PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/20/25 EST. NO. 001 TIME 03:00 PM R.E. NAME: RAHMAN, MD 08-1J4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/20/25 EST. NO. 001 TIME 03:00 PM R.E. NAME: RAHMAN, MD 08-1J4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J4504 TIME 03:00 PM ESTIMATE NO. 001 BID OPENING 01/08/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: RAHMAN, MD DATE OF THIS ESTIMATE 08/20/25 LOCATION PROGRESS ESTIMATE 08-RIV-243-0.0/29.7 ----------------- ALL AMERICAN ASPHALT RIVERSIDE COUNTY FROM ROUTE 74 AT MOUNTAIN 400 EAST SIXTH STREET CENTER TO ROUTE 10 IN BANNING CORONA CA 92879 FED. AID NO. ACST-S243(2)E HMA, THERMOPLASTIC TRAFFIC STRIPE, AND COL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.800 2,400.00 0.800 2,400 002 TIME-RELATED OVERHEAD (WDAY) WDAY 2,300.0000 690,000.00 18.000 41,400.00 18.000 41,400 003 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 30,000.00 0.000 0 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 88,000.0000 88,000.00 0.500 44,000.00 0.500 44,000 006 TRAFFIC CONTROL SYSTEM LS 1,200,000.0000 1,200,000.00 0.060 72,000.00 0.060 72,000 007 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,700.0000 76,500.00 0.000 0 008 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 44.0000 26,400.00 36.000 1,584.00 36.000 1,584 SYSTEM 009 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 44,000.0000 44,000.00 0.000 0 010 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 14,000.0000 154,000.00 8.000 112,000.00 8.000 112,000 011 JOB SITE MANAGEMENT LS 218,000.0000 218,000.00 0.060 13,080.00 0.060 13,080 012 STORMWATER POLLUTION PREVENTION PLAN LS 3,200.0000 3,200.00 0.060 192.00 0.060 192 013 STORM WATER SAMPLING AND ANALYSIS DAY EA 430.0000 14,190.00 0.000 0 014 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 015 TEMPORARY HYDROSEED SQYD 0.9000 90,000.00 0.000 0 016 TEMPORARY SOIL BINDER SQYD 0.3000 2,190.00 0.000 0 017 TEMPORARY DRAINAGE INLET PROTECTION EA 283.0000 4,245.00 0.000 0 018 TEMPORARY FIBER ROLL LF 8.0000 16,000.00 0.000 0 019 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 0.000 0 020 TREATED WOOD WASTE LB 0.8000 78,240.00 0.000 0 021 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 269,000.0000 269,000.00 0.060 16,140.00 0.060 16,140 022 TEMPORARY HIGH-VISIBILITY FENCE LF 8.0000 28,480.00 2,734.000 21,872.00 2,734.000 21,872 PROGRAM CAS145 PAGE 2 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J4504 TIME 03:00 PM ESTIMATE NO. 001 BID OPENING 01/08/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: RAHMAN, MD DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADWAY EXCAVATION CY 850.0000 2,210.00 0.000 0 024 SHOULDER BACKING TON 100.0000 128,000.00 0.000 0 025 GEOSYNTHETIC REINFORCEMENT SQYD 155.0000 136,400.00 0.000 0 026 ROADSIDE CLEARING LS 1,100,000.0000 1,100,000.00 0.500 550,000.00 0.500 550,000 027 PRUNE EXISTING PLANTS LS 38,000.0000 38,000.00 0.500 19,000.00 0.500 19,000 028 ORGANIC FERTILIZER LB 11.0000 66.00 0.000 0 029 PLANT (GROUP H) EA 82.0000 2,952.00 0.000 0 030 PLANT (GROUP O) EA 82.0000 3,444.00 0.000 0 031 TRANSPLANT TREE EA 2,500.0000 12,500.00 0.000 0 032 PLANT ESTABLISHMENT WORK LS 56,800.0000 56,800.00 0.000 0 033 WOOD MULCH CY 220.0000 1,100.00 0.000 0 034 TEMPORARY IRRIGATION SYSTEM LS 