PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/04/18 EST. NO. 003 TIME 03:10 PM R.E. NAME: TRAN KEN 08-1E9824 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/04/18 EST. NO. 003 TIME 03:10 PM R.E. NAME: TRAN KEN 08-1E9824 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/04/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E9824 TIME 03:10 PM ESTIMATE NO. 003 BID OPENING 06/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: TRAN KEN DATE OF THIS ESTIMATE 12/04/18 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 08-SBD-18-34.5/36.2 ------------------------------ DANNY C. HUBBS CONSTRUCTION, NEAR RUNNING SPRINGS FR GREEN INC VALLEY LAKE RD TO 0.3 MI W/O SNOW 37306 VISTA VIEW DR. VALLEY YUCAIPA CA 92399 FED. AID NO. SSTG-P018(60)E INSTALL MIDWEST GUARDRAIL SYSTEM ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 920.0000 920.00 1.000 920 002 CONSTRUCTION AREA SIGNS LS 6,120.0000 6,120.00 0.800 4,896 003 TRAFFIC CONTROL SYSTEM LS 95,788.0000 95,788.00 0.100 9,578.80 0.600 57,472 004 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 5.5000 352.00 64.000 352 005 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,135.0000 8,540.00 3.000 6,405 006 JOB SITE MANAGEMENT LS 1,555.0000 1,555.00 1.000 1,555 007 PREPARE WATER POLLUTION CONTROL PROGRAM LS 595.0000 595.00 0.750 446 008 TEMPORARY SOIL BINDER SQYD 2.4500 1,813.00 0.000 0 009 TEMPORARY DRAINAGE INLET PROTECTION EA 1,790.0000 14,320.00 4.000 7,160 010 TEMPORARY CONCRETE WASHOUT LS 1,800.0000 1,800.00 1.000 1,800 011 TREATED WOOD WASTE LB 0.8500 1,275.00 0.000 0 012 CLEARING AND GRUBBING (LS) LS 15,000.0000 15,000.00 0.100 1,500.00 0.600 9,000 013 ROADWAY EXCAVATION CY 33.0000 21,450.00 0.000 0 014 ROCK EXCAVATION CY 195.0000 17,355.00 0.000 0 015 CLASS 2 AGGREGATE BASE (CY) CY 250.0000 22,250.00 58.000 14,500 016 HOT MIX ASPHALT (TYPE A) TON 230.0000 12,190.00 34.220 7,870 017 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 385.0000 4,620.00 12.000 4,620 018 GUARD RAILING DELINEATOR EA 33.0000 3,960.00 18.000 594.00 86.000 2,838 019 SNOW POLE MARKER EA 190.0000 30,400.00 3.000 570.00 3.000 570 020 REMOVE MARKER EA 30.0000 2,460.00 0.000 0 021 RESET MILEPOST MARKER EA 120.0000 1,320.00 0.000 0 022 RESET ROADSIDE SIGN (ONE POST) EA 240.0000 3,120.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 12/04/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E9824 TIME 03:10 PM ESTIMATE NO. 003 BID OPENING 06/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: TRAN KEN DATE OF THIS ESTIMATE 12/04/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MIDWEST GUARDRAIL SYSTEM (9' STEEL POST) LF 42.0000 292,740.00 775.000 32,550.00 4,225.000 177,450 024 VEGETATION CONTROL (MINOR CONCRETE) SQYD 155.0000 12,555.00 0.000 0 025 TRANSITION RAILING (TYPE WB-31) EA 5,200.0000 5,200.00 2.000 10,400 026 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,860.0000 46,320.00 3.000 11,580.00 9.000 34,740 027 CONCRETE BARRIER (TYPE 60MS) LF 375.0000 33,750.00 75.000 28,125 028 REMOVE GUARDRAIL LF 20.0000 1,120.00 56.000 1,120.00 56.000 1,120 PROGRAM CAS145 PAGE 3 DATE 12/04/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1E9824 TIME 03:10 PM ESTIMATE NO. 003 BID OPENING 06/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/18 R.E. NAME: TRAN KEN DATE OF THIS ESTIMATE 12/04/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 57,492.80 372,240.65 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 16,954.20 SUBTOTAL AMOUNT EARNED 57,492.80 389,194.85 ORIGINAL CONTRACT AMOUNT 658,888.00 TOTAL WORK COMPLETED 57,492.80 389,194.85 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 57,492.80 389,194.85 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/23/18 35 08/07/18 08/07/18 12/07/18 34 46 3 0 55% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDDEN AND PCNT TIME ELAPSED INPUT BECAUSE SATISFACTORY PROGRESS *** SUSPENDED ON 12/03/18. TRAN KEN RESIDENT ENGINEER PROGRAM CAS145 DATE 12/04/18