PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/20/25 EST. NO. 008 TIME 01:52 PM R.E. NAME: GUGLIELMANA, THOMAS 08-1E1404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0010 2,321.38 E.W. @ F.A.(+) 071125 N 0010 0011 2,811.56 071525 N 0011 0012 6,459.91 071425 N 0012 007 0001 13,662.99 E.W. @ F.A.(+) 070825 N 0001 0003 9,310.68 070225 N 0003 0004 7,661.89 070925 N 0004 0005 2,299.23 071425 N 0005 0006 6,648.95 071525 N 0006 0008 6,760.90 071125 N 0008 0009 6,813.91 071425 N 0009 0010 6,462.41 071525 N 0010 71,213.81 TOTAL THIS ESTIMATE 79,051.06 TOTAL PREVIOUS ESTIMATE 150,264.87 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/20/25 EST. NO. 008 TIME 01:52 PM R.E. NAME: GUGLIELMANA, THOMAS 08-1E1404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 01:52 PM ESTIMATE NO. 008 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 08/20/25 LOCATION PROGRESS ESTIMATE 08-VAR ----------------- BEADOR CONSTRUCTION COMPANY, RIVERSIDE COUNTY AT VARIOUS LOCATIONS INC. 2900 BRISTOL STREET STE D204 COSTA MESA, CA 92626 FED. AID NO. SSTG-S079(48)E MGS, CONCRETE BARRIER AND VEGETATION CONTR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 5,250.0000 5,250.00 0.750 3,937 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 270,000.00 23.000 23,000.00 155.000 155,000 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 10,000.00 3.000 6,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 25,000.0000 25,000.00 0.085 2,125.00 0.574 14,350 007 CONSTRUCTION AREA SIGNS LS 100,000.0000 100,000.00 0.722 72,200 008 TRAFFIC CONTROL SYSTEM LS 470,665.0000 470,665.00 0.085 40,006.53 0.574 270,161 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 850.0000 119,000.00 11.000 9,350.00 78.000 66,300 010 TYPE III BARRICADE EA 90.0000 720.00 8.000 720 011 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5.0000 1,500.00 248.000 1,240 012 TEMPORARY TRAFFIC STRIPE (PAINT) LF 2.5000 6,425.00 2,825.000 7,062 013 CHANNELIZER (SURFACE MOUNTED) EA 52.0000 5,720.00 105.000 5,460 014 PORTABLE RADAR SPEED FEEDBACK SIGN EA 160.0000 43,200.00 38.000 6,080.00 141.000 22,560 SYSTEM DAY 015 TEMPORARY BARRIER SYSTEM LF 24.0000 156,960.00 80.000 1,920.00 5,940.000 142,560 016 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 12,000.0000 96,000.00 2.000 24,000.00 6.000 72,000 017 TEMPORARY AUTOMATED END OF QUEUE WARNING EA 1,300.0000 351,000.00 19.000 24,700.00 148.000 192,400 SYSTEM (TYPE 1) DAY 018 END OF QUEUE MONITORING AND WARNING WITH EA 1,300.0000 39,000.00 9.000 11,700.00 27.000 35,100 TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 019 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 5,000.0000 110,000.00 1.000 5,000.00 20.000 100,000 020 TEMPORARY RADAR SPEED FEEDBACK SIGN EA 500.0000 2,000.00 3.000 1,500 SYSTEM 021 JOB SITE MANAGEMENT LS 100,000.0000 100,000.00 0.085 8,500.00 0.574 57,400 PROGRAM CAS145 PAGE 2 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 01:52 PM ESTIMATE NO. 008 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 STORMWATER POLLUTION PREVENTION PLAN LS 3,000.0000 3,000.00 0.700 2,100 023 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 7,500.00 0.000 0 024 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 025 TEMPORARY SOIL BINDER SQYD 0.5000 7,000.00 0.000 0 026 TEMPORARY DRAINAGE INLET PROTECTION EA 155.0000 2,635.00 5.000 775 027 TEMPORARY FIBER ROLL LF 11.0000 33,000.00 0.000 0 028 TEMPORARY CONCRETE WASHOUT LS 27,500.0000 27,500.00 0.085 2,337.50 0.574 15,785 029 TREATED WOOD WASTE LB 0.5000 54,000.00 0.000 0 030 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 130,000.0000 130,000.00 0.085 11,050.00 0.574 74,620 031 REMOVE CONCRETE (CY) CY 4,700.0000 5,170.00 0.000 0 032 REMOVE CONCRETE (SQYD) SQYD 41.0000 13,530.00 330.000 13,530 033 TEMPORARY HIGH-VISIBILITY FENCE LF 7.8000 54,366.00 1,377.000 10,740.60 1,377.000 10,740 034 