PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/27/20 EST. NO. 001 TIME 07:10 AM R.E. NAME: DAVIS, DARCY 08-0R1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/27/20 EST. NO. 001 TIME 07:10 AM R.E. NAME: DAVIS, DARCY 08-0R1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FEDERAL TRAINEE PLAN -3,987.84 001 -3,987.84 -3,987.84 TOTAL DEDUCTIONS -3,987.84 -3,987.84 PROGRAM CAS145 PAGE 1 DATE 02/27/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 07:10 AM ESTIMATE NO. 001 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 02/27/20 LOCATION RERUN PROGRESS ESTIMATE 08-SBD-40-R75.0/R100.0 ----------------------- GRANITE CONSTRUCTION COMPANY BETWEEN BADGER WASH TO ESSEX ROAD 38000 MONROE STREET; OC INDIO CA 92203 FED. AID NO. HSIM-040 -1(86)E REGRADE MEDIAN CROSS SLOPE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,300.0000 1,300.00 0.000 0 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 500.6000 500.60 0.100 50.06 0.100 50 003 TIME-RELATED OVERHEAD (WDAY) WDAY 4,000.0000 1,000,000.00 0.050 200.00 0.050 200 004 DEVELOP WATER SUPPLY LS 48,638.0000 48,638.00 0.100 4,863.80 0.100 4,863 005 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 0.000 0 006 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.0000 1,600.00 0.000 0 FOR CONSTRUCTION AREA SIGNS 007 TRAFFIC CONTROL SYSTEM LS 894,000.0000 894,000.00 0.000 0 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 35,000.0000 35,000.00 0.000 0 009 TEMPORARY RAILING (TYPE K) LF 70.0000 84,000.00 0.000 0 010 ALTERNATIVE TEMPORARY CRASH CUSHION EA 11,000.0000 33,000.00 0.000 0 011 JOB SITE MANAGEMENT LS 42,000.0000 42,000.00 0.050 2,100.00 0.050 2,100 012 PREPARE STORM WATER POLLUTION PREVENTION LS 1,650.0000 1,650.00 0.750 1,237.50 0.750 1,237 PLAN 013 RAIN EVENT ACTION PLAN EA 500.0000 5,500.00 0.000 0 014 STORM WATER SAMPLING AND ANALYSIS DAY EA 200.0000 4,400.00 0.000 0 015 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 016 TEMPORARY EROSION CONTROL BLANKET SQYD 4.3000 4,300.00 0.000 0 017 TEMPORARY SOIL BINDER SQYD 0.2000 2,000.00 0.000 0 018 TEMPORARY COVER SQYD 1.5000 30,000.00 0.000 0 019 TEMPORARY FIBER ROLL LF 2.5000 15,000.00 0.000 0 020 TEMPORARY GRAVEL BAG BERM LF 20.0000 80,000.00 0.000 0 021 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 48,000.00 0.000 0 022 TEMPORARY CONCRETE WASHOUT LS 8,000.0000 8,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/27/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 07:10 AM ESTIMATE NO. 001 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 02/27/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.4000 9,680.00 0.000 0 024 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 150,000.0000 150,000.00 0.050 7,500.00 0.050 7,500 025 TEMPORARY HIGH-VISIBILITY FENCE LF 3.2000 422,400.00 0.000 0 026 CLEARING AND GRUBBING (LS) LS 345,000.0000 345,000.00 0.000 0 027 DUST PALLIATIVE LS 63,750.0000 63,750.00 0.000 0 028 ROADWAY EXCAVATION CY 5.0000 59,500.00 0.000 0 029 SHOULDER BACKING TON 50.0000 390,000.00 0.000 0 030 IMPORTED BORROW (CY) CY 22.0000 6,886,000.00 0.000 0 031 PLANT (GROUP A) EA 25.0000 56,500.00 0.000 0 032 PLANT ESTABLISHMENT WORK LS 27,500.0000 27,500.00 0.000 0 033 WOOD MULCH CY 195.0000 13,260.00 0.000 0 034 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,000.0000 4,000.00 0.000 0 035 DUFF (ACRE) ACRE 1,000.0000 150,000.00 0.000 0 036 FIBER ROLLS LF 2.8000 106.40 0.000 0 037 HYDROSEED SQFT 0.0500 315,500.00 0.000 0 038 CLASS 2 AGGREGATE BASE (CY) CY 220.0000 301,400.00 0.000 0 039 MINOR HOT MIX ASPHALT TON 840.0000 1,848.00 0.000 0 040 PLACE HOT MIX ASPHALT SQYD 195.0000 1,950.00 0.000 0 (MISCELLANEOUS AREA) 041 STRUCTURAL CONCRETE, BOX CULVERT CY 2,800.0000 89,600.00 0.000 0 (F) 042 BAR REINFORCING STEEL LB 5.5000 16,819.00 0.000 0 (F) 043 48" REINFORCED CONCRETE PIPE LF 900.0000 14,400.00 0.000 0 044 54" REINFORCED CONCRETE PIPE LF 1,000.0000 8,000.00 0.000 0 045 60" REINFORCED CONCRETE PIPE LF 1,000.0000 24,000.00 0.000 0 046 72" REINFORCED CONCRETE PIPE LF 900.0000 54,900.00 0.000 0 047 36" CORRUGATED STEEL PIPE (.079" THICK) LF 450.0000 144,000.00 0.000 0 048 42" CORRUGATED STEEL PIPE (.109" THICK) LF 