PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/16/23 EST. NO. 002 TIME 01:03 PM R.E. NAME: PHAN, THANH 08-0R1704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 4,200.00 E.W. @ F.A.(+) 082323 N 1 0 4,200.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 4,200.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/16/23 EST. NO. 002 TIME 01:03 PM R.E. NAME: PHAN, THANH 08-0R1704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/16/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1704 TIME 01:03 PM ESTIMATE NO. 002 BID OPENING 11/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/23 R.E. NAME: PHAN, THANH DATE OF THIS ESTIMATE 09/16/23 LOCATION PROGRESS ESTIMATE 08-SBD-40-R25.0/R50.0 ----------------- GRANITE CONSTRUCTION COMPANY SAN BERNARDINO COUNTY AT NEWBERRY SPRINGS 38000 MONROE STREET AND LUDLOW FROM 1.6 MILES EAST OF FORT INDIO CA 92203 CADY ROAD OVERCROSSING TO CRUCERO ROAD UNDERCROSSING FED. AID NO. HSIM-040 (1 )91 CONSTRUCT CSP, CSPA, SSPPA, STR CONC HW, I ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 500.5200 500.52 1.000 500 003 TIME-RELATED OVERHEAD (WDAY) WDAY 8,000.0000 2,240,000.00 18.000 144,000.00 50.000 400,000 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 42,000.00 0.000 0 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 1,323,375.0000 1,323,375.00 0.100 132,337.50 0.350 463,181 007 CONSTRUCTION AREA SIGNS LS 17,990.0000 17,990.00 0.500 8,995 008 TRAFFIC CONTROL SYSTEM LS 1,400,000.0000 1,400,000.00 0.050 70,000.00 0.100 140,000 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 570.0000 68,400.00 23.000 13,110.00 23.000 13,110 010 PORTABLE RADAR SPEED FEEDBACK SIGN EA 55.0000 30,800.00 36.000 1,980.00 36.000 1,980 SYSTEM DAY 011 TEMPORARY BARRIER SYSTEM LF 25.0000 64,000.00 0.000 0 012 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 7,800.0000 78,000.00 1.000 7,800.00 1.000 7,800 013 ALTERNATIVE TEMPORARY CRASH CUSHION EA 2,700.0000 43,200.00 0.000 0 014 JOB SITE MANAGEMENT LS 14,000.0000 14,000.00 0.100 1,400.00 0.200 2,800 015 PREPARE STORM WATER POLLUTION PREVENTION LS 2,350.0000 2,350.00 1.000 2,350 PLAN 016 STORM WATER ANNUAL REPORT EA 2,000.0000 8,000.00 0.000 0 017 MOVE-IN/MOVE-OUT (TEMPORARY EROSION EA 1,190.0000 4,760.00 0.000 0 CONTROL) 018 TEMPORARY COVER SQYD 5.0000 100,000.00 1,377.050 6,885 019 TEMPORARY DRAINAGE INLET PROTECTION EA 345.0000 3,450.00 5.000 1,725.00 5.000 1,725 020 TEMPORARY FIBER ROLL LF 2.0000 240,000.00 2,500.000 5,000.00 10,504.650 21,009 021 TEMPORARY GRAVEL BAG BERM LF 12.0000 6,600.00 0.000 0 022 TEMPORARY CONSTRUCTION ENTRANCE EA 5,000.0000 60,000.00 1.000 5,000.00 1.000 5,000 PROGRAM CAS145 PAGE 2 DATE 09/16/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1704 TIME 01:03 PM ESTIMATE NO. 002 BID OPENING 11/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/23 R.E. NAME: PHAN, THANH DATE OF THIS ESTIMATE 09/16/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STREET SWEEPING LS 63,000.0000 63,000.00 0.000 0 024 TEMPORARY CONCRETE WASHOUT LS 4,500.0000 4,500.00 0.000 0 025 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3000 79,200.00 0.000 0 STRIPE (HAZARDOUS WASTE) 026 TREATED