PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/22/14 EST. NO.08 TIME 03:17 PM R.E. NAME: YANG, CHAD 08-0R6604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0011 1,607.94 E.W. @ F.A.(+) 101013 N 2 REV3 008 0001 11,557.93 A.C. @ L.S.(+) 042914 N 0001 0 13,165.87 TOTAL THIS ESTIMATE 115,948.85 TOTAL PREVIOUS ESTIMATE 129,114.72 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/22/14 EST. NO.08 TIME 03:17 PM R.E. NAME: YANG, CHAD 08-0R6604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE LCWP-NONCOMPLIANCE -5,000.00 01 LCWP NON COMPLIANCE 5,000.00 02 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 05/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R6604 TIME 03:17 PM ESTIMATE NO. 08 BID OPENING 05/16/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/25/14 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 05/22/14 LOCATION SEMI-FINAL ESTIMATE 08-RIV-60-R0.1/9.5 ------------------- WESTERN STRUCTURES IN RIVERSIDE AND SAN BERNARDINO 6005 TYLER STREET COUNTIES AT VARIOUS LOCATIONS RIVERSIDE CA 92503 FED. AID NO. N O N E TREAT BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,035.0000 2,035.00 1.000 2,035 002 CONSTRUCTION AREA SIGNS LS 9,528.0000 9,528.00 1.000 9,528 003 TRAFFIC CONTROL SYSTEM LS 98,573.0000 98,573.00 1.000 98,573 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 8,228.0000 8,228.00 1.000 8,228 005 JOB SITE MANAGEMENT LS 4,785.0000 4,785.00 1.000 4,785 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 6,043.0000 6,043.00 1.000 6,043 007 TEMPORARY CONCRETE WASHOUT LS 825.0000 825.00 1.000 825 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.9800 14,275.80 6,756.500 13,377 STRIPE (HAZARDOUS WASTE) 009 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.6500 13,497.00 9,702.000 16,008 010 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 8.8000 8,008.00 153.000 1,346 011 REMOVE PAVEMENT MARKER EA 4.4000 4,004.00 859.000 3,779 012 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1500 38,217.45 244,800.000 36,720 013 TREAT BRIDGE DECK SQFT 0.2600 66,243.58 241,615.000 62,819 (F) 014 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 52.0000 147,160.00 2,868.000 149,136 015 BRIDGE REMOVAL (PORTION) LS 35,000.0000 35,000.00 1.000 35,000 016 STRUCTURE BACKFILL (BRIDGE) CY 250.0000 32,500.00 27.000 6,750 017 STRUCTURAL CONCRETE, BRIDGE CY 5,653.0000 16,959.00 3.000 16,959 (F) 018 AGGREGATE BASE (APPROACH SLAB) CY 175.1000 3,677.10 3.000 525 019 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,200.0000 240,000.00 90.000 108,000 (TYPE R) 020 PAVING NOTCH EXTENSION CF 255.6200 19,938.36 0.000 0 021 CLEAN EXPANSION JOINT LF 14.6100 21,242.94 984.000 14,376 022 PAINT BRIDGE NAME AND NUMBER EA 222.0000 3,108.00 11.000 2,442 PROGRAM CAS145 PAGE 2 DATE 05/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R6604 TIME 03:17 PM ESTIMATE NO. 08 BID OPENING 05/16/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/25/14 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 05/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (MR 1/2") LF 20.9600 10,773.44 468.000 9,809 024 JOINT SEAL (MR 1") LF 28.1800 20,402.32 408.000 11,497 025 JOINT SEAL (MR 1 1/2") LF 74.3900 11,307.28 152.000 11,307 026 JOINT SEAL (MR 2") LF 65.2200 16,174.56 36.000 2,347 027 JOINT SEAL (TYPE AL) LF 24.7200 2,249.52 91.000 2,249 028 BAR REINFORCING STEEL (BRIDGE) LB 1.0900 682.34 626.000 682 (F) 029 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.4300 906.36 51.100 890 (0.063"-UNFRAMED) 030 ROADSIDE SIGN - ONE POST EA 269.5000 1,886.50 7.000 1,886 031 THERMOPLASTIC PAVEMENT MARKING SQFT 6.6000 4,620.00 394.000 2,600 032 THERMOPLASTIC TRAFFIC STRIPE LF 0.8800 29,832.00 26,191.000 23,048 (SPRAYABLE) 033 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.3000 2,937.00 562.000 1,854 034 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.6000 4,884.00 537.000 3,544 PROGRAM CAS145 PAGE 3 DATE 05/22/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R6604 TIME 03:17 PM ESTIMATE NO. 08 BID OPENING 05/16/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/25/14 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 05/22/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 668,975.84 ADJUSTMENT OF COMPENSATION 11,557.93 1,096.77 EXTRA WORK 1,607.94 128,017.95 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 13,165.87 798,090.56 035 MOBILIZATION LS 75,305.5000 75,305.50 1.000 75,305 ORIGINAL CONTRACT AMOUNT 975,809.05 TOTAL WORK COMPLETED 13,165.87 873,396.06 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 13,165.87 873,396.06 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/08/13 90 07/23/13 07/23/13 02/25/14 121 25 31 0 100% 100% YANG, CHAD RESIDENT ENGINEER PROGRAM CAS145 DATE 05/22/14