PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/23/26 EST. NO. 001 TIME 10:43 AM R.E. NAME: ST.JACQUES, MICHAEL 08-1L1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/23/26 EST. NO. 001 TIME 10:43 AM R.E. NAME: ST.JACQUES, MICHAEL 08-1L1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1L1804 TIME 10:43 AM ESTIMATE NO. 001 BID OPENING 08/06/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/26 R.E. NAME: ST.JACQUES, MICHAEL DATE OF THIS ESTIMATE 02/23/26 LOCATION PROGRESS ESTIMATE 08-RIV-91-13.5/16.8 ----------------- GRANITE CONSTRUCTION COMPANY RIVERSIDE COUNTY IN RIVERSIDE FROM 0.6 PO BOX 742478 MILE WEST OF VAN BUREN BOULEVARD LOS ANGELES CA 90074-2478 OVERCROSSING TO 0.2 MILE EAST OF MADISON STREET UNDERCROSSING. FED. AID NO. ACNH-P091(162)E JPCP (RSC), INDIVIDUAL SLAB REPLACEMENT (R ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,300.0000 1,300.00 1.000 1,300.00 1.000 1,300 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 5,000.0000 5,000.00 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,500.0000 700,000.00 22.000 77,000.00 22.000 77,000 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 24,000.00 0.000 0 005 HOURLY OFF-SITE HR 200.0000 4,000.00 0.000 0 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 55,500.0000 55,500.00 0.770 42,735.00 0.770 42,735 007 TRAFFIC CONTROL SYSTEM LS 1,261,500.0000 1,261,500.00 0.100 126,150.00 0.100 126,150 008 TRAFFIC CONTROL SUPERVISOR DAY 1,750.0000 70,000.00 3.000 5,250.00 3.000 5,250 009 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 883.3900 441,695.00 5.000 4,416.95 5.000 4,416 010 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 3.5000 294.00 0.000 0 011 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.0000 7,500.00 3,774.000 3,774.00 3,774.000 3,774 012 CHANNELIZER (SURFACE MOUNTED) EA 96.0000 66,240.00 186.000 17,856.00 186.000 17,856 013 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 85.0000 90,100.00 12.000 1,020.00 12.000 1,020 SYSTEM 014 TEMPORARY PAVEMENT MARKER EA 10.0000 1,300.00 35.000 350.00 35.000 350 015 TEMPORARY BARRIER SYSTEM (MASH TL-3) LF 39.2900 553,989.00 3,920.000 154,016.80 3,920.000 154,016 016 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 15,088.0000 15,088.00 0.000 0 017 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 9,500.0000 237,500.00 10.000 95,000.00 10.000 95,000 018 TEMPORARY AUTOMATED END OF QUEUE WARNING DAY 180.0000 43,200.00 0.000 0 SYSTEM (TYPE 1) 019 END OF QUEUE MONITORING AND WARNING WITH DAY 2,600.0000 26,000.00 0.000 0 TRUCK MOUNTED CHANGEABLE MESSAGE SIGN 020 TEMPORARY CRASH CUSHION MODULE EA 14,974.0000 74,870.00 1.000 14,974.00 1.000 14,974 021 TEMPORARY CRASH CUSHION TL-2 EA 15,192.0000 60,768.00 1.000 15,192.00 1.000 15,192 022 TEMPORARY CRASH CUSHION TL-3 EA 7,646.0000 76,460.00 9.000 68,814.00 9.000 68,814 PROGRAM CAS145 PAGE 2 DATE 02/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1L1804 TIME 10:43 AM ESTIMATE NO. 001 BID OPENING 08/06/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/26 R.E. NAME: ST.JACQUES, MICHAEL DATE OF THIS ESTIMATE 02/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY RADAR SPEED FEEDBACK SIGN EA 7,989.0000 31,956.00 2.000 15,978.00 2.000 15,978 SYSTEM 024 JOB SITE MANAGEMENT LS 349,700.0000 349,700.00 0.100 34,970.00 0.100 34,970 025 STORMWATER POLLUTION PREVENTION PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500 026 STORMWATER ANNUAL REPORT EA 3,000.0000 6,000.00 0.000 0 027 TEMPORARY SOIL BINDER SQYD 0.6600 3,960.00 0.000 0 028 TEMPORARY COVER SQYD 6.0000 6,000.00 0.000 0 029 TEMPORARY DRAINAGE INLET PROTECTION EA 902.5000 9,025.00 0.000 0 030 TEMPORARY FIBER ROLL LF 6.3000 31,500.00 0.000 0 031 TEMPORARY CONSTRUCTION ENTRANCE EA 4,582.0000 18,328.00 0.000 0 032 TEMPORARY CONCRETE WASHOUT LS 2,282.0000 2,282.00 0.000 0 033 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.3000 10,470.00 