WOOD WASTE LB 0.6500 17,030.00 0.000 0 027 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 232,700.0000 232,700.00 0.140 32,578 028 TEMPORARY HIGH-VISIBILITY FENCE LF 5.0000 35,050.00 4,216.850 21,084.25 5,257.500 26,287 029 CLEARING AND GRUBBING (LS) LS 830,000.0000 830,000.00 0.000 0 030 DUST PALLIATIVE LS 5,000.0000 5,000.00 0.000 0 031 ROADWAY EXCAVATION CY 2.5000 14,050.00 0.000 0 032 IMPORTED BORROW (CY) CY 26.0000 17,160,000.00 0.000 0 033 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,190.0000 4,760.00 0.000 0 034 DUFF (ACRE) ACRE 1,000.0000 160,000.00 0.000 0 035 BONDED FIBER MATRIX (ACRE) ACRE 4,998.0000 899,640.00 0.000 0 036 FIBER ROLLS LF 4.0000 1,000.00 0.000 0 037 CLASS 2 AGGREGATE BASE (CY) CY 160.0000 214,400.00 0.000 0 038 MINOR HOT MIX ASPHALT TON 300.0000 2,100.00 0.000 0 039 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 310.0000 16,430.00 0.000 0 AREA) 040 REMOVE ASPHALT CONCRETE DIKE LF 50.0000 13,000.00 0.000 0 041 STRUCTURAL CONCRETE, BOX CULVERT CY 4,200.0000 155,400.00 0.000 0 (F) 042 STRUCTURAL CONCRETE, HEADWALL CY 1,700.0000 965,600.00 0.000 0 (F) 043 BAR REINFORCING STEEL (BOX CULVERT) LB 3.9400 17,304.48 0.000 0 (F) 044 24" CORRUGATED STEEL PIPE (.064" THICK) LF 280.0000 21,840.00 8.980 2,514 045 36" CORRUGATED STEEL PIPE (.079" THICK) LF 290.0000 182,700.00 105.530 30,603 046 42" CORRUGATED STEEL PIPE (.109" THICK) LF 295.0000 56,050.00 48.220 14,224 047 48" CORRUGATED STEEL PIPE (.109" THICK) LF 300.0000 33,000.00 37.760 11,328 048 65" X 40" CORRUGATED STEEL PIPE ARCH LF 750.0000 142,500.00 31.570 23,677 (.109" THICK) 049 72" X 44" CORRUGATED STEEL PIPE ARCH LF 700.0000 98,000.00 19.700 13,790.00 27.640 19,348 (.138" THICK) PROGRAM CAS145 PAGE 3 DATE 09/16/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1704 TIME 01:03 PM ESTIMATE NO. 002 BID OPENING 11/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/23 R.E. NAME: PHAN, THANH DATE OF THIS ESTIMATE 09/16/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 6'-4" X 4'-9" STRUCTURAL STEEL PLATE LF 1,800.0000 360,000.00 0.000 0 PIPE ARCH (.138" THICK) 051 7'-0" X 5'-1" STRUCTURAL STEEL PLATE LF 2,000.0000 78,000.00 0.000 0 PIPE ARCH (.138" THICK) 052 8'-2" X 5'-9" STRUCTURAL STEEL PLATE LF 2,100.0000 84,000.00 0.000 0 PIPE ARCH (.138" THICK) 053 8'-10" X 6'-1" STRUCTURAL STEEL PLATE LF 2,100.0000 88,200.00 0.000 0 PIPE ARCH (.138" THICK) 054 9'-4" X 6'-3" STRUCTURAL STEEL PLATE LF 2,100.0000 195,300.00 0.000 0 PIPE ARCH (.138" THICK) 055 10'-8" X 6'-11" STRUCTURAL STEEL PLATE LF 2,100.0000 252,000.00 0.000 0 PIPE ARCH (.138" THICK) 056 13'-5" X 8'-5" STRUCTURAL STEEL PLATE LF 2,100.0000 149,100.00 0.000 0 PIPE ARCH (.138" THICK) 057 36" CORRUGATED STEEL PIPE RISER (.079" LF 1,100.0000 31,900.00 0.780 858.00 6.140 6,754 THICK) 058 24" STEEL FLARED END SECTION EA 1,100.0000 3,300.00 1.070 1,177 059 36" STEEL FLARED END SECTION EA 1,500.0000 37,500.00 12.780 19,170 060 42" STEEL FLARED END SECTION EA 1,900.0000 11,400.00 4.370 8,303 061 48" STEEL FLARED END SECTION EA 2,100.0000 12,600.00 4.650 9,765 062 65" X 40" STEEL FLARED END PIPE ARCH EA 2,200.0000 8,800.00 3.150 6,930 SECTION 063 72" X 