PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/16/25 EST. NO. 016 TIME 11:37 AM R.E. NAME: ALAM, MAHFUAL 08-1J2304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0013 1,413.68 E.W. @ F.A.(+) 041125 N 0013 0014 9,517.21 072624 N 0014 0015 3,004.26 052224 N 0015 002 0001 765.60 A.C. @ U.P.(+) 050625 N 0001 006 0002 2,000.00 A.C. @ U.P.(+) 060524 N 0002 0003 2,000.00 090524 N 0003 013 0011 693.29 E.W. @ F.A.(+) 112124 N 0011 018 0001 8,487.83 A.C. @ L.S.(+) 050625 N 0001 020 0009 38,632.96 E.W. @ F.A.(+) 072624 N 0009 021 0017 1,176.13 E.W. @ F.A.(+) 112224 N 0017 023 0002 22,818.23 E.W. @ L.S.(+) 051325 N 0002 024 0011 275.00 E.W. @ F.A.(+) 112024 N 0011 026 0003 10,328.68 E.W. @ F.A.(+) 011025 N 0003 0004 5,800.08 012425 N 0004 0007 12,558.27 021025 N 0007 028 0001 24,638.56 E.W. @ L.S.(+) 041025 N 0001 029 0001 14,224.80 A.C. @ L.S.(+) 051325 N 0001 030 0001 -22,818.23 A.C. @ L.S.(-) 051525 N 0001 135,516.35 TOTAL THIS ESTIMATE 738,321.75 TOTAL PREVIOUS ESTIMATE 873,838.10 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/16/25 EST. NO. 016 TIME 11:37 AM R.E. NAME: ALAM, MAHFUAL 08-1J2304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/16/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J2304 TIME 11:37 AM ESTIMATE NO. 016 BID OPENING 08/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 05/16/25 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 08-RIV-60-R1.0/12.0 ---------------------------------- POWELL CONSTRUCTORS INC RIVERSIDE COUNTY IN AND NEAR JURUPA VALLEY 8555 BANANA AVENUE AND RIVERSIDE AT VARIOUS LOCATIONS FROM FONTANA CA 92335 WINEVILLE ROAD UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 60/91 SEPARATION FED. AID NO. ACNH-P060(163)E RAMP METERING SYSTEM, HMA (TYPE A), RDWY E ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,200.0000 174,000.00 145.000 174,000 003 RENEWABLE DIESEL REPORT EA 500.0000 1,000.00 0.000 0 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 30,000.00 0.000 0 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 15,000.0000 15,000.00 1.000 15,000 007 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 1.000 25,000 008 TRAFFIC CONTROL SYSTEM LS 260,000.0000 260,000.00 1.000 260,000 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 200.0000 20,000.00 25.000 5,000 010 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5.0000 1,250.00 332.000 1,660 011 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.5000 29,400.00 22,198.000 33,297 012 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 5,400.00 152.000 6,840 013 PORTABLE RADAR SPEED FEEDBACK SIGN EA 40.0000 6,400.00 0.000 0 SYSTEM DAY 014 TEMPORARY PAVEMENT MARKER EA 4.0000 1,600.00 445.000 1,780 015 TEMPORARY BARRIER SYSTEM LF 28.0000 299,600.00 11,400.000 319,200 016 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 4,000.0000 4,000.00 1.000 4,000 017 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,000.0000 65,000.00 16.000 80,000 018 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 3,000.0000 48,000.00 17.000 51,000 019 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 1.000 25,000 020 PREPARE STORM WATER POLLUTION PREVENTION LS 2,500.0000 2,500.00 1.000 2,500 PLAN 021 RAIN EVENT ACTION PLAN EA 500.0000 19,500.00 0.000 0 022 STORM WATER SAMPLING AND ANALYSIS DAY EA 500.0000 13,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/16/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J2304 TIME 11:37 AM ESTIMATE NO. 016 BID OPENING 08/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 05/16/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 024 TEMPORARY SOIL BINDER SQYD 0.1000 1,200.00 0.000 0 025 TEMPORARY COVER SQYD 3.0000 3,000.00 200.000 600 026 TEMPORARY FIBER ROLL LF 4.0000 12,000.00 660.000 2,640 027 TEMPORARY GRAVEL BAG BERM LF 5.0000 10,000.00 400.000 2,000 028 TEMPORARY CONCRETE WASHOUT LS 8,000.0000 8,000.00 1.000 8,000 029 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 4.0000 