PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/14/24 EST. NO. 012 TIME 02:40 PM R.E. NAME: SANCHEZ, OMAR 08-1H0604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0023 394.56 E.W. @ F.A.(+) 031924 N 331924 0024 394.56 032024 N 032024 0027 1,716.10 042924 N 742924 0028 3,811.86 042824 N 842824 002 0006 550.00 E.W. @ F.A.(+) 020124 N 121240 003 0014 6,070.27 E.W. @ F.A.(+) 011124 N 153445 004 0012 368,944.37 E.W. @ L.S.(+) 061124 N 012 0 381,881.72 TOTAL THIS ESTIMATE 1,518,236.32 TOTAL PREVIOUS ESTIMATE 1,900,118.04 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/14/24 EST. NO. 012 TIME 02:40 PM R.E. NAME: SANCHEZ, OMAR 08-1H0604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE REQUIRED CPM UPDATES -25,000.00 012 SSFPA PENALTY AAA -16,725.25 012 -41,725.25 -41,725.25 TOTAL DEDUCTIONS -41,725.25 -41,725.25 PROGRAM CAS145 PAGE 1 DATE 06/14/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 02:40 PM ESTIMATE NO. 012 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 06/14/24 LOCATION PROGRESS ESTIMATE 08-RIV-74-34.3/45.1 ----------------- GRIFFITH COMPANY RIVERSIDE COUNTY IN AND NEAR HEMET FROM 1128 CARRIER PARKWAY AVE WINCHESTER ROAD TO FAIRVIEW AVENUE BAKERSFIELD CA 93308 FED. AID NO. ACNH-P074(72)E FIBER OPTIC CABLE SYSTEMS, RHMA, HMA, AND ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 32,000.0000 32,000.00 1.000 32,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,300.0000 351,000.00 20.000 26,000.00 183.000 237,900 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 42,000.00 4.000 24,000 005 HOURLY OFF-SITE HR 230.0000 32,200.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 14,000.0000 14,000.00 0.074 1,036.00 0.678 9,492 007 CONSTRUCTION AREA SIGNS LS 63,000.0000 63,000.00 0.800 50,400 008 TRAFFIC CONTROL SYSTEM LS 1,100,000.0000 1,100,000.00 0.074 81,400.00 0.678 745,800 009 PORTABLE RADAR SPEED FEEDBACK SIGN EA 30.0000 16,200.00 46.000 1,380.00 310.000 9,300 SYSTEM DAY 010 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 40,000.0000 40,000.00 0.692 27,680 011 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 4,000.0000 16,000.00 2.000 8,000 012 JOB SITE MANAGEMENT LS 37,000.0000 37,000.00 0.074 2,738.00 0.678 25,086 013 PREPARE STORM WATER POLLUTION PREVENTION LS 2,500.0000 2,500.00 1.000 2,500 PLAN 014 STORM WATER ANNUAL REPORT EA 1,800.0000 3,600.00 0.000 0 015 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 6,400.00 16.000 6,400 016 TEMPORARY FIBER ROLL LF 3.4500 82,800.00 7,625.000 26,306 017 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 16,000.00 1.000 4,000 018 STREET SWEEPING LS 24,000.0000 24,000.00 0.074 1,776.00 0.678 16,272 019 TEMPORARY CONCRETE WASHOUT LS 6,000.0000 6,000.00 0.074 444.00 0.678 4,068 020 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 52,000.0000 52,000.00 0.074 3,848.00 0.678 35,256 021 REMOVE CONCRETE (SQYD) SQYD 31.0000 337,900.00 1,126.000 34,906.00 9,091.220 281,827 022 TEMPORARY HIGH-VISIBILITY FENCE LF 9.3000 30,969.00 1,665.000 15,484.50 1,665.000 15,484 PROGRAM CAS145 PAGE 2 DATE 06/14/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 02:40 PM ESTIMATE NO. 012 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 06/14/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEARING AND GRUBBING (LS) LS 30,000.0000 30,000.00 0.074 2,220.00 0.678 20,340 024 ROADWAY EXCAVATION CY 50.0000 189,500.00 1,825.000 91,250 025 SHOULDER BACKING TON 32.0000 38,720.00 0.000 0 026 ROCK BLANKET SQFT 24.5000 198,450.00 868.210 21,271.15 3,042.290 74,536 027 CLASS 2 