500.0000 115,000.00 0.000 0 049 48" CORRUGATED STEEL PIPE (.109" THICK) LF 330.0000 66,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 02/27/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 07:10 AM ESTIMATE NO. 001 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 02/27/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 49" X 33" CORRUGATED STEEL PIPE ARCH LF 330.0000 56,100.00 0.000 0 (.109" THICK) 051 57" X 38" CORRUGATED STEEL PIPE ARCH LF 350.0000 63,000.00 0.000 0 (.109" THICK) 052 64" X 43" CORRUGATED STEEL PIPE ARCH LF 450.0000 589,500.00 0.000 0 (.109" THICK) 053 77" X 52" CORRUGATED STEEL PIPE ARCH LF 500.0000 195,000.00 0.000 0 (.109" THICK) 054 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 055 36" CORRUGATED STEEL PIPE INLET LF 1,200.0000 34,800.00 0.000 0 (.079" THICK) 056 36" STEEL FLARED END SECTION EA 850.0000 26,350.00 0.000 0 057 42" STEEL FLARED END SECTION EA 1,200.0000 22,800.00 0.000 0 058 48" STEEL FLARED END SECTION EA 1,500.0000 10,500.00 0.000 0 059 54" STEEL FLARED END SECTION EA 1,700.0000 1,700.00 0.000 0 060 60" STEEL FLARED END SECTION EA 2,200.0000 4,400.00 0.000 0 061 72" STEEL FLARED END SECTION EA 2,800.0000 8,400.00 0.000 0 062 49" X 33" STEEL FLARED END PIPE ARCH EA 1,100.0000 8,800.00 0.000 0 SECTION 063 57" X 38" STEEL FLARED END PIPE ARCH EA 1,300.0000 13,000.00 0.000 0 SECTION 064 64" X 43" STEEL FLARED END PIPE ARCH EA 1,500.0000 225,000.00 0.000 0 SECTION 065 77" X 52" STEEL FLARED END PIPE ARCH EA 2,500.0000 82,500.00 0.000 0 SECTION 066 REMOVE CULVERT (LF) LF 40.0000 18,400.00 0.000 0 067 REMOVE FLARED END SECTION (EA) EA 375.0000 97,500.00 0.000 0 068 ROCK SLOPE PROTECTION CY 215.0000 120,400.00 0.000 0 (1/4 T, CLASS V, METHOD B) (CY) 069 ROCK SLOPE PROTECTION CY 180.0000 954,000.00 0.000 0 (300 LB, CLASS IV, METHOD B) (CY) 070 ROCK SLOPE PROTECTION CY 165.0000 391,050.00 0.000 0 (1T, CLASS VIII, METHOD B) 071 ROCK SLOPE PROTECTION CY 165.0000 97,350.00 0.000 0 (1/2 T, CLASS VII, METHOD B) (CY) 072 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5.0000 38,600.00 0.000 0 073 MISCELLANEOUS IRON AND STEEL LB 15.0000 7,410.00 0.000 0 (F) 074 FENCE (TYPE BW, 4-STRAND, METAL POST) LF 6.4500 12,900.00 0.000 0 075 TEMPORARY DESERT TORTOISE FENCE LF 9.0000 18,000.00 0.000 0 076 DELINEATOR (CLASS 1) EA 47.0000 28,200.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 02/27/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 07:10 AM ESTIMATE NO. 001 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 02/27/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 GUARD RAILING DELINEATOR EA 35.0000 4,550.00 0.000 0 078 MARKER (CULVERT) EA 75.0000 21,000.00 0.000 0 079 OBJECT MARKER EA 105.0000 2,940.00 0.000 0 080 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 26.0000 133,380.00 0.000 0 081 VEGETATION CONTROL (MINOR CONCRETE) SQYD 80.0000 244,000.00 0.000 0 082 CABLE RAILING LF 106.0000 150,520.00 0.000 0 (F) 083 TRANSITION RAILING (TYPE WB-31) EA 3,540.0000 35,400.00 0.000 0 084 END CAP (TYPE A) EA 175.0000 525.00 0.000 0 085 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,100.0000 7,700.00 0.000 0 086 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,230.0000 48,450.00 0.000 0 087 REMOVE GUARDRAIL LF 7.2000 12,744.00 0.000 0 088 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 158,400.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 5 DATE 02/27/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 07:10 AM ESTIMATE NO. 001 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 02/27/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 15,951.36 15,951.36 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 15,951.36 15,951.36 089 MOBILIZATION LS 1,210,000.0000 1,210,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 17,266,271.00 TOTAL WORK COMPLETED 15,951.36 15,951.36 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -3,987.84 -3,987.84 TOTAL 11,963.52 11,963.52 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/31/19 375 02/03/20 02/03/20 08/20/21 0 12 0 0 0% 0% PROGRESS IS SATISFACTORY *** SUSPENDED ON 02/03/20. DAVIS, DARCY RESIDENT ENGINEER PROGRAM CAS145 DATE 02/27/20