16,800.00 4,287.000 17,148 STRIPE (HAZARDOUS WASTE) 030 TREATED WOOD WASTE LB 1.3000 3,250.00 1,400.000 1,820 031 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 18,000.0000 18,000.00 1.000 18,000 032 REMOVE CONCRETE (MISCELLANEOUS) (SQFT) SQFT 4.5000 71,550.00 16,327.320 73,472 033 CLEARING AND GRUBBING (LS) LS 15,000.0000 15,000.00 1.000 15,000 034 DUST PALLIATIVE LS 10,000.0000 10,000.00 1.000 10,000 035 ROADWAY EXCAVATION CY 95.0000 675,450.00 7,191.300 683,173 036 SHOULDER BACKING TON 140.0000 14,000.00 0.000 0 037 IMPORTED BORROW (CY) CY 1.0000 670.00 0.000 0 038 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS SQYD 6.0000 10,200.00 2,488.700 14,932 B2 039 ROCK BLANKET SQFT 22.0000 268,400.00 11,082.000 243,804 040 CHECK AND TEST EXISTING IRRIGATION LS 12,000.0000 12,000.00 1.000 12,000 FACILITIES 041 OPERATE EXISTING IRRIGATION FACILITIES LS 16,000.0000 16,000.00 1.000 16,000 042 REMOVE IRRIGATION FACILITY LS 8,000.0000 8,000.00 1.000 8,000 043 CONTROL AND NEUTRAL CONDUCTORS LS 21,000.0000 21,000.00 1.000 21,000 (ARMOR-CLAD) 044 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 85.0000 1,530.00 18.000 1,530 045 3" GATE VALVE EA 2,500.0000 15,000.00 6.000 15,000 046 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 12.5000 13,500.00 1,080.000 13,500 (F) LINE) 047 3" PLASTIC PIPE (CLASS 315) (SUPPLY LF 37.0000 6,660.00 180.000 6,660 (F) LINE) 048 12" WELDED STEEL PIPE CONDUIT LF 600.0000 48,000.00 60.000 36,000 049 HYDROMULCH SQFT 0.1300 5,733.00 44,100.000 5,733 PROGRAM CAS145 PAGE 3 DATE 05/16/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J2304 TIME 11:37 AM ESTIMATE NO. 016 BID OPENING 08/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 05/16/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CLASS 2 AGGREGATE BASE (CY) CY 140.0000 208,600.00 2,159.800 302,372 051 PRIME COAT TON 2,700.0000 43,200.00 7.150 19,305 052 HOT MIX ASPHALT (TYPE A) TON 161.0000 916,090.00 7,168.700 1,154,160 053 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 201.0000 301,500.00 2,612.940 525,200 054 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 3.0000 3,900.00 1,709.000 5,127 055 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 3.0000 840.00 247.000 741 056 PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 3.0000 8,580.00 2,743.000 8,229 057 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.0000 6,900.00 2,791.000 8,373 058 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 370.0000 31,450.00 65.000 24,050 AREA) 059 TACK COAT TON 2,800.0000 19,600.00 4.200 11,760 060 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 5.0000 3,000.00 680.000 3,400 061 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 10,040.00 5,375.170 10,750 062 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 9.0000 74,880.00 9,188.200 82,693 063 STRUCTURAL CONCRETE, HEADWALL CY 2,100.0000 12,600.00 2.000 4,200 (F) 064 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,500.0000 30,000.00 20.000 30,000 (F) 065 MINOR CONCRETE (MINOR STRUCTURE) CY 3,500.0000 7,000.00 2.000 7,000 (F) 066 12" REINFORCED CONCRETE PIPE LF 700.0000 1,400.00 2.000 1,400 067 18" REINFORCED CONCRETE PIPE LF 220.0000 16,280.00 16.600 3,652 068 24" REINFORCED CONCRETE PIPE LF 370.0000 11,840.00 48.000 17,760 069 REMOVE OVERSIDE DRAIN EA 700.0000 2,800.00 4.000 2,800 070 REMOVE CULVERT (LF) LF 90.0000 2,160.00 26.000 2,340 071 REMOVE INLET EA 1,200.0000 4,800.00 4.000 4,800 072 REMOVE HEADWALL EA 800.0000 800.00 1.000 800 073 DETECTABLE WARNING SURFACE SQFT 50.0000 6,000.00 120.000 6,000 074 MINOR CONCRETE (CURB AND GUTTER) CY 2,800.0000 33,600.00 17.300 48,440 075 MINOR CONCRETE (CURB, SIDEWALK AND CURB CY 1,700.0000 25,500.00 11.300 19,210 RAMP) 076 REMOVE CONCRETE CURB (LF) LF 15.0000 300.00 20.000 300 PROGRAM CAS145 PAGE 4 DATE 05/16/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J2304 TIME 11:37 AM ESTIMATE NO. 016 BID OPENING 08/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 