25,000.0000 25,000.00 0.000 0 035 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2,200.0000 22,000.00 0.000 0 036 BONDED FIBER MATRIX (SQFT) SQFT 0.1600 28,960.00 0.000 0 037 CLASS 2 AGGREGATE BASE (CY) CY 220.0000 66,000.00 0.000 0 038 REPLACE ASPHALT CONCRETE SURFACING CY 430.0000 120,400.00 0.000 0 039 PRIME COAT TON 4,700.0000 4,700.00 0.000 0 040 HOT MIX ASPHALT (TYPE A) TON 138.0000 5,823,600.00 0.000 0 041 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 2.7000 52,920.00 0.000 0 042 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 2.7000 1,674.00 0.000 0 043 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 2.7000 2,349.00 0.000 0 044 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 2.7000 3,024.00 0.000 0 045 TACK COAT TON 620.0000 74,400.00 0.000 0 046 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 9.3000 138,570.00 0.000 0 047 REMOVE ASPHALT CONCRETE DIKE LF 2.0000 44,400.00 0.000 0 048 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.8000 969,000.00 0.000 0 049 STRUCTURAL CONCRETE, HEADWALL CY 2,730.0000 324,870.00 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J4504 TIME 03:00 PM ESTIMATE NO. 001 BID OPENING 01/08/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: RAHMAN, MD DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 STRUCTURAL CONCRETE, DRAINAGE INLET CY 2,460.0000 177,120.00 0.000 0 (F) 051 MINOR CONCRETE CY 2,460.0000 295,200.00 0.000 0 (F) 052 MINOR CONCRETE (MINOR STRUCTURE) CY 3,550.0000 21,300.00 0.000 0 (F) 053 CONCRETE BACKFILL (PIPE TRENCH) CY 600.0000 15,000.00 0.000 0 (F) 054 18" CORRUGATED STEEL PIPE (.109" THICK) LF 290.0000 124,700.00 0.000 0 055 24" CORRUGATED STEEL PIPE (.138" THICK) LF 310.0000 65,100.00 0.000 0 056 36" CORRUGATED STEEL PIPE (.168" THICK) LF 450.0000 355,500.00 0.000 0 057 42" CORRUGATED STEEL PIPE (.138" THICK) LF 530.0000 169,600.00 0.000 0 058 36" CORRUGATED STEEL PIPE INLET (.138" LF 290.0000 17,690.00 0.000 0 THICK) 059 18" STEEL FLARED END SECTION EA 6,600.0000 13,200.00 0.000 0 060 24" STEEL FLARED END SECTION EA 9,300.0000 37,200.00 0.000 0 061 36" STEEL FLARED END SECTION EA 10,300.0000 92,700.00 0.000 0 062 42" STEEL FLARED END SECTION EA 10,900.0000 43,600.00 0.000 0 063 ABANDON CULVERT (LF) LF 98.0000 16,660.00 0.000 0 064 REMOVE CULVERT (LF) LF 98.0000 125,440.00 0.000 0 065 REMOVE INLET EA 5,500.0000 16,500.00 0.000 0 066 CLEANING, INSPECTING, AND PREPARING LF 210.0000 42,000.00 0.000 0 CULVERT (LF) 067 ROCK SLOPE PROTECTION (20 LB, CLASS I, CY 710.0000 71,000.00 0.000 0 METHOD B) (CY) 068 ROCK SLOPE PROTECTION (1/2 T, CLASS VII, CY 930.0000 41,850.00 0.000 0 METHOD B) (CY) 069 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 60.0000 21,600.00 0.000 0 070 MINOR CONCRETE (CURB) (CY) CY 38,000.0000 11,400.00 0.000 0 071 DETECTABLE WARNING SURFACE SQFT 60.0000 1,080.00 0.000 0 072 MINOR CONCRETE (CURB, SIDEWALK AND CURB CY 3,500.0000 21,000.00 0.000 0 RAMP) 073 REMOVE CONCRETE CURB AND SIDEWALK (SQYD) SQYD 250.0000 8,750.00 0.000 0 074 PRE/POST CONSTRUCTION SURVEYS EA 10,000.0000 10,000.00 0.000 0 075 MISCELLANEOUS IRON AND STEEL LB 5.5000 11,682.00 0.000 0 (F) 076 REMOVE PAVEMENT MARKER EA 2.5000 14,400.