44" STEEL FLARED END PIPE ARCH EA 3,700.0000 7,400.00 1.270 4,699 SECTION 064 36" PRECAST CONCRETE PIPE INLET LF 2,900.0000 5,510.00 0.000 0 065 REMOVE DOWNDRAIN (EA) EA 340.0000 340.00 0.000 0 066 REMOVE HEADWALL EA 1,500.0000 39,000.00 0.000 0 067 REMOVE FLARED END SECTION (EA) EA 1,100.0000 71,500.00 0.000 0 068 CONCRETE (CONCRETE APRON) CY 4,000.0000 48,000.00 0.000 0 069 ROCK SLOPE PROTECTION (150 LB, CLASS CY 225.0000 5,175.00 0.000 0 III, METHOD B) (CY) 070 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 120.0000 135,600.00 0.000 0 METHOD B) (CY) 071 ROCK SLOPE PROTECTION (1/2 T, CLASS VII, CY 120.0000 286,800.00 0.000 0 METHOD B) (CY) 072 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 10.0000 20,500.00 377.130 3,771 073 MISCELLANEOUS IRON AND STEEL LB 7.8000 18,408.00 1,916.950 14,952.21 1,916.950 14,952 (F) 074 REMOVE PAVEMENT MARKER EA 0.5000 2,750.00 0.000 0 075 DELINEATOR (CLASS 1) EA 65.0000 4,290.00 0.000 0 076 GUARD RAILING DELINEATOR EA 45.0000 13,500.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 09/16/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1704 TIME 01:03 PM ESTIMATE NO. 002 BID OPENING 11/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/23 R.E. NAME: PHAN, THANH DATE OF THIS ESTIMATE 09/16/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 16,500.00 0.000 0 078 MARKER (CULVERT) EA 280.0000 25,760.00 0.000 0 079 OBJECT MARKER EA 280.0000 14,560.00 0.000 0 080 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 44.0000 453,200.00 0.000 0 081 DOUBLE MIDWEST GUARDRAIL SYSTEM (STEEL LF 57.0000 258,210.00 0.000 0 POST) 082 CABLE RAILING LF 75.0000 79,050.00 0.000 0 (F) 083 TRANSITION RAILING (TYPE WB-31 MODIFIED) EA 2,200.0000 33,000.00 0.000 0 084 RAIL TENSIONING ASSEMBLY EA 1,000.0000 16,000.00 0.000 0 085 END CAP (TYPE A) EA 400.0000 1,600.00 0.000 0 086 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 1,900.0000 41,800.00 0.000 0 087 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,600.0000 87,400.00 0.000 0 088 ALTERNATIVE CRASH CUSHION SYSTEM EA 40,200.0000 643,200.00 0.000 0 089 REMOVE GUARDRAIL LF 11.0000 98,230.00 0.000 0 090 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8200 216,480.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 091 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 5 DATE 09/16/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R1704 TIME 01:03 PM ESTIMATE NO. 002 BID OPENING 11/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/23 R.E. NAME: PHAN, THANH DATE OF THIS ESTIMATE 09/16/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 433,036.96 1,312,419.83 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 4,200.00 4,200.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 437,236.96 1,316,619.83 092 MOBILIZATION LS 3,400,000.0000 3,400,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 34,533,543.00 TOTAL WORK COMPLETED 437,236.96 1,316,619.83 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 437,236.96 1,316,619.83 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/08/23 280 07/03/23 07/03/23 08/26/24 50 7 0 0 4% 18% PROGRESS IS SATISFACTORY PHAN, THANH RESIDENT ENGINEER