PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/27/15 EST. NO. 003 TIME 09:00 AM R.E. NAME: QUACH, ANDY 08-1E4304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 944.80 E.W. @ F.A.(+) 081215 N 220201 0002 822.62 083115 N 220202 0003 449.72 090315 N 220203 2,217.14 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 2,217.14 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/27/15 EST. NO. 003 TIME 09:00 AM R.E. NAME: QUACH, ANDY 08-1E4304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/27/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E4304 TIME 09:00 AM ESTIMATE NO. 003 BID OPENING 04/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/15 R.E. NAME: QUACH, ANDY DATE OF THIS ESTIMATE 10/27/15 LOCATION PROGRESS ESTIMATE 08-RIV-10-R1.9/R82.5 ----------------- WESTERN STRUCTURES AT VARIOUS LOCATIONS IN RIV & SBD 6005 TYLER STREET CO IN THE CITIES OF COACHELLA, RIVERSIDE CA 92503 INDIO, BEAUMONT,CALIMESA, CORONA, RIVERSIDE AND MONTCLAIR, UPLAND, CHINO, COLTON, SAN BERNARDINO FED. AID NO. N O N E BRIDGE PRESERVATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,080.0000 1,080.00 0.200 216.00 0.800 864 002 CONSTRUCTION AREA SIGNS LS 24,786.0000 24,786.00 0.700 17,350 003 TRAFFIC CONTROL SYSTEM LS 70,092.0000 70,092.00 0.200 14,018.40 0.600 42,055 004 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 1,944.0000 7,776.00 1.000 1,944.00 4.000 7,776 005 JOB SITE MANAGEMENT LS 2,397.6000 2,397.60 0.200 479.52 0.600 1,438 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,080.0000 1,080.00 0.150 162.00 0.750 810 007 TEMPORARY CONCRETE WASHOUT LS 745.2000 745.20 0.000 0 008 ASBESTOS COMPLIANCE PLAN LS 2,160.0000 2,160.00 0.000 0 009 PUBLIC SAFETY PLAN LS 550.8000 550.80 0.000 0 010 REPAIR SPALLED SURFACE AREA SQFT 156.8400 1,882.08 0.000 0 011 REMOVE GUARDRAIL LF 8.7600 4,292.40 490.000 4,292.40 490.000 4,292 012 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.6600 11,946.00 18,045.000 11,909 013 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 11.0200 495.90 45.000 495 014 REMOVE PAVEMENT MARKER EA 1.1000 385.00 344.000 378 015 REMOVE ASPHALT CONCRETE DIKE LF 25.9200 2,851.20 0.000 0 016 REMOVE ASPHALT CONCRETE SURFACING SQFT 1.2800 18,127.36 0.000 0 017 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.6800 38,365.60 0.000 0 018 POLYESTER CONCRETE EXPANSION DAM CF 261.3200 7,578.28 17.000 4,442 019 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1200 24,218.88 187,662.000 22,519 020 TREAT BRIDGE DECK SQFT 0.4000 80,729.60 187,662.000 75,064 (F) 021 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 55.2200 123,913.68 2,432.900 134,344 022 CLEAN BRIDGE DECK DRAINAGE SYSTEM LF 17.9200 9,766.40 0.000 0 PROGRAM CAS145 PAGE 2 DATE 10/27/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E4304 TIME 09:00 AM ESTIMATE NO. 003 BID OPENING 04/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/15 R.E. NAME: QUACH, ANDY DATE OF THIS ESTIMATE 10/27/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ACCESS OPENING, SOFFIT EA 6,190.2900 12,380.58 2.000 12,380 024 BRIDGE REMOVAL (PORTION) LS 7,797.3600 7,797.36 1.000 7,797 025 STRUCTURE BACKFILL (SLURRY CEMENT) CY 2,178.0500 2,178.05 1.000 2,178 (F) 026 HOT MIX ASPHALT (TYPE A) TON 170.1900 212,737.50 0.000 0 027 SHOULDER RUMBLE STRIP STA 93.2600 1,958.46 0.000 0 (HMA,GROUND-IN INDENTATIONS) 028 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 34.9700 3,846.70 0.000 0 029 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 36.6700 2,053.52 0.000 0 030 TACK COAT TON 7,128.0000 7,840.80 0.000 0 031 CLEAN EXPANSION JOINT LF 12.3200 21,670.88 617.000 7,601.44 1,521.000 18,738 032 PAINT BRIDGE NAME AND NUMBER EA 55.0800 991.44 6.000 330 033 JOINT SEAL (MR 1/2") LF 31.3400 8,399.12 222.500 6,973 034 BONDED JOINT SEAL (MR 1") LF 36.2000 6,298.80 176.000 6,371 035 BONDED JOINT SEAL (MR 2") LF 30.9500 14,794.10 560.000 17,332.00 560.000 17,332 036 BONDED JOINT SEAL (MR 2 1/2") LF 64.8700 5,708.56 97.000 6,292.39 97.000 6,292 037 JOINT SEAL (MR 1") LF 39.7500 17,251.50 108.000 4,293.00 475.500 18,901 038 JOINT SEAL (MR 1 1/2") LF 118.8100 4,633.59 89.400 10,621 039 JOINT SEAL (TYPE AL) LF 33.2900 3,994.80 61.000 2,030 040 JOINT SEAL (ASPHALTIC PLUG) LF 101.5900 16,660.76 0.000 0 041 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.7500 528.75 0.000 0 (0.063"-UNFRAMED) 042 ROADSIDE SIGN - ONE POST EA 247.8600 2,230.74 0.000 0 043 SLOPE PAVING (CONCRETE) CY 1,219.0900 9,752.72 7.000 8,533 (F) 044 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 34.9400 5,241.00 150.000 5,241.00 150.000 5,241 045 TRANSITION RAILING (TYPE WB-31) EA 4,273.7100 17,094.84 4.000 17,094.84 4.000 17,094 046 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,219.4800 6,438.96 2.000 6,438.96 2.000 6,438 047 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,144.8800 4,289.76 2.000 4,289.76 2.000 4,289 048 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.8600 15,910.00 8,300.000 7,138 049 THERMOPLASTIC PAVEMENT MARKING SQFT 27.0000 1,215.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/27/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E4304 TIME 09:00 AM ESTIMATE NO. 003 BID OPENING 04/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/15 R.E. NAME: QUACH, ANDY DATE OF THIS ESTIMATE 10/27/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PAVEMENT MARKER (NON-REFLECTIVE) EA 4.3200 432.00 0.000 0 051 PAVEMENT MARKER (RETROREFLECTIVE) EA 8.6400 2,160.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 10/27/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E4304 TIME 09:00 AM ESTIMATE NO. 003 BID OPENING 04/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/15 R.E. NAME: QUACH, ANDY DATE OF THIS ESTIMATE 10/27/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 89,695.71 482,425.33 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,217.14 2,217.14 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 91,912.85 484,642.47 052 MOBILIZATION LS 83,500.0000 83,500.00 0.050 4,175.00 1.000 83,500 ORIGINAL CONTRACT AMOUNT 935,210.27 TOTAL WORK COMPLETED 96,087.85 568,142.47 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 96,087.85 568,142.47 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/09/15 100 00/00/00 00/00/00 11/25/15 74 8 0 0 58% 74% PROGRESS IS SATISFACTORY QUACH, ANDY RESIDENT ENGINEER PROGRAM CAS145 DATE 10/27/15