PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/20 EST. NO. 007 TIME 03:17 PM R.E. NAME: DAVIS, DARCY 08-0R1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0001 211,000.00 A.C. @ L.S.(+) 062020 N 001 0 211,000.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 211,000.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/20 EST. NO. 007 TIME 03:17 PM R.E. NAME: DAVIS, DARCY 08-0R1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FEDERAL TRAINEE PLAN -3,987.84 001 FEDERAL TRAINEE PLAN 3,987.84 002 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 03:17 PM ESTIMATE NO. 007 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 08/21/20 LOCATION PROGRESS ESTIMATE 08-SBD-40-R75.0/R100.0 ----------------- GRANITE CONSTRUCTION COMPANY BETWEEN BADGER WASH TO ESSEX ROAD 38000 MONROE STREET; OC INDIO CA 92203 FED. AID NO. HSIM-040 -1(86)E REGRADE MEDIAN CROSS SLOPE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,300.0000 1,300.00 0.850 1,105 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 500.6000 500.60 0.090 45.05 0.660 330 003 TIME-RELATED OVERHEAD (WDAY) WDAY 4,000.0000 1,000,000.00 23.000 92,000.00 117.000 468,000 004 DEVELOP WATER SUPPLY LS 48,638.0000 48,638.00 0.070 3,404.66 0.560 27,237 005 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 0.050 1,750.00 0.750 26,250 006 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.0000 1,600.00 400.000 1,600 FOR CONSTRUCTION AREA SIGNS 007 TRAFFIC CONTROL SYSTEM LS 894,000.0000 894,000.00 0.170 151,980.00 0.850 759,900 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 35,000.0000 35,000.00 0.170 5,950.00 0.850 29,750 009 TEMPORARY RAILING (TYPE K) LF 70.0000 84,000.00 0.000 0 010 ALTERNATIVE TEMPORARY CRASH CUSHION EA 11,000.0000 33,000.00 0.000 0 011 JOB SITE MANAGEMENT LS 42,000.0000 42,000.00 0.100 4,200.00 0.650 27,300 012 PREPARE STORM WATER POLLUTION PREVENTION LS 1,650.0000 1,650.00 0.010 16.50 0.940 1,551 PLAN 013 RAIN EVENT ACTION PLAN EA 500.0000 5,500.00 0.000 0 014 STORM WATER SAMPLING AND ANALYSIS DAY EA 200.0000 4,400.00 0.000 0 015 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 016 TEMPORARY EROSION CONTROL BLANKET SQYD 4.3000 4,300.00 0.000 0 017 TEMPORARY SOIL BINDER SQYD 0.2000 2,000.00 0.000 0 018 TEMPORARY COVER SQYD 1.5000 30,000.00 0.000 0 019 TEMPORARY FIBER ROLL LF 2.5000 15,000.00 600.000 1,500 020 TEMPORARY GRAVEL BAG BERM LF 20.0000 80,000.00 0.000 0 021 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 48,000.00 0.000 0 022 TEMPORARY CONCRETE WASHOUT LS 8,000.0000 8,000.00 0.100 800.00 0.500 4,000 PROGRAM CAS145 PAGE 2 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 03:17 PM ESTIMATE NO. 007 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TREATED WOOD WASTE LB 0.4000 9,680.00 0.000 0 024 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 150,000.0000 150,000.00 0.100 15,000.00 0.600 90,000 025 TEMPORARY HIGH-VISIBILITY FENCE LF 3.2000 422,400.00 0.000 0 026 CLEARING AND GRUBBING (LS) LS 345,000.0000 345,000.00 0.160 55,200.00 1.000 345,000 027 DUST PALLIATIVE LS 63,750.0000 63,750.00 0.000 0 028 ROADWAY EXCAVATION CY 5.0000 59,500.00 4,092.000 20,460.00 11,900.000 59,500 029 SHOULDER BACKING TON 50.0000 390,000.00 0.000 0 030 IMPORTED BORROW (CY) CY 22.0000 6,886,000.00 115,983.000 2,551,626.00 277,971.000 6,115,362 031 PLANT (GROUP A) EA 25.0000 56,500.00 0.000 0 032 PLANT ESTABLISHMENT WORK LS 27,500.0000 27,500.00 0.000 0 033 WOOD MULCH CY 195.0000 13,260.00 0.000 0 034 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,000.0000 4,000.00 1.000 1,000 035 DUFF (ACRE) ACRE 1,000.0000 150,000.00 54.860 54,860.00 119.530 119,530 036 FIBER ROLLS LF 2.8000 106.40 0.000 0 037 HYDROSEED SQFT 0.0500 315,500.00 800,000.000 40,000 038 CLASS 2 AGGREGATE BASE (CY) CY 220.0000 301,400.00 223.000 49,060 039 MINOR HOT MIX ASPHALT TON 840.0000 1,848.00 0.000 0 040 PLACE HOT MIX ASPHALT SQYD 195.0000 1,950.00 0.000 0 (MISCELLANEOUS AREA) 041 STRUCTURAL CONCRETE, BOX CULVERT CY 2,800.0000 89,600.00 0.000 0 (F) 042 BAR REINFORCING STEEL LB 5.5000 16,819.00 0.000 0 (F) 043 48" REINFORCED CONCRETE PIPE LF 900.0000 14,400.00 0.000 0 044 54" REINFORCED CONCRETE PIPE LF 1,000.0000 8,000.00 0.000 0 045 60" REINFORCED CONCRETE PIPE LF 1,000.0000 24,000.00 0.000 0 046 72" REINFORCED CONCRETE PIPE LF 900.0000 54,900.00 0.000 0 047 36" CORRUGATED STEEL PIPE (.079" THICK) LF 450.0000 144,000.00 224.500 101,025 048 42" CORRUGATED STEEL PIPE (.109" THICK) LF 500.0000 115,000.00 146.000 73,000 049 48" CORRUGATED STEEL PIPE (.109" THICK) LF 330.0000 66,000.00 97.000 32,010.00 113.000 37,290 PROGRAM CAS145 PAGE 3 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 03:17 PM ESTIMATE NO. 007 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 49" X 33" CORRUGATED STEEL PIPE ARCH LF 330.0000 56,100.00 0.000 0 (.109" THICK) 051 57" X 38" CORRUGATED STEEL PIPE ARCH LF 350.0000 63,000.00 0.000 0 (.109" THICK) 052 64" X 43" CORRUGATED STEEL PIPE ARCH LF 450.0000 589,500.00 495.500 222,975.00 1,212.500 545,625 (.109" THICK) 053 77" X 52" CORRUGATED STEEL PIPE ARCH LF 500.0000 195,000.00 71.500 35,750.00 304.500 152,250 (.109" THICK) 054 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 055 36" CORRUGATED STEEL PIPE INLET LF 1,200.0000 34,800.00 0.000 0 (.079" THICK) 056 36" STEEL FLARED END SECTION EA 850.0000 26,350.00 27.000 22,950 057 42" STEEL FLARED END SECTION EA 1,200.0000 22,800.00 15.000 18,000 058 48" STEEL FLARED END SECTION EA 1,500.0000 10,500.00 2.000 3,000 059 54" STEEL FLARED END SECTION EA 1,700.0000 1,700.00 1.000 1,700 060 60" STEEL FLARED END SECTION EA 2,200.0000 4,400.00 2.000 4,400 061 72" STEEL FLARED END SECTION EA 2,800.0000 8,400.00 2.000 5,600 062 49" X 33" STEEL FLARED END PIPE ARCH EA 1,100.0000 8,800.00 0.000 0 SECTION 063 57" X 38" STEEL FLARED END PIPE ARCH EA 1,300.0000 13,000.00 0.000 0 SECTION 064 64" X 43" STEEL FLARED END PIPE ARCH EA 1,500.0000 225,000.00 48.000 72,000.00 133.000 199,500 SECTION 065 77" X 52" STEEL FLARED END PIPE ARCH EA 2,500.0000 82,500.00 4.000 10,000.00 25.000 62,500 SECTION 066 REMOVE CULVERT (LF) LF 40.0000 18,400.00 180.000 7,200.00 363.000 14,520 067 REMOVE FLARED END SECTION (EA) EA 375.0000 97,500.00 50.000 18,750.00 233.000 87,375 068 ROCK SLOPE PROTECTION CY 215.0000 120,400.00 62.580 13,454.70 337.160 72,489 (1/4 T, CLASS V, METHOD B) (CY) 069 ROCK SLOPE PROTECTION CY 180.0000 954,000.00 978.540 176,137.20 2,913.940 524,509 (300 LB, CLASS IV, METHOD B) (CY) 070 ROCK SLOPE PROTECTION CY 165.0000 391,050.00 235.000 38,775.00 235.000 38,775 (1T, CLASS VIII, METHOD B) 071 ROCK SLOPE PROTECTION CY 165.0000 97,350.00 503.000 82,995 (1/2 T, CLASS VII, METHOD B) (CY) 072 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5.0000 38,600.00 2,000.000 10,000.00 6,000.000 30,000 073 MISCELLANEOUS IRON AND STEEL LB 15.0000 7,410.00 0.000 0 (F) 074 FENCE (TYPE BW, 4-STRAND, METAL POST) LF 6.4500 12,900.00 0.000 0 075 TEMPORARY DESERT TORTOISE FENCE LF 9.0000 18,000.00 0.000 0 076 DELINEATOR (CLASS 1) EA 47.0000 28,200.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 03:17 PM ESTIMATE NO. 007 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 GUARD RAILING DELINEATOR EA 35.0000 4,550.00 0.000 0 078 MARKER (CULVERT) EA 75.0000 21,000.00 0.000 0 079 OBJECT MARKER EA 105.0000 2,940.00 0.000 0 080 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 26.0000 133,380.00 2,000.000 52,000.00 2,000.000 52,000 081 VEGETATION CONTROL (MINOR CONCRETE) SQYD 80.0000 244,000.00 0.000 0 082 CABLE RAILING LF 106.0000 150,520.00 0.000 0 (F) 083 TRANSITION RAILING (TYPE WB-31) EA 3,540.0000 35,400.00 0.000 0 084 END CAP (TYPE A) EA 175.0000 525.00 0.000 0 085 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,100.0000 7,700.00 0.000 0 086 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,230.0000 48,450.00 0.000 0 087 REMOVE GUARDRAIL LF 7.2000 12,744.00 0.000 0 088 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 158,400.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 5 DATE 08/21/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1504 TIME 03:17 PM ESTIMATE NO. 007 BID OPENING 11/13/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/20 R.E. NAME: DAVIS, DARCY DATE OF THIS ESTIMATE 08/21/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,646,344.11 10,297,479.28 ADJUSTMENT OF COMPENSATION 211,000.00 211,000.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,857,344.11 10,508,479.28 089 MOBILIZATION LS 1,210,000.0000 1,210,000.00 0.050 60,500.00 1.000 1,210,000 ORIGINAL CONTRACT AMOUNT 17,266,271.00 TOTAL WORK COMPLETED 3,917,844.11 11,718,479.28 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 3,917,844.11 11,718,479.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/31/19 375 02/03/20 02/03/20 09/21/21 106 34 0 0 69% 28% PROGRESS IS SATISFACTORY DAVIS, DARCY RESIDENT ENGINEER PROGRAM CAS145 DATE 08/21/20