PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/22/18 EST. NO. 001 TIME 12:22 PM R.E. NAME: ROBINSON, KERRY 08-1C5604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/22/18 EST. NO. 001 TIME 12:22 PM R.E. NAME: ROBINSON, KERRY 08-1C5604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C5604 TIME 12:22 PM ESTIMATE NO. 001 BID OPENING 08/22/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/18 R.E. NAME: ROBINSON, KERRY DATE OF THIS ESTIMATE 05/22/18 LOCATION PROGRESS ESTIMATE 08-SBD-18-44.5/52.8 ----------------- AMERICA PACIFIC CONSTRUCTION IN SOUTH BIG BEAR LAKE WATERSHED 7161 CITRUS VALLEY AVE HAS 801.71, IN/NEAR BIG BEAR LAKE, EASTVALE CA 92880 FED. AID NO. ACST-P018(59)E SEDIMENT STABILIZATION, EROSION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200.00 1.000 1,200 002 CONSTRUCTION AREA SIGNS LS 7,000.0000 7,000.00 0.700 4,900.00 0.700 4,900 003 TRAFFIC CONTROL SYSTEM LS 68,500.0000 68,500.00 0.000 0 004 TYPE II BARRICADE EA 21.0000 441.00 0.000 0 005 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 10.0000 1,100.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,000.0000 3,000.00 0.000 0 007 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.067 201.00 0.067 201 008 PREPARE STORM WATER POLLUTION PREVENTION LS 2,100.0000 2,100.00 0.500 1,050.00 0.500 1,050 PLAN 009 RAIN EVENT ACTION PLAN EA 500.0000 500.00 0.000 0 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 1,200.0000 7,200.00 0.000 0 011 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 012 TEMPORARY COVER SQYD 4.0000 1,000.00 0.000 0 013 TEMPORARY FIBER ROLL LF 5.0000 5,000.00 0.000 0 014 TEMPORARY SILT FENCE LF 12.0000 900.00 0.000 0 015 TEMPORARY CONSTRUCTION ENTRANCE EA 5,000.0000 5,000.00 0.000 0 016 STREET SWEEPING LS 2,000.0000 2,000.00 0.000 0 017 ROADWAY EXCAVATION CY 450.0000 4,500.00 0.000 0 018 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 300.0000 1,800.00 0.000 0 019 HYDROSEED SQFT 0.5900 107,970.00 0.000 0 020 CLASS 2 AGGREGATE BASE (CY) CY 300.0000 4,200.00 0.000 0 021 36" CORRUGATED STEEL PIPE (.138" THICK) LF 340.0000 4,760.00 0.000 0 022 18" CORRUGATED STEEL PIPE (.138" THICK) LF 240.0000 960.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C5604 TIME 12:22 PM ESTIMATE NO. 001 BID OPENING 08/22/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/18 R.E. NAME: ROBINSON, KERRY DATE OF THIS ESTIMATE 05/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 DRAINAGE INLET MARKER EA 105.0000 315.00 0.000 0 024 36" CORRUGATED STEEL PIPE INLET LF 740.0000 8,140.00 0.000 0 (.138" THICK) 025 REMOVE PIPE (LF) LF 300.0000 900.00 0.000 0 026 REMOVE INLET EA 2,500.0000 2,500.00 0.000 0 027 ROCK SLOPE PROTECTION FABRIC (CLASS 10) SQYD 12.0000 168.00 0.000 0 028 MINOR CONCRETE (MISCELLANEOUS CY 3,000.0000 3,000.00 0.000 0 CONSTRUCTION) 029 MINOR CONCRETE (SIDEWALK) CY 2,500.0000 5,500.00 0.000 0 030 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 120.0000 1,920.00 0.000 0 031 MISCELLANEOUS IRON AND STEEL LB 1.5000 885.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/22/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C5604 TIME 12:22 PM ESTIMATE NO. 001 BID OPENING 08/22/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/18/18 R.E. NAME: ROBINSON, KERRY DATE OF THIS ESTIMATE 05/22/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 7,351.00 7,351.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 7,351.00 7,351.00 ORIGINAL CONTRACT AMOUNT 257,459.00 TOTAL WORK COMPLETED 7,351.00 7,351.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 7,351.00 7,351.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/06/17 45 12/04/17 12/04/17 07/25/18 4 116 0 0 3% 9% PROGRESS IS SATISFACTORY *** SUSPENDED ON 12/04/17. ROBINSON, KERRY RESIDENT ENGINEER PROGRAM CAS145 DATE 05/22/18