0.000 0 STRIPE (HAZARDOUS WASTE) 034 TREATED WOOD WASTE LB 0.5000 33,250.00 0.000 0 035 NOISE MONITORING LS 49,057.0000 49,057.00 0.000 0 036 REMOVE CONCRETE (CY) CY 8,647.0000 69,176.00 0.000 0 037 CLEARING AND GRUBBING (LS) LS 10,077.0000 10,077.00 0.000 0 038 ROADWAY EXCAVATION CY 170.0000 338,300.00 0.000 0 039 ROCK BLANKET SQFT 197.0000 7,880.00 0.000 0 040 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 2,000.0000 6,000.00 0.000 0 041 HYDROSEED SQFT 0.1800 6,480.00 0.000 0 042 CLASS 2 AGGREGATE BASE (CY) CY 426.0000 12,354.00 0.000 0 043 LEAN CONCRETE BASE RAPID SETTING CY 668.5000 1,163,190.00 0.000 0 044 REPLACE BASE CY 363.5000 432,565.00 0.000 0 045 BASE BOND BREAKER SQYD 6.9000 121,440.00 0.000 0 046 REPLACE ASPHALT CONCRETE SURFACING CY 540.4000 405,300.00 0.000 0 047 PRIME COAT TON 204.0000 18,156.00 0.000 0 048 HOT MIX ASPHALT (TYPE A) TON 527.5000 84,400.00 0.000 0 049 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 247.0000 1,795,690.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 02/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1L1804 TIME 10:43 AM ESTIMATE NO. 001 BID OPENING 08/06/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/26 R.E. NAME: ST.JACQUES, MICHAEL DATE OF THIS ESTIMATE 02/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 11.8700 8,309.00 0.000 0 051 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 11.9000 2,023.00 0.000 0 052 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 11.9000 26,537.00 0.000 0 053 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 95.0000 3,515.00 0.000 0 AREA) 054 TACK COAT TON 5,225.0000 62,700.00 0.000 0 055 REMOVE ASPHALT CONCRETE DIKE LF 2.5400 8,128.00 0.000 0 056 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 6.3900 357,201.00 0.000 0 057 JOINTED PLAIN CONCRETE PAVEMENT (RSC) CY 500.0000 1,540,000.00 0.000 0 058 DRILL AND BOND (DOWEL BAR) EA 32.0000 194,560.00 0.000 0 059 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,173.0000 2,498,490.00 0.000 0 060 ISOLATION JOINT SEAL (SILICONE) LF 6.0000 78,600.00 0.000 0 061 REMOVE CONCRETE PAVEMENT AND BASE CY 54.6000 158,886.00 0.000 0 062 GRIND EXISTING CONCRETE PAVEMENT SQYD 4.4100 1,053,990.00 0.000 0 063 STRUCTURAL CONCRETE, DRAINAGE INLET CY 9,790.0000 9,790.00 0.000 0 (F) 064 MINOR CONCRETE (MINOR STRUCTURE) CY 2,703.0000 143,259.00 0.000 0 (F) 065 REMOVE CULVERT (LF) LF 420.0000 1,092.00 0.000 0 066 REMOVE INLET EA 2,500.0000 2,500.00 0.000 0 067 ROCK SLOPE PROTECTION (150 LB, CLASS CY 830.0000 12,450.00 0.000 0 III, METHOD B) (CY) 068 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 98.0000 1,372.00 0.000 0 069 MINOR CONCRETE (CURB) (CY) CY 2,950.0000 23,600.00 0.000 0 070 MINOR CONCRETE (GUTTER) (CY) CY 612.0000 14,688.00 0.000 0 071 DETECTABLE WARNING SURFACE SQFT 72.0000 1,296.00 0.000 0 072 MINOR CONCRETE (CURB RAMP) CY 3,500.0000 5,950.00 0.000 0 073 REMOVE CONCRETE (CURB, GUTTER, AND CY 997.0000 42,871.00 0.000 0 SIDEWALK) (CY) 074 MISCELLANEOUS IRON AND STEEL LB 7.5000 2,445.00 0.000 0 (F) 075 REMOVE PAVEMENT MARKER EA 0.5000 2,825.00 175.000 87.50 175.000 87 076 DELINEATOR (CLASS 1) EA 75.0000 1,500.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 02/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1L1804 TIME 10:43 AM ESTIMATE NO. 001 BID OPENING 08/06/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/26 R.E. NAME: ST.JACQUES, MICHAEL DATE OF THIS ESTIMATE 02/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 GUARD RAILING DELINEATOR EA 40.0000 5,200.00 0.000 0 078 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 31,120.00 0.000 0 079 TREATMENT BEST MANAGEMENT PRACTICE EA 250.0000 1,000.00 0.000 0 MARKER 080 REMOVE ROADSIDE SIGN EA 350.0000 350.00 0.000 0 081 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 200.00 0.000 0 (0.063"-UNFRAMED) 082 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 55.0000 