PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/24/24 EST. NO. 006 TIME 12:07 PM R.E. NAME: SANCHEZ, OMAR 08-1H0604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 105,960.64 E.W. @ L.S.(+) 011824 N 0001 0 0001-1 -105,960.64 011824 N 0001 0 DAO CORRECTING ENTRY 0002 105,960.64 011824 N 0002 0 105,960.64 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 105,960.64 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/24/24 EST. NO. 006 TIME 12:07 PM R.E. NAME: SANCHEZ, OMAR 08-1H0604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/24/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 12:07 PM ESTIMATE NO. 006 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 01/24/24 LOCATION RERUN PROGRESS ESTIMATE 08-RIV-74-34.3/45.1 ----------------------- GRIFFITH COMPANY RIVERSIDE COUNTY IN AND NEAR HEMET FROM 1128 CARRIER PARKWAY AVE WINCHESTER ROAD TO FAIRVIEW AVENUE BAKERSFIELD CA 93308 FED. AID NO. ACNH-P074(72)E FIBER OPTIC CABLE SYSTEMS, RHMA, HMA, AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 32,000.0000 32,000.00 1.000 32,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,300.0000 351,000.00 10.000 13,000.00 102.000 132,600 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 42,000.00 2.000 12,000 005 HOURLY OFF-SITE HR 230.0000 32,200.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 14,000.0000 14,000.00 0.037 518.00 0.499 6,986 007 CONSTRUCTION AREA SIGNS LS 63,000.0000 63,000.00 0.015 945.00 0.551 34,713 008 TRAFFIC CONTROL SYSTEM LS 1,100,000.0000 1,100,000.00 0.037 40,700.00 0.378 415,800 009 PORTABLE RADAR SPEED FEEDBACK SIGN EA 30.0000 16,200.00 20.000 600.00 149.000 4,470 SYSTEM DAY 010 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 40,000.0000 40,000.00 0.037 1,480.00 0.663 26,520 011 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 4,000.0000 16,000.00 2.000 8,000 012 JOB SITE MANAGEMENT LS 37,000.0000 37,000.00 0.037 1,369.00 0.378 13,986 013 PREPARE STORM WATER POLLUTION PREVENTION LS 2,500.0000 2,500.00 1.000 2,500 PLAN 014 STORM WATER ANNUAL REPORT EA 1,800.0000 3,600.00 0.000 0 015 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 6,400.00 16.000 6,400 016 TEMPORARY FIBER ROLL LF 3.4500 82,800.00 5,825.000 20,096 017 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 16,000.00 1.000 4,000 018 STREET SWEEPING LS 24,000.0000 24,000.00 0.037 888.00 0.378 9,072 019 TEMPORARY CONCRETE WASHOUT LS 6,000.0000 6,000.00 0.037 222.00 0.378 2,268 020 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 52,000.0000 52,000.00 0.037 1,924.00 0.378 19,656 021 REMOVE CONCRETE (SQYD) SQYD 31.0000 337,900.00 364.000 11,284.00 3,304.200 102,430 022 TEMPORARY HIGH-VISIBILITY FENCE LF 9.3000 30,969.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 01/24/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 12:07 PM ESTIMATE NO. 006 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 01/24/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEARING AND GRUBBING (LS) LS 30,000.0000 30,000.00 0.010 300.00 0.510 15,300 024 ROADWAY EXCAVATION CY 50.0000 189,500.00 360.000 18,000.00 1,410.000 70,500 025 SHOULDER BACKING TON 32.0000 38,720.00 0.000 0 026 ROCK BLANKET SQFT 24.5000 198,450.00 0.000 0 027 CLASS 2 AGGREGATE BASE (CY) CY 300.0000 390,000.00 146.240 43,872.00 680.470 204,141 028 REPLACE ASPHALT CONCRETE SURFACING CY 385.0000 2,310,000.00 0.000 0 029 PRIME COAT TON 1,000.0000 9,000.00 0.000 0 030 HOT MIX ASPHALT (TYPE A) TON 143.0000 4,390,100.00 18.700 2,674.10 318.430 45,535 031 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 144.0000 6,408,000.00 0.000 0 032 TACK COAT TON 900.0000 82,800.00 0.000 0 033 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 130.0000 92,300.00 186.000 24,180 034 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.8700 1,259,930.00 0.000 0 035 JOINTED PLAIN CONCRETE PAVEMENT (RSC) CY 2,000.0000 2,080,000.00 241.030 482,060.00 867.220 1,734,440 036 DRILL AND BOND DOWEL LF 50.0000 49,500.00 297.000 14,850 037 PEDESTRIAN BARRICADE EA 5,000.0000 10,000.00 0.000 0 038 DETECTABLE WARNING SURFACE SQFT 46.0000 165,140.00 248.000 11,408 039 MINOR CONCRETE (CURB AND GUTTER) CY 1,230.0000 2,054,100.00 302.000 371,460 040 MINOR CONCRETE (SIDEWALK) CY 1,300.0000 832,000.00 52.000 67,600 041 PRE/POST CONSTRUCTION SURVEYS EA 700.0000 77,000.00 55.000 38,500 042 REMOVE AND REPLACE MONUMENT EA 1,700.0000 289,000.00 85.000 144,500 043 RELOCATE MAILBOX EA 500.0000 2,500.00 0.000 0 044 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.3000 37,290.00 0.000 0 045 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 54.0000 4,104.00 0.000 0 (0.063"-UNFRAMED) 046 PIPE HANDRAILING LF 370.0000 55,500.00 0.000 0 047 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 4.4000 242,000.00 0.000 0 WET NIGHT VISIBILITY) 048 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 192,500.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 049 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 40,480.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 3 DATE 01/24/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 12:07 PM ESTIMATE NO. 006 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 01/24/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 6" RUMBLE STRIP (ASPHALT CONCRETE STA 93.0000 3,720.00 0.000 0 PAVEMENT) 051 12" RUMBLE STRIP (ASPHALT CONCRETE STA 126.0000 23,940.00 0.000 0 PAVEMENT) 052 CAMERA SYSTEMS LS 240,000.0000 240,000.00 0.099 23,760 053 FIBER OPTIC CABLE SYSTEMS LS 5,100,000.0000 5,100,000.00 0.060 306,000.00 0.093 474,300 054 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,800,000.0000 1,800,000.00 0.126 226,800 055 MODIFYING TRAFFIC MONITORING STATIONS LS 40,000.0000 40,000.00 0.234 9,360 PROGRAM CAS145 PAGE 4 DATE 01/24/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 12:07 PM ESTIMATE NO. 006 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 01/24/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 925,836.10 4,332,131.94 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 105,960.64 105,960.64 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,031,796.74 4,438,092.58 056 MOBILIZATION LS 2,550,000.0000 2,550,000.00 0.750 1,912,500 ORIGINAL CONTRACT AMOUNT 33,595,143.00 TOTAL WORK COMPLETED 1,031,796.74 6,350,592.58 MATERIALS ON HAND ON SITE 116,719.11 116,719.11 DEDUCTIONS 0.00 0.00 TOTAL 1,148,515.85 6,467,311.69 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/28/23 270 07/24/23 07/24/23 02/04/25 101 21 90 0 17% 28% PROGRESS IS SATISFACTORY SANCHEZ, OMAR RESIDENT ENGINEER