PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/23/25 EST. NO. 012 TIME 08:32 AM R.E. NAME: GUGLIELMANA, THOMAS 08-1E1404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0017 2,810.35 E.W. @ F.A.(+) 101325 N 0017 0018 8,155.15 102325 N 0018 0019 1,246.84 100125 N 0019 002 0001 14,289.00 E.W. @ L.S.(+) 112524 N 0001 0002 3,300.00 112425 N 0002 010 0001 5,532.67 E.W. @ F.A.(+) 092625 N 0001 011 0003 1,081.11 E.W. @ F.A.(+) 111825 N 0003 0004 539.62 111925 N 0004 36,954.74 TOTAL THIS ESTIMATE 345,148.80 TOTAL PREVIOUS ESTIMATE 382,103.54 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/23/25 EST. NO. 012 TIME 08:32 AM R.E. NAME: GUGLIELMANA, THOMAS 08-1E1404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/23/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 08:32 AM ESTIMATE NO. 012 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 12/23/25 LOCATION RERUN PROGRESS ESTIMATE 08-VAR ----------------------- BEADOR CONSTRUCTION COMPANY, RIVERSIDE COUNTY AT VARIOUS LOCATIONS INC. 2900 BRISTOL STREET STE D204 COSTA MESA, CA 92626 FED. AID NO. SSTG-S079(48)E MGS, CONCRETE BARRIER AND VEGETATION CONTR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 5,250.0000 5,250.00 0.200 1,050.00 1.000 5,250 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 270,000.00 18.000 18,000.00 232.000 232,000 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 10,000.00 3.000 6,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 25,000.0000 25,000.00 0.050 1,250.00 1.000 25,000 007 CONSTRUCTION AREA SIGNS LS 100,000.0000 100,000.00 0.952 95,200 008 TRAFFIC CONTROL SYSTEM LS 470,665.0000 470,665.00 0.950 447,131 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 850.0000 119,000.00 10.000 8,500.00 124.000 105,400 010 TYPE III BARRICADE EA 90.0000 720.00 8.000 720 011 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5.0000 1,500.00 466.000 2,330 012 TEMPORARY TRAFFIC STRIPE (PAINT) LF 2.5000 6,425.00 2,825.000 7,062 013 CHANNELIZER (SURFACE MOUNTED) EA 52.0000 5,720.00 110.000 5,720 014 PORTABLE RADAR SPEED FEEDBACK SIGN EA 160.0000 43,200.00 10.000 1,600.00 211.000 33,760 SYSTEM DAY 015 TEMPORARY BARRIER SYSTEM LF 24.0000 156,960.00 5,940.000 142,560 016 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 12,000.0000 96,000.00 6.000 72,000 017 TEMPORARY AUTOMATED END OF QUEUE WARNING EA 1,300.0000 351,000.00 208.000 270,400 SYSTEM (TYPE 1) DAY 018 END OF QUEUE MONITORING AND WARNING WITH EA 1,300.0000 39,000.00 30.000 39,000 TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 019 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 5,000.0000 110,000.00 20.000 100,000 020 TEMPORARY RADAR SPEED FEEDBACK SIGN EA 500.0000 2,000.00 4.000 2,000 SYSTEM 021 JOB SITE MANAGEMENT LS 100,000.0000 100,000.00 0.050 5,000.00 1.000 100,000 PROGRAM CAS145 PAGE 2 DATE 12/23/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 08:32 AM ESTIMATE NO. 012 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 12/23/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 STORMWATER POLLUTION PREVENTION PLAN LS 3,000.0000 3,000.00 0.050 150.00 1.000 3,000 023 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 7,500.00 0.000 0 024 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 1.000 2,000 025 TEMPORARY SOIL BINDER SQYD 0.5000 7,000.00 0.000 0 026 TEMPORARY DRAINAGE INLET PROTECTION EA 155.0000 2,635.00 17.000 2,635 027 TEMPORARY FIBER ROLL LF 11.0000 33,000.00 0.000 0 028 TEMPORARY CONCRETE WASHOUT LS 27,500.0000 27,500.00 1.000 27,500 029 TREATED WOOD WASTE LB 0.5000 54,000.00 52,420.000 26,210 030 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 130,000.0000 130,000.00 0.050 6,500.00 1.000 130,000 031 REMOVE CONCRETE (CY) CY 4,700.0000 5,170.00 0.000 0 032 REMOVE CONCRETE (SQYD) SQYD 41.0000 13,530.00 330.000 13,530 033 TEMPORARY HIGH-VISIBILITY FENCE LF 7.8000 54,366.00 1,377.000 10,740 034 