PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/05/15 EST. NO. 003 TIME 02:33 PM R.E. NAME: GAYED, EZZ 08-0R8104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 94,785.06 A.C. @ L.S.(+) 100214 N 0001 0 94,785.06 TOTAL THIS ESTIMATE 5,392.81 TOTAL PREVIOUS ESTIMATE 100,177.87 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/05/15 EST. NO. 003 TIME 02:33 PM R.E. NAME: GAYED, EZZ 08-0R8104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/05/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R8104 TIME 02:33 PM ESTIMATE NO. 003 BID OPENING 05/15/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/26/14 R.E. NAME: GAYED, EZZ DATE OF THIS ESTIMATE 03/05/15 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 08-RIV-215-R15.0/ .0 ---------------------------------- ABSL CONSTRUCTION NEAR THE CITY OF MURRIETA S/O SCOTT 29393 PACIFIC ST RD IC. HAYWARD CA 94544 FED. AID NO. N O N E INSTALL A WEIGH IN MOTION (WIM) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,185.0000 3,185.00 0.250 796 002 CONSTRUCTION AREA SIGNS LS 2,595.0000 2,595.00 0.250 648 003 TRAFFIC CONTROL SYSTEM LS 31,650.0000 31,650.00 0.000 0 004 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 1,200.0000 2,400.00 0.000 0 005 JOB SITE MANAGEMENT LS 180.0000 180.00 0.000 0 006 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.1500 7,009.00 0.000 0 007 ROADWAY EXCAVATION CY 75.0000 36,750.00 0.000 0 008 LEAN CONCRETE BASE RAPID SETTING CY 485.0000 77,600.00 0.000 0 009 BASE BOND BREAKER SQYD 2.0000 1,880.00 0.000 0 010 HOT MIX ASPHALT (TYPE A) TON 500.0000 29,000.00 0.000 0 011 JOINTED PLAIN CONCRETE PAVEMENT CY 665.0000 219,450.00 0.000 0 (RSC) 012 ISOLATION JOINT SEAL (SILICONE) LF 5.4500 2,180.00 0.000 0 013 ISOLATION JOINT SEAL (PREFORMED LF 7.6500 9,409.50 0.000 0 COMPRESSION) 014 2" PLASTIC PIPE (EDGE DRAIN) LF 15.0000 1,500.00 0.000 0 015 THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,600.00 0.000 0 (SPRAYABLE) 016 PAVEMENT MARKER (NON-REFLECTIVE) EA 5.0000 360.00 0.000 0 017 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 270.00 0.000 0 018 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 019 WEIGH-IN-MOTION SYSTEM LS 308,400.0000 308,400.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 03/05/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-0R8104 TIME 02:33 PM ESTIMATE NO. 003 BID OPENING 05/15/14 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/26/14 R.E. NAME: GAYED, EZZ DATE OF THIS ESTIMATE 03/05/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 1,445.00 ADJUSTMENT OF COMPENSATION 94,785.06 94,785.06 EXTRA WORK 0.00 5,392.81 SUBTOTAL AMOUNT EARNED 94,785.06 101,622.87 ORIGINAL CONTRACT AMOUNT 735,918.50 TOTAL WORK COMPLETED 94,785.06 101,622.87 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 94,785.06 101,622.87 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/26/14 60 08/20/14 08/20/14 11/26/14 29 38 1 0 100% 100% GAYED, EZZ RESIDENT ENGINEER PROGRAM CAS145 DATE 03/05/15