880.00 0.000 0 (0.080"-UNFRAMED) 083 ROADSIDE SIGN - ONE POST EA 350.0000 700.00 0.000 0 084 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 52.0000 100,880.00 0.000 0 085 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 63.7000 107,016.00 0.000 0 086 VEGETATION CONTROL (MINOR CONCRETE) SQYD 156.0000 268,320.00 0.000 0 087 DOUBLE MIDWEST GUARDRAIL SYSTEM (STEEL LF 69.0000 6,072.00 0.000 0 POST) 088 CONCRETE BARRIER (TYPE 60MSF MODIFIED) LF 463.0000 83,340.00 0.000 0 089 TRANSITION RAILING (TYPE AGT) EA 5,800.0000 46,400.00 0.000 0 090 DOUBLE TRANSITION RAILING (TYPE AGT) EA 7,800.0000 7,800.00 0.000 0 091 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,052.0000 10,260.00 0.000 0 092 END ANCHOR ASSEMBLY (TYPE CA) EA 1,500.0000 1,500.00 0.000 0 093 ALTERNATIVE CRASH CUSHION TL-2 EA 28,000.0000 56,000.00 0.000 0 094 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 5,400.0000 64,800.00 0.000 0 095 ALTERNATIVE CRASH CUSHION TL-3 EA 33,970.0000 67,940.00 0.000 0 096 ALTERNATIVE MEDIAN TERMINAL TL-3 EA 18,760.0000 18,760.00 0.000 0 097 CONCRETE BARRIER (TYPE 60MS) LF 473.0000 132,440.00 0.000 0 098 CONCRETE BARRIER TRANSITION LF 549.0000 62,037.00 0.000 0 (F) 099 REMOVE GUARDRAIL LF 11.7000 51,831.00 288.000 3,369.60 288.000 3,369 100 REMOVE CONCRETE BARRIER LF 77.0000 28,490.00 0.000 0 101 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 5.0000 67,000.00 0.000 0 WET NIGHT VISIBILITY) 102 PREFORMED THERMOPLASTIC PAVEMENT MARKING SQFT 25.0000 10,750.00 0.000 0 103 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 96,400.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 5 DATE 02/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1L1804 TIME 10:43 AM ESTIMATE NO. 001 BID OPENING 08/06/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/26 R.E. NAME: ST.JACQUES, MICHAEL DATE OF THIS ESTIMATE 02/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 3,480.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 105 12" THERMOPLASTIC TRAFFIC STRIPE LF 2.1000 24,150.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 106 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 11,760.00 4,372.000 874.40 4,372.000 874 107 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 2,880.00 265.000 530.00 265.000 530 108 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 40,400.00 0.000 0 (WARRANTY) (BROKEN 12-3) 109 CONTRAST STRIPE PAINT (1-COAT) LF 0.3000 19,830.00 0.000 0 110 REMOVE 6" TRAFFIC STRIPE LF 0.2000 24,800.00 0.000 0 111 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.2500 185,625.00 0.000 0 (WARRANTY) (BROKEN 36-12) 112 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 15.0000 26,700.00 0.000 0 (WARRANTY) 113 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 145,600.00 0.000 0 (WARRANTY) (BROKEN 36-12) 114 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 115 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 27,500.0000 27,500.00 0.000 0 116 MODIFYING RAMP METERING SYSTEMS LS 27,500.0000 27,500.00 0.000 0 117 MODIFYING TRAFFIC MONITORING STATIONS LS 101,750.0000 101,750.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 02/23/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1L1804 TIME 10:43 AM ESTIMATE NO. 001 BID OPENING 08/06/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/26 R.E. NAME: ST.JACQUES, MICHAEL DATE OF THIS ESTIMATE 02/23/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 686,158.25 686,158.25 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 686,158.25 686,158.25 118 MOBILIZATION LS 332,200.0000 332,200.00 0.000 0 ORIGINAL CONTRACT AMOUNT 17,403,078.00 TOTAL WORK COMPLETED 686,158.25 686,158.25 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 686,158.25 686,158.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/10/25 200 01/20/26 01/20/26 11/03/26 22 0 0 0 4% 11% PROGRESS IS SATISFACTORY ST.JACQUES, MICHAEL RESIDENT ENGINEER