CLEARING AND GRUBBING (LS) LS 125,000.0000 125,000.00 0.152 19,000.00 0.574 71,750 035 ROADWAY EXCAVATION CY 475.0000 299,250.00 26.600 12,635.00 630.000 299,250 036 IMPORTED BORROW (CY) CY 710.0000 63,190.00 69.500 49,345 037 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2,100.0000 8,400.00 0.000 0 038 HYDROSEED SQFT 0.4000 26,560.00 33,200.000 13,280.00 33,200.000 13,280 039 HOT MIX ASPHALT (TYPE A) TON 265.0000 116,600.00 405.610 107,486.65 405.610 107,486 040 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 3.7000 36,852.00 9,950.000 36,815.00 9,950.000 36,815 041 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 6.6000 792.00 55.000 363.00 55.000 363 042 TACK COAT TON 8,750.0000 2,625.00 0.300 2,625.00 0.300 2,625 043 REMOVE ASPHALT CONCRETE DIKE LF 9.2000 107,640.00 777.000 7,148.40 11,375.600 104,655 044 STRUCTURAL CONCRETE, BARRIER SLAB (RSC) CY 1,750.0000 36,750.00 0.000 0 045 REMOVE ASPHALT CONCRETE SURFACING SQFT 44.0000 15,840.00 450.000 19,800 046 REMOVE PAVEMENT MARKER EA 3.3000 726.00 220.000 726 047 MGS DELINEATOR EA 33.0000 13,860.00 411.000 13,563.00 731.000 24,123 048 PAVEMENT MARKER (RETROREFLECTIVE) EA 11.0000 2,398.00 254.000 2,794 PROGRAM CAS145 PAGE 3 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 01:52 PM ESTIMATE NO. 008 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 OBJECT MARKER (TYPE P) EA 145.0000 3,190.00 0.000 0 050 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 23.0000 736.00 0.000 0 (0.080"-UNFRAMED) 051 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 160.0000 320.00 0.000 0 METHOD) 052 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 45.0000 796,500.00 930.000 41,850.00 17,199.500 773,977 053 VEGETATION CONTROL (MINOR CONCRETE) SQYD 115.0000 614,100.00 362.000 41,630.00 7,160.020 823,402 054 TRANSITION RAILING (TYPE WB-31) EA 5,600.0000 123,200.00 1.000 5,600.00 16.000 89,600 055 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,130.0000 34,080.00 1.000 2,130.00 16.000 34,080 056 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 5,050.0000 141,400.00 24.000 121,200 057 ALTERNATIVE CRASH CUSHION TL-3 EA 52,500.0000 262,500.00 0.000 0 058 CONCRETE BARRIER (TYPE 836B MODIFIED) LF 380.0000 1,014,600.00 2,646.497 1,005,668 059 CONCRETE BARRIER TRANSITION LF 1,000.0000 97,000.00 35.150 35,150.00 35.150 35,150 (F) 060 REMOVE GUARDRAIL LF 10.0000 61,500.00 1,000.000 10,000.00 5,848.000 58,480 061 REMOVE CONCRETE BARRIER LF 785.0000 7,850.00 0.000 0 062 REMOVE CRASH CUSHION EA 2,500.0000 12,500.00 5.000 12,500 063 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.6000 6,682.00 2,840.000 7,384.00 5,680.000 14,768 (ENHANCED WET NIGHT VISIBILITY) 064 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.7000 19,018.00 5,685.000 21,034 065 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,500.0000 3,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 066 FLASHING BEACON SYSTEM LS 160,000.0000 160,000.00 0.000 0 067 TEMPORARY SIGNAL SYSTEMS LS 170,000.0000 170,000.00 1.000 170,000 068 TEMPORARY FLASHING BEACON SYSTEMS LS 95,000.0000 95,000.00 0.600 57,000.00 1.000 95,000 PROGRAM CAS145 PAGE 4 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 01:52 PM ESTIMATE NO. 008 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 594,169.68 5,336,376.64 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 71,213.81 150,264.87 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 665,383.49 5,486,641.51 069 MOBILIZATION LS 740,000.0000 740,000.00 1.000 740,000 ORIGINAL CONTRACT AMOUNT 7,481,300.00 TOTAL WORK COMPLETED 665,383.49 6,226,641.51 MATERIALS ON HAND ON SITE -2,618.00 29,709.00 DEDUCTIONS 0.00 0.00 TOTAL 662,765.49 6,256,350.51 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/05/24 270 10/15/24 12/07/24 02/06/26 155 23 0 0 78% 57% PROGRESS IS SATISFACTORY GUGLIELMANA, THOMAS RESIDENT ENGINEER