PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/25/16 EST. NO. 001 TIME 02:50 PM R.E. NAME: YANG, CHAD 08-1G1004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/25/16 EST. NO. 001 TIME 02:50 PM R.E. NAME: YANG, CHAD 08-1G1004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/25/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1G1004 TIME 02:50 PM ESTIMATE NO. 001 BID OPENING 02/02/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/16 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 05/25/16 LOCATION PROGRESS ESTIMATE 08-RIV-74-36.5/42.6 ----------------- PAVEMENT COATINGS CO IN HEMET FROM 0.5 MILE W/O WARREN 10240 SAN SEVAINE WAY ROAD TO DARTMOUTH STREET JURUPA VALLEY CA 91752 FED. AID NO. N O N E PREVENTATIVE MAINTENANCE TREATMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,140.0000 2,140.00 0.500 1,070.00 0.500 1,070 002 CONSTRUCTION AREA SIGNS LS 17,000.0000 17,000.00 0.600 10,200.00 0.600 10,200 003 TRAFFIC CONTROL SYSTEM LS 128,000.0000 128,000.00 0.300 38,400.00 0.300 38,400 004 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 4,300.0000 17,200.00 3.000 12,900.00 3.000 12,900 005 JOB SITE MANAGEMENT LS 10,213.0000 10,213.00 0.300 3,063.90 0.300 3,063 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 560.0000 560.00 1.000 560.00 1.000 560 007 TEMPORARY FENCE (TYPE ESA) LF 3.4500 3,450.00 400.000 1,380.00 400.000 1,380 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.4300 23,693.00 33,052.000 14,212.36 33,052.000 14,212 STRIPE (HAZARDOUS WASTE) 009 REMOVE YELLOW THERMOPLASTIC PAVEMENT SQFT 3.2100 834.60 72.000 231.12 72.000 231 MARKING (HAZARDOUS WASTE) 010 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 11,600.0000 11,600.00 0.500 5,800.00 0.500 5,800 011 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2100 15,288.00 49,459.000 10,386.39 49,459.000 10,386 012 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.6100 37,513.00 15,620.000 25,148.20 15,620.000 25,148 013 REMOVE PAVEMENT MARKER EA 1.0700 8,132.00 3,966.000 4,243.62 3,966.000 4,243 014 CRACK TREATMENT LNMI 5,625.0000 213,750.00 7.980 44,887.50 7.980 44,887 015 SLURRY SEAL TON 138.0000 466,440.00 0.000 0 016 PREPAVING INERTIAL PROFILER LS 2,200.0000 2,200.00 0.000 0 017 REPLACE ASPHALT CONCRETE SURFACING CY 211.0000 295,400.00 1,385.600 292,361.60 1,385.600 292,361 018 TACK COAT TON 620.0000 1,860.00 3.720 2,306.40 3.720 2,306 019 THERMOPLASTIC PAVEMENT MARKING SQFT 2.3500 55,460.00 0.000 0 020 THERMOPLASTIC TRAFFIC STRIPE LF 0.2100 26,880.00 0.000 0 (SPRAYABLE) 021 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.6800 20,368.00 0.000 0 022 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,100.0000 1,100.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 05/25/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1G1004 TIME 02:50 PM ESTIMATE NO. 001 BID OPENING 02/02/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/16 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 05/25/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 INDUCTIVE LOOP DETECTOR (LS) LS 43,800.0000 43,800.00 0.000 0 024 MODIFY SIGNAL LS 44,500.0000 44,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/25/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1G1004 TIME 02:50 PM ESTIMATE NO. 001 BID OPENING 02/02/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/16 R.E. NAME: YANG, CHAD DATE OF THIS ESTIMATE 05/25/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 467,151.09 467,151.09 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 467,151.09 467,151.09 ORIGINAL CONTRACT AMOUNT 1,447,381.60 TOTAL WORK COMPLETED 467,151.09 467,151.09 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 467,151.09 467,151.09 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/09/16 45 00/00/00 00/00/00 07/06/16 13 7 0 0 32% 29% PROGRESS IS SATISFACTORY YANG, CHAD RESIDENT ENGINEER PROGRAM CAS145 DATE 05/25/16