05/16/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 REMOVE CONCRETE (CURB AND GUTTER) LF 20.0000 52,000.00 2,421.600 48,432 078 REMOVE CONCRETE (CURB, GUTTER, AND CY 360.0000 4,320.00 15.100 5,436 SIDEWALK) (CY) 079 PRE/POST CONSTRUCTION SURVEYS EA 2,500.0000 10,000.00 4.000 10,000 080 MISCELLANEOUS IRON AND STEEL LB 9.0000 12,168.00 1,615.000 14,535 (F) 081 REMOVE PAVEMENT MARKER EA 3.0000 810.00 435.000 1,305 082 DELINEATOR (CLASS 1) EA 70.0000 3,920.00 52.000 3,640 083 GUARD RAILING DELINEATOR EA 35.0000 3,850.00 110.000 3,850 084 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 1,850.00 375.000 1,875 085 MARKER (CULVERT) EA 200.0000 600.00 3.000 600 086 TREATMENT BEST MANAGEMENT PRACTICE EA 250.0000 500.00 2.000 500 MARKER 087 REMOVE ROADSIDE SIGN EA 70.0000 700.00 10.000 700 088 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 5,170.00 399.000 4,389 (0.080"-UNFRAMED) 089 ROADSIDE SIGN - ONE POST EA 470.0000 4,700.00 10.000 4,700 090 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 270.0000 11,880.00 44.000 11,880 METHOD) 091 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 38.5000 102,025.00 2,550.000 98,175 092 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 50.0000 13,500.00 270.000 13,500 093 VEGETATION CONTROL (MINOR CONCRETE) SQYD 85.0000 68,850.00 1,135.420 96,510 094 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,250.0000 9,000.00 3.000 6,750 095 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,000.0000 12,000.00 3.000 12,000 096 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 8.0000 32,080.00 2,908.000 23,264 WET NIGHT VISIBILITY) 097 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 22,200.00 15,800.000 23,700 (ENHANCED WET NIGHT VISIBILITY) 098 12" THERMOPLASTIC TRAFFIC STRIPE LF 4.0000 14,320.00 3,130.000 12,520 (ENHANCED WET NIGHT VISIBILITY) 099 REMOVE PAINTED TRAFFIC STRIPE LF 0.8000 15,680.00 13,906.000 11,124 100 REMOVE PAINTED PAVEMENT MARKING SQFT 1.7500 437.50 93.000 162 101 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 10,562.50 8,492.000 10,615 102 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 1,350.00 281.000 1,405 103 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,500.0000 3,500.00 1.000 3,500 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 5 DATE 05/16/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J2304 TIME 11:37 AM ESTIMATE NO. 016 BID OPENING 08/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 05/16/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 RAMP METERING SYSTEM LS 1,070,000.0000 1,070,000.00 1.000 1,070,000 105 CAMERA SYSTEMS LS 34,500.0000 34,500.00 1.000 34,500 106 MODIFYING LIGHTING SYSTEMS LS 20,300.0000 20,300.00 1.000 20,300 107 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 746,000.0000 746,000.00 1.000 746,000 108 MODIFYING RAMP METERING SYSTEMS LS 116,000.0000 116,000.00 1.000 116,000 109 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 110 FIBER OPTIC CABLE SYSTEMS LS 150,500.0000 150,500.00 1.000 150,500 111 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 112 REMOVE GUARDRAIL LF 13.0000 975.00 75.000 975 PROGRAM CAS145 PAGE 6 DATE 05/16/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J2304 TIME 11:37 AM ESTIMATE NO. 016 BID OPENING 08/23/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 05/16/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 7,101,999.67 ADJUSTMENT OF COMPENSATION 4,660.00 83,396.27 EXTRA WORK 130,856.35 790,441.83 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 135,516.35 7,975,837.77 113 MOBILIZATION LS 679,215.0000 679,215.00 1.000 679,215 ORIGINAL CONTRACT AMOUNT 7,363,716.00 TOTAL WORK COMPLETED 135,516.35 8,655,052.77 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 135,516.35 8,655,052.77 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/16/23 145 02/12/24 02/12/24 03/21/25 145 130 0 0 100% 100% ALAM, MAHFUAL RESIDENT ENGINEER