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J4504 TIME 03:00 PM ESTIMATE NO. 001 BID OPENING 01/08/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: RAHMAN, MD DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 REMOVE DELINEATOR EA 38.0000 22,800.00 0.000 0 078 DELINEATOR (CLASS 1) EA 224.0000 11,648.00 0.000 0 079 GUARD RAILING DELINEATOR EA 57.0000 34,200.00 0.000 0 080 PAVEMENT MARKER EA 13.0000 74,880.00 0.000 0 (RETROREFLECTIVE-RECESSED) 081 MARKER (CULVERT) EA 325.0000 20,150.00 0.000 0 082 OBJECT MARKER (TYPE P) EA 390.0000 1,560.00 0.000 0 083 FURNISH LAMINATED PANEL SIGN (2 SQFT 48.0000 20,640.00 0.000 0 1/2"-TYPE B) 084 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.0000 35,000.00 0.000 0 (0.080"-UNFRAMED) 085 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 31.0000 10,540.00 0.000 0 (0.063"-FRAMED) 086 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 32.0000 8,320.00 0.000 0 (0.080"-FRAMED) 087 ROADSIDE SIGN - ONE POST EA 405.0000 20,250.00 0.000 0 088 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 180.0000 59,400.00 0.000 0 POST 089 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 93.0000 4,650.00 0.000 0 090 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 51.0000 215,220.00 0.000 0 091 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 481.0000 490,620.00 0.000 0 (EMBEDDED IN ROCK) 092 CABLE RAILING LF 82.0000 23,370.00 0.000 0 (F) 093 TRANSITION RAILING (TYPE AGT) EA 5,580.0000 11,160.00 0.000 0 094 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 5,410.0000 281,320.00 0.000 0 095 BURIED POST END ANCHOR (TYPE B-F) EA 3,280.0000 9,840.00 0.000 0 096 REMOVE GUARDRAIL LF 9.0000 64,260.00 0.000 0 097 12" RUMBLE STRIP (ASPHALT CONCRETE STA 380.0000 13,300.00 0.000 0 PAVEMENT) 098 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.3000 648,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (RECESSED) 099 8" THERMOPLASTIC TRAFFIC STRIPE LF 132.0000 6,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (RECESSED) 100 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 38.0000 87,400.00 0.000 0 WET NIGHT VISIBILITY) (RECESSED) 101 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 875.0000 875.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 102 TRAFFIC MONITORING STATION SYSTEM LS 53,000.0000 53,000.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J4504 TIME 03:00 PM ESTIMATE NO. 001 BID OPENING 01/08/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: RAHMAN, MD DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 103 REMOVING TRAFFIC MONITORING STATIONS LS 3,300.0000 3,300.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 08/20/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1J4504 TIME 03:00 PM ESTIMATE NO. 001 BID OPENING 01/08/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: RAHMAN, MD DATE OF THIS ESTIMATE 08/20/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 893,668.00 893,668.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 893,668.00 893,668.00 104 MOBILIZATION LS 597,000.0000 597,000.00 0.500 298,500.00 0.500 298,500 ORIGINAL CONTRACT AMOUNT 16,898,959.00 TOTAL WORK COMPLETED 1,192,168.00 1,192,168.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,192,168.00 1,192,168.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/23/25 550 07/24/25 07/24/25 10/25/27 18 2 6 0 7% 3% PROGRESS IS SATISFACTORY RAHMAN, MD RESIDENT ENGINEER