PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/18 EST. NO. 001 TIME 01:45 PM R.E. NAME: VU, KHOI 08-1C0604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/18 EST. NO. 001 TIME 01:45 PM R.E. NAME: VU, KHOI 08-1C0604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C0604 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 10/26/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 04/25/18 LOCATION PROGRESS ESTIMATE 08-RIV-10-44.4/51.7 ----------------- CALMEX ENGINEERING INC IN/NEAR INDIO FROM MONTEREY AVE OC 2764 S VISTA AVE TO JEFFERSON OC BLOOMINGTON CA 92316 COLD PLANE & OVERLAY WITH RHMA (TYPE G) FED. AID NO. ACIM- 010-3(109)E COLD PLANE 0.1' & OVERLAY WITH 0.25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,372.8500 2,372.85 0.700 1,661.00 0.700 1,661 002 TIME-RELATED OVERHEAD (LS) LS 5,071.4400 5,071.44 0.000 0 003 CONSTRUCTION AREA SIGNS LS 36,411.6100 36,411.61 0.750 27,308.71 0.750 27,308 004 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.8900 9,682.20 0.000 0 005 TRAFFIC CONTROL SYSTEM LS 262,605.2500 262,605.25 0.000 0 006 TYPE II BARRICADE EA 30.9000 1,112.40 0.000 0 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.2300 79,120.00 0.000 0 008 TEMPORARY PAVEMENT MARKER EA 2.5800 14,654.40 0.000 0 009 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,317.5000 27,810.00 0.000 0 010 JOB SITE MANAGEMENT LS 56,626.5600 56,626.56 0.250 14,156.64 0.250 14,156 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,060.0000 2,060.00 0.250 515.00 0.250 515 012 TEMPORARY FIBER ROLL LF 22.5300 15,771.00 720.000 16,221.60 720.000 16,221 013 TEMPORARY CONCRETE WASHOUT LS 768.6400 768.64 0.000 0 014 TREATED WOOD WASTE LB 0.1500 1,845.00 0.000 0 015 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 2,060.0000 618.00 0.000 0 016 TEMPORARY HIGH-VISIBILITY FENCE LF 4.0700 4,070.00 1,000.000 4,070.00 1,000.000 4,070 017 ROADWAY EXCAVATION CY 618.0000 3,708.00 0.000 0 018 ROCK BLANKET SQFT 41.2000 17,716.00 0.000 0 019 PREPAVING INERTIAL PROFILER LS 22,124.3000 22,124.30 1.000 22,124.30 1.000 22,124 020 PREPAVING GRINDING DAY EA 14,420.0000 57,680.00 0.000 0 021 REPLACE ASPHALT CONCRETE SURFACING CY 1,100.3000 13,203.60 0.000 0 022 HOT MIX ASPHALT (TYPE A) TON 100.5300 6,031.80 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C0604 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 10/26/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 04/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 95.4900 3,437,640.00 0.000 0 024 DATA CORE LS 7,068.3400 7,068.34 0.000 0 025 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.9100 4,259.30 0.000 0 026 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.9100 156.62 0.000 0 027 TACK COAT TON 513.9700 66,816.10 0.000 0 028 REMOVE ASPHALT CONCRETE DIKE LF 7.8800 18,281.60 0.000 0 029 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.9400 362,780.00 0.000 0 030 REMOVE PEDESTRIAN BARRICADE EA 1,545.0000 1,545.00 0.000 0 031 DETECTABLE WARNING SURFACE SQFT 66.9500 12,720.50 0.000 0 032 MINOR CONCRETE (CURB, SIDEWALK AND CY 715.8500 29,349.85 0.000 0 CURB RAMP) 033 REMOVE CONCRETE CY 628.3000 28,273.50 0.000 0 (CURB, GUTTER, AND SIDEWALK) (CY) 034 SURVEY MONUMENT (TYPE D) EA 901.2500 18,025.00 0.000 0 035 GUARD RAILING DELINEATOR EA 15.4500 571.65 0.000 0 036 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.5800 14,654.40 0.000 0 037 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.4300 65.72 0.000 0 (0.080"-UNFRAMED) 038 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 200.8500 200.85 0.000 0 METHOD) 039 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 59.2300 4,442.25 0.000 0 040 MIDWEST GUARDRAIL SYSTEM (7' POST) LF 33.8900 22,706.30 0.000 0 041 END CAP (TYPE A) EA 293.5500 293.55 0.000 0 042 END ANCHOR ASSEMBLY (TYPE SFT) EA 669.5000 2,678.00 0.000 0 043 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,450.5000 6,901.00 0.000 0 044 REMOVE GUARDRAIL LF 5.6700 4,592.70 0.000 0 045 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 046 THERMOPLASTIC PAVEMENT MARKING SQFT 2.0600 3,996.40 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 047 12" RUMBLE STRIP STA 278.4800 8,075.92 0.000 0 (ASPHALT CONCRETE PAVEMENT) 048 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,125.2600 1,125.26 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 049 MODIFYING EXISTING ELECTRICAL SYSTEM LS 97,356.4200 97,356.42 0.072 7,009.66 0.072 7,009 PROGRAM CAS145 PAGE 3 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C0604 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 10/26/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 04/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 051 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3100 23,901.00 0.000 0 STRIPE (HAZARDOUS WASTE) 052 REMOVE PAVEMENT MARKER EA 0.5200 2,594.80 0.000 0 053 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8200 7,257.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 054 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6100 204,960.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 055 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2100 37,380.00 0.000 0 056 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0600 618.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 04/25/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C0604 TIME 01:45 PM ESTIMATE NO. 001 BID OPENING 10/26/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/18 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 04/25/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 93,066.91 93,066.91 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 93,066.91 93,066.91 057 MOBILIZATION LS 200,657.3700 200,657.37 0.000 0 ORIGINAL CONTRACT AMOUNT 5,273,007.45 TOTAL WORK COMPLETED 93,066.91 93,066.91 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 93,066.91 93,066.91 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/18/17 165 01/02/18 04/16/18 12/19/18 0 76 0 0 2% 0% PROGRESS IS SATISFACTORY VU, KHOI RESIDENT ENGINEER PROGRAM CAS145 DATE 04/25/18