CLEARING AND GRUBBING (LS) LS 125,000.0000 125,000.00 1.000 125,000 035 ROADWAY EXCAVATION CY 475.0000 299,250.00 630.000 299,250 036 IMPORTED BORROW (CY) CY 710.0000 63,190.00 82.000 58,220 037 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2,100.0000 8,400.00 1.000 2,100.00 3.000 6,300 038 HYDROSEED SQFT 0.4000 26,560.00 26,560.000 10,624.00 66,400.000 26,560 039 HOT MIX ASPHALT (TYPE A) TON 265.0000 116,600.00 405.610 107,486 040 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 3.7000 36,852.00 9,950.000 36,815 041 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 6.6000 792.00 120.000 792 042 TACK COAT TON 8,750.0000 2,625.00 0.300 2,625 043 REMOVE ASPHALT CONCRETE DIKE LF 9.2000 107,640.00 11,700.000 107,640 044 STRUCTURAL CONCRETE, BARRIER SLAB (RSC) CY 1,750.0000 36,750.00 0.000 0 045 REMOVE ASPHALT CONCRETE SURFACING SQFT 44.0000 15,840.00 450.000 19,800 046 REMOVE PAVEMENT MARKER EA 3.3000 726.00 220.000 726 047 MGS DELINEATOR EA 33.0000 13,860.00 731.000 24,123 048 PAVEMENT MARKER (RETROREFLECTIVE) EA 11.0000 2,398.00 254.000 2,794 PROGRAM CAS145 PAGE 3 DATE 12/23/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 08:32 AM ESTIMATE NO. 012 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 12/23/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 OBJECT MARKER (TYPE P) EA 145.0000 3,190.00 1.000 145.00 18.000 2,610 050 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 23.0000 736.00 32.000 736.00 32.000 736 (0.080"-UNFRAMED) 051 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 160.0000 320.00 2.000 320.00 2.000 320 METHOD) 052 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 45.0000 796,500.00 17,258.500 776,632 053 VEGETATION CONTROL (MINOR CONCRETE) SQYD 115.0000 614,100.00 7,253.020 834,097 054 TRANSITION RAILING (TYPE WB-31) EA 5,600.0000 123,200.00 18.000 100,800 055 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,130.0000 34,080.00 16.000 34,080 056 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 5,050.0000 141,400.00 25.000 126,250 057 ALTERNATIVE CRASH CUSHION TL-3 EA 52,500.0000 262,500.00 7.000 367,500 058 CONCRETE BARRIER (TYPE 836B MODIFIED) LF 380.0000 1,014,600.00 2,904.997 1,103,898 059 CONCRETE BARRIER TRANSITION LF 1,000.0000 97,000.00 40.000 40,000 (F) 060 REMOVE GUARDRAIL LF 10.0000 61,500.00 5,848.000 58,480 061 REMOVE CONCRETE BARRIER LF 785.0000 7,850.00 0.000 0 062 REMOVE CRASH CUSHION EA 2,500.0000 12,500.00 5.000 12,500 063 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.6000 6,682.00 5,680.000 14,768 (ENHANCED WET NIGHT VISIBILITY) 064 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.7000 19,018.00 5,687.000 21,041 065 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,500.0000 3,500.00 1.000 3,500 SYSTEM ELEMENTS DURING CONSTRUCTION 066 FLASHING BEACON SYSTEM LS 160,000.0000 160,000.00 0.880 140,800.00 0.880 140,800 067 TEMPORARY SIGNAL SYSTEMS LS 170,000.0000 170,000.00 1.000 170,000 068 TEMPORARY FLASHING BEACON SYSTEMS LS 95,000.0000 95,000.00 1.000 95,000 PROGRAM CAS145 PAGE 4 DATE 12/23/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E1404 TIME 08:32 AM ESTIMATE NO. 012 BID OPENING 01/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: GUGLIELMANA, THOMAS DATE OF THIS ESTIMATE 12/23/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 196,775.00 6,633,296.06 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 36,954.74 382,103.54 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 233,729.74 7,015,399.60 069 MOBILIZATION LS 740,000.0000 740,000.00 1.000 740,000 ORIGINAL CONTRACT AMOUNT 7,481,300.00 TOTAL WORK COMPLETED 233,729.74 7,755,399.60 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 233,729.74 7,755,399.60 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/05/24 270 10/15/24 12/07/24 02/06/26 18 28 0 0 93% 7% PROGRESS IS SATISFACTORY GUGLIELMANA, THOMAS RESIDENT ENGINEER