AGGREGATE BASE (CY) CY 300.0000 390,000.00 84.460 25,338.00 1,215.620 364,686 028 REPLACE ASPHALT CONCRETE SURFACING CY 385.0000 2,310,000.00 5,060.380 1,948,246 029 PRIME COAT TON 1,000.0000 9,000.00 0.000 0 030 HOT MIX ASPHALT (TYPE A) TON 143.0000 4,390,100.00 82.530 11,801.79 988.850 141,405 031 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 144.0000 6,408,000.00 0.000 0 032 TACK COAT TON 900.0000 82,800.00 0.084 75 033 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 130.0000 92,300.00 85.000 11,050.00 563.500 73,255 034 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.8700 1,259,930.00 0.000 0 035 JOINTED PLAIN CONCRETE PAVEMENT (RSC) CY 2,000.0000 2,080,000.00 1,163.680 2,327,360 036 DRILL AND BOND DOWEL LF 50.0000 49,500.00 114.000 5,700.00 503.000 25,150 037 PEDESTRIAN BARRICADE EA 5,000.0000 10,000.00 2.000 10,000 038 DETECTABLE WARNING SURFACE SQFT 46.0000 165,140.00 549.620 25,282.52 2,049.180 94,262 039 MINOR CONCRETE (CURB AND GUTTER) CY 1,230.0000 2,054,100.00 137.140 168,682.20 1,131.730 1,392,027 040 MINOR CONCRETE (SIDEWALK) CY 1,300.0000 832,000.00 30.670 39,871.00 283.990 369,187 041 PRE/POST CONSTRUCTION SURVEYS EA 700.0000 77,000.00 77.000 53,900 042 REMOVE AND REPLACE MONUMENT EA 1,700.0000 289,000.00 86.000 146,200 043 RELOCATE MAILBOX EA 500.0000 2,500.00 0.000 0 044 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.3000 37,290.00 0.000 0 045 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 54.0000 4,104.00 0.000 0 (0.063"-UNFRAMED) 046 PIPE HANDRAILING LF 370.0000 55,500.00 27.210 10,067 047 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 4.4000 242,000.00 0.000 0 WET NIGHT VISIBILITY) 048 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 192,500.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 049 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 40,480.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 3 DATE 06/14/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 02:40 PM ESTIMATE NO. 012 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 06/14/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 6" RUMBLE STRIP (ASPHALT CONCRETE STA 93.0000 3,720.00 0.000 0 PAVEMENT) 051 12" RUMBLE STRIP (ASPHALT CONCRETE STA 126.0000 23,940.00 0.000 0 PAVEMENT) 052 CAMERA SYSTEMS LS 240,000.0000 240,000.00 0.356 85,440.00 0.668 160,320 053 FIBER OPTIC CABLE SYSTEMS LS 5,100,000.0000 5,100,000.00 0.123 627,300.00 0.555 2,830,500 054 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 1,800,000.0000 1,800,000.00 0.078 140,400.00 0.320 576,000 055 MODIFYING TRAFFIC MONITORING STATIONS LS 40,000.0000 40,000.00 0.234 9,360 PROGRAM CAS145 PAGE 4 DATE 06/14/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1H0604 TIME 02:40 PM ESTIMATE NO. 012 BID OPENING 12/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: SANCHEZ, OMAR DATE OF THIS ESTIMATE 06/14/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,333,369.16 12,281,902.01 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 381,881.72 1,900,118.04 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,715,250.88 14,182,020.05 056 MOBILIZATION LS 2,550,000.0000 2,550,000.00 0.950 2,422,500 ORIGINAL CONTRACT AMOUNT 33,595,143.00 TOTAL WORK COMPLETED 1,715,250.88 16,604,520.05 MATERIALS ON HAND ON SITE 32,500.00 209,336.27 DEDUCTIONS -41,725.25 -41,725.25 TOTAL 1,706,025.63 16,772,131.07 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/28/23 270 07/24/23 07/24/23 03/10/25 183 64 90 0 45% 51% PROGRESS IS SATISFACTORY SANCHEZ, OMAR RESIDENT ENGINEER