PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/23/16 EST. NO. 002 TIME 08:31 AM R.E. NAME: ABU-GHARBIEH, IMAD 08-1C4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/23/16 EST. NO. 002 TIME 08:31 AM R.E. NAME: ABU-GHARBIEH, IMAD 08-1C4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/23/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C4004 TIME 08:31 AM ESTIMATE NO. 002 BID OPENING 03/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/16 R.E. NAME: ABU-GHARBIEH, IMAD DATE OF THIS ESTIMATE 06/23/16 LOCATION PROGRESS ESTIMATE 08-RIV-215-22.3/43.2 ----------------- J. FRANCIS COMPANY NEAR PERRIS FROM ROMOLAND FLOOD 16197 KRAMERIA AVE. CONTROL CHANNEL TO SB 215 TO EB 215 RIVERSIDE CA 92504 CONNECTOR IN RIVERSIDE FED. AID NO. NHPI-215 ( ) ,1-238 (E ) SANDBLAST/CLEAN AND APPLY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 1.000 1,600 002 CONSTRUCTION AREA SIGNS LS 30,000.0000 30,000.00 0.266 7,980.00 0.773 23,190 003 TRAFFIC CONTROL SYSTEM LS 55,000.0000 55,000.00 0.600 33,000.00 0.867 47,685 004 TYPE III BARRICADE EA 100.0000 2,000.00 20.000 2,000.00 20.000 2,000 005 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 1,000.00 40.000 1,000.00 40.000 1,000 006 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 825.0000 12,375.00 11.000 9,075.00 12.600 10,395 007 JOB SITE MANAGEMENT LS 2,000.0000 2,000.00 0.600 1,200.00 0.867 1,734 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 0.750 1,125 009 ASBESTOS COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.000 0 010 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.6500 8,125.00 9,997.500 6,498.38 11,425.500 7,426 STRIPE (HAZARDOUS WASTE) 011 PUBLIC SAFETY PLAN LS 3,800.0000 3,800.00 1.000 3,800 012 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4800 10,560.00 18,791.120 9,019.74 21,647.120 10,390 013 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.5000 1,635.00 254.350 381.53 254.350 381 014 REMOVE PAVEMENT MARKER EA 1.2500 3,000.00 223.000 278.75 223.000 278 015 SAW CUT HINGE LS 30,000.0000 30,000.00 1.000 30,000.00 1.000 30,000 016 CLEAN EXISTING BRIDGE DECK DRAINAGE LF 55.0000 10,175.00 111.000 6,105.00 111.000 6,105 SYSTEM 017 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 61,173.06 415,764.000 54,049.32 470,562.000 61,173 018 TREAT BRIDGE DECK SQFT 0.1800 84,701.16 448,849.000 80,792.82 469,562.000 84,521 (F) 019 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 47.0000 276,407.00 6,141.350 288,643.45 6,511.100 306,021 020 CLEAN EXPANSION JOINT LF 18.0000 25,056.00 198.000 3,564.00 198.000 3,564 021 JOINT SEAL (MR 1/2") LF 60.0000 4,680.00 0.000 0 022 JOINT SEAL (MR 1 1/2") LF 75.0000 66,750.00 159.000 11,925.00 159.000 11,925 PROGRAM CAS145 PAGE 2 DATE 06/23/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C4004 TIME 08:31 AM ESTIMATE NO. 002 BID OPENING 03/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/16 R.E. NAME: ABU-GHARBIEH, IMAD DATE OF THIS ESTIMATE 06/23/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 JOINT SEAL (TYPE AL) LF 35.0000 2,100.00 0.000 0 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 880.00 0.000 0 (0.063"-FRAMED) 025 ROADSIDE SIGN - ONE POST EA 400.0000 2,400.00 0.000 0 026 MISCELLANEOUS METAL (BRIDGE) LB 40.0000 12,400.00 0.000 0 (F) 027 THERMOPLASTIC PAVEMENT MARKING SQFT 2.6100 1,383.30 0.000 0 028 THERMOPLASTIC TRAFFIC STRIPE LF 0.3200 14,528.00 0.000 0 (SPRAYABLE) 029 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.8400 3,890.80 0.000 0 030 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.1000 3,193.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/23/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C4004 TIME 08:31 AM ESTIMATE NO. 002 BID OPENING 03/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/16 R.E. NAME: ABU-GHARBIEH, IMAD DATE OF THIS ESTIMATE 06/23/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 545,512.99 614,316.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 545,512.99 614,316.40 031 MOBILIZATION LS 73,347.0000 73,347.00 0.500 36,673.50 1.000 73,347 ORIGINAL CONTRACT AMOUNT 810,659.32 TOTAL WORK COMPLETED 582,186.49 687,663.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 582,186.49 687,663.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/18/16 45 00/00/00 00/00/00 07/25/16 20 13 0 0 82% 44% PROGRESS IS SATISFACTORY ABU-GHARBIEH, IMAD RESIDENT ENGINEER PROGRAM CAS145 DATE 06/23/16