PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/18 EST. NO. 014 TIME 02:15 PM R.E. NAME: CALIXTO, MIGUEL 08-1E6504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0056 9,858.41 E.W. @ F.A.(+) 032718 N 0056 0 0062 1,500.57 041718 N 0062 0 010 0001 110,852.90 A.C. @ L.S.(+) 032718 N 1 0 122,211.88 TOTAL THIS ESTIMATE 249,744.46 TOTAL PREVIOUS ESTIMATE 371,956.34 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/18 EST. NO. 014 TIME 02:15 PM R.E. NAME: CALIXTO, MIGUEL 08-1E6504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING DOCUMENTS -10,000.00 008 MISSING DOCS -10,000.00 011 MISSING DOCS 10,000.00 011 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E6504 TIME 02:15 PM ESTIMATE NO. 014 BID OPENING 11/30/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/14/18 R.E. NAME: CALIXTO, MIGUEL DATE OF THIS ESTIMATE 06/18/18 LOCATION PROGRESS ESTIMATE 08-RIV-60-R0.0/12.2 ----------------- POWELL CONSTRUCTORS INC IN THE CITY OF RIVERSIDE FROM 8555 BANANA AVE SAN BERNARDINO COUNTY LINE TO FONTANA CA 92335 60-91-215 JCT FED. AID NO. ACHS-NHP0-6(14)9E INSTALL DOUBLE LUMINAIRE MAST ARMS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,750.0000 2,750.00 1.000 2,750 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 4,000.0000 4,000.00 0.250 1,000.00 0.750 3,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 240,000.00 240.000 240,000 004 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 0.100 3,500.00 1.000 35,000 005 TRAFFIC CONTROL SYSTEM LS 550,000.0000 550,000.00 1.000 550,000 006 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 3.0000 1,530.00 220.000 660 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.1000 20,700.00 242,534.000 24,253 008 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 5,400.00 199.000 5,970 009 TEMPORARY PAVEMENT MARKER EA 1.5000 39,900.00 26,106.000 39,159 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 8,500.0000 34,000.00 4.000 34,000 011 TEMPORARY RAILING (TYPE K) LF 10.0000 647,000.00 63,820.000 638,200 012 TEMPORARY CRASH CUSHION MODULE EA 200.0000 34,000.00 168.000 33,600 013 JOB SITE MANAGEMENT LS 40,000.0000 40,000.00 1.000 40,000 014 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 0.750 1,875 015 TEMPORARY SOIL BINDER SQYD 1.0000 3,880.00 0.000 0 016 TEMPORARY DRAINAGE INLET PROTECTION EA 170.0000 37,400.00 60.000 10,200 017 TEMPORARY CONCRETE WASHOUT LS 30,000.0000 30,000.00 1.000 30,000 018 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.1500 9,705.00 63,639.000 9,545 STRIPE (HAZARDOUS WASTE) 019 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.1500 22,650.00 142,302.000 21,345 020 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 1,280.00 374.000 748 021 REMOVE PAVEMENT MARKER EA 0.5000 16,500.00 23,112.000 11,556 022 REMOVE BASE AND SURFACING CY 485.0000 101,850.00 141.930 68,836.05 193.690 93,939 PROGRAM CAS145 PAGE 2 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E6504 TIME 02:15 PM ESTIMATE NO. 014 BID OPENING 11/30/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/14/18 R.E. NAME: CALIXTO, MIGUEL DATE OF THIS ESTIMATE 06/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.5000 65,500.00 22,476.490 56,191 024 REMOVE CONCRETE BARRIER LF 77.0000 562,100.00 7,302.920 562,324 025 DEVELOP WATER SUPPLY LS 5,000.0000 5,000.00 0.000 0 026 ROADWAY EXCAVATION CY 320.0000 25,600.00 14.290 4,572.80 72.960 23,347 027 CLASS 2 AGGREGATE BASE (CY) CY 275.0000 22,000.00 10.740 2,953.50 72.940 20,058 028 HOT MIX ASPHALT (TYPE A) TON 106.0000 451,560.00 3,545.950 375,870 029 MINOR CONCRETE (BACKFILL) CY 485.0000 87,300.00 14.740 7,148.90 155.980 75,650 030 18" SLOTTED CORRUGATED STEEL PIPE LF 200.0000 246,000.00 1,230.000 246,000 (.064" THICK) 031 CONCRETE BARRIER (TYPE 60F MOD) LF 240.0000 650,400.00 1,309.600 314,304 032 CONCRETE BARRIER (TYPE 60G MOD) LF 230.0000 945,300.00 4,011.260 922,589 033 CONCRETE BARRIER (TYPE 60G) LF 170.0000 79,900.00 464.120 78,900 034 CONCRETE BARRIER (TYPE 60GE MOD) LF 435.0000 20,880.00 48.000 20,880 035 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 1,920.00 506.000 1,518 036 THERMOPLASTIC TRAFFIC STRIPE LF 0.1700 76,670.00 382,205.000 64,974 (SPRAYABLE) 037 PAINT TRAFFIC STRIPE (2-COAT) LF 0.0800 23,520.00 250,622.000 20,049 038 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 27,500.00 0.000 0 039 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.5500 26,265.00 8,883.000 22,651 040 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10,000.0000 10,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 041 MODIFYING EXISTING ELECTRICAL SYSTEM LS 2,375,000.0000 2,375,000.00 0.990 2,351,250 PROGRAM CAS145 PAGE 3 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E6504 TIME 02:15 PM ESTIMATE NO. 014 BID OPENING 11/30/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/14/18 R.E. NAME: CALIXTO, MIGUEL DATE OF THIS ESTIMATE 06/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 88,011.25 6,982,363.43 ADJUSTMENT OF COMPENSATION 110,852.90 91,594.18 EXTRA WORK 11,358.98 280,362.16 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 210,223.13 7,354,319.77 042 MOBILIZATION LS 835,000.0000 835,000.00 1.000 835,000 ORIGINAL CONTRACT AMOUNT 8,417,460.00 TOTAL WORK COMPLETED 210,223.13 8,189,319.77 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -10,000.00 TOTAL 210,223.13 8,179,319.77 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/11/17 240 00/00/00 05/11/17 07/02/18 262 11 0 0 96% 100% PROGRESS IS SATISFACTORY CALIXTO, MIGUEL RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/18