAIR/REPLACE CULVERTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 1.000 3,500 003 TRAFFIC CONTROL SYSTEM LS 75,000.0000 75,000.00 0.340 25,500.00 0.670 50,250 004 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 10.0000 840.00 0.000 0 FOR CONSTRUCTION AREA SIGNS 005 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,500.0000 5,000.00 0.500 1,250.00 1.000 2,500 006 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.500 2,000.00 0.750 3,000 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,000.0000 3,000.00 1.000 3,000 008 TEMPORARY GRAVEL BAG BERM LF 30.0000 1,500.00 0.000 0 009 TEMPORARY CONCRETE WASHOUT LS 1,500.0000 1,500.00 0.000 0 010 TREATED WOOD WASTE LB 2.0000 600.00 0.000 0 011 CONTRACTOR-SUPPLIED BIOLOGIST (DAY) DAY 900.0000 31,500.00 15.000 13,500.00 21.000 18,900 012 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 3,000.0000 6,000.00 2.000 6,000.00 2.000 6,000 013 STRUCTURE EXCAVATION CY 250.0000 17,500.00 47.000 11,750.00 47.000 11,750 014 STRUCTURE BACKFILL CY 500.0000 19,000.00 19.000 9,500.00 19.000 9,500 015 ROADSIDE CLEARING LS 12,000.0000 12,000.00 0.340 4,080.00 0.670 8,040 016 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 100.0000 13,000.00 87.000 8,700.00 87.000 8,700 017 TEMPORARY SHORING LS 15,000.0000 15,000.00 0.500 7,500.00 0.500 7,500 018 MINOR CONCRETE (MINOR STRUCTURE) CY 1,500.0000 18,000.00 6.000 9,000.00 6.000 9,000 (F) 019 24" CORRUGATED STEEL PIPE (.064" THICK) LF 1,200.0000 12,000.00 5.000 6,000.00 5.000 6,000 020 36" PRECAST CONCRETE PIPE INLET LF 1,000.0000 14,000.00 7.000 7,000.00 7.000 7,000 021 REMOVE PIPE (LF) LF 1,000.0000 18,000.00 12.000 12,000.00 12.000 12,000 022 REMOVE INLET EA 1,000.0000 3,000.00 3.000 3,000.00 3.000 3,000 PROGRAM CAS145 PAGE 2 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0Q6904 TIME 11:17 AM ESTIMATE NO. 002 BID OPENING 09/20/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: SKEITH, JONATHAN DATE OF THIS ESTIMATE 04/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 24" ALTERNATIVE PIPELINER LF 220.0000 354,200.00 470.000 103,400.00 470.000 103,400 024 30" ALTERNATIVE PIPELINER LF 250.0000 50,000.00 125.000 31,250.00 125.000 31,250 025 CLEANING, INSPECTING, AND PREPARING LF 25.0000 45,250.00 603.000 15,075.00 1,203.000 30,075 CULVERT (LF) 026 CULVERT SLURRY-CEMENT BACKFILL CY 350.0000 29,050.00 20.500 7,175.00 20.500 7,175 027 MISCELLANEOUS IRON AND STEEL LB 8.0000 13,440.00 840.000 6,720.00 840.000 6,720 (F) 028 MARKER (CULVERT) EA 75.0000 4,275.00 0.000 0 029 REMOVE MARKER EA 20.0000 1,140.00 0.000 0 030 REMOVE ROADSIDE SIGN EA 200.0000 600.00 0.000 0 031 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 680.00 0.000 0 (0.063"-UNFRAMED) 032 ROADSIDE SIGN - ONE POST EA 500.0000 1,500.00 0.000 0 033 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 10.0000 340.00 0.000 0 034 ADJUST GUARDRAIL LF 250.0000 4,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0Q6904 TIME 11:17 AM ESTIMATE NO. 002 BID OPENING 09/20/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: SKEITH, JONATHAN DATE OF THIS ESTIMATE 04/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 290,400.00 350,760.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 290,400.00 350,760.00 ORIGINAL CONTRACT AMOUNT 781,415.00 TOTAL WORK COMPLETED 290,400.00 350,760.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 290,400.00 350,760.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/18/17 35 02/21/18 12/28/17 05/03/18 21 49 3 0 43% 45% PROGRESS IS SATISFACTORY SKEITH, JONATHAN RESIDENT ENGINEER PROGRAM CAS145 DATE 04/25/18