PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/22/20 EST. NO. 002 TIME 07:52 AM R.E. NAME: BENSON, DAVID 08-1C6604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/22/20 EST. NO. 002 TIME 07:52 AM R.E. NAME: BENSON, DAVID 08-1C6604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C6604 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 04/02/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/20 R.E. NAME: BENSON, DAVID DATE OF THIS ESTIMATE 09/22/20 LOCATION PROGRESS ESTIMATE 08-RIV-215-R9.0/R16.0 ----------------- BEADOR CONSTRUCTION COMPANY, IN & NR MURRIETA AND MENIFEE FR 0.8 INC. MI N/O RTE 15 TO 0.5 MI N/O SCOTT 26320 LESTER CIRCLE; RD CORONA CA 92883 FED. AID NO. ACIM-215 -1(250)E SEDIMENT CONTROL AND STABILIZATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 70,000.00 20.000 20,000.00 25.000 25,000 002 CONSTRUCTION AREA SIGNS LS 30,000.0000 30,000.00 0.500 15,000.00 0.500 15,000 003 TRAFFIC CONTROL SYSTEM LS 144,449.0000 144,449.00 0.250 36,112.25 0.250 36,112 004 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 960.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 17,500.0000 17,500.00 0.000 0 006 TEMPORARY RAILING (TYPE K) LF 20.0000 26,600.00 0.000 0 007 TEMPORARY ALTERNATIVE CRASH CUSHION EA 2,700.0000 10,800.00 0.000 0 MODULE 008 JOB SITE MANAGEMENT LS 15,000.0000 15,000.00 0.350 5,250.00 0.350 5,250 009 PREPARE STORM WATER POLLUTION PREVENTION LS 1,650.0000 1,650.00 0.500 825.00 0.500 825 PLAN 010 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 011 TEMPORARY CONSTRUCTION ENTRANCE EA 3,850.0000 7,700.00 1.000 3,850.00 1.000 3,850 012 TEMPORARY CONCRETE WASHOUT LS 8,500.0000 8,500.00 0.000 0 013 TREATED WOOD WASTE LB 1.3000 780.00 0.000 0 014 TEMPORARY HIGH-VISIBILITY FENCE LF 4.0000 17,140.00 3,360.000 13,440.00 3,360.000 13,440 015 CLEARING AND GRUBBING (LS) LS 15,000.0000 15,000.00 0.330 4,950.00 0.330 4,950 016 DITCH EXCAVATION CY 265.0000 2,915.00 0.000 0 017 ROADSIDE CLEARING LS 56,900.0000 56,900.00 0.250 14,225.00 0.250 14,225 018 MAINTAIN EXISTING PLANTED AREAS LS 17,500.0000 17,500.00 0.200 3,500.00 0.200 3,500 019 CHECK AND TEST EXISTING IRRIGATION LS 5,500.0000 5,500.00 0.500 2,750.00 0.500 2,750 FACILITIES 020 REMOVE IRRIGATION FACILITY LS 5,500.0000 5,500.00 1.000 5,500.00 1.000 5,500 021 HYDROMULCH SQFT 0.0500 5,350.00 0.000 0 022 HYDROSEED SQFT 0.0400 85,600.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C6604 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 04/02/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/20 R.E. NAME: BENSON, DAVID DATE OF THIS ESTIMATE 09/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLASS 2 AGGREGATE BASE (CY) CY 130.0000 53,300.00 0.000 0 024 ROADSIDE PAVING (MISCELLANEOUS AREAS) SQYD 60.0000 22,200.00 0.000 0 025 ROCK SLOPE PROTECTION CY 400.0000 2,400.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 026 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 51.0000 816.00 0.000 0 027 MINOR CONCRETE (STAMPED CONCRETE) SQFT 10.0000 667,000.00 0.000 0 028 REMOVE ROADSIDE SIGN EA 215.0000 860.00 0.000 0 029 RESET ROADSIDE SIGN EA 435.0000 1,740.00 0.000 0 030 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 1,920.00 0.000 0 (0.063"-UNFRAMED) 031 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.0000 600.00 0.000 0 032 ROADSIDE SIGN - TWO POST EA 880.0000 3,520.00 0.000 0 033 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,000.0000 3,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 09/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1C6604 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 04/02/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/20 R.E. NAME: BENSON, DAVID DATE OF THIS ESTIMATE 09/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 125,402.25 130,402.25 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 718.75 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 125,402.25 131,121.00 034 MOBILIZATION LS 135,000.0000 135,000.00 0.750 101,250.00 0.750 101,250 ORIGINAL CONTRACT AMOUNT 1,443,700.00 TOTAL WORK COMPLETED 226,652.25 232,371.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 226,652.25 232,371.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/20 70 08/14/20 08/14/20 11/24/20 25 0 0 0 16% 36% PROGRESS IS SATISFACTORY BENSON, DAVID RESIDENT ENGINEER PROGRAM CAS145 DATE 09/22/20