PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/17/26 EST. NO. 001 TIME 08:05 AM R.E. NAME: ALAM, MAHFUAL 08-1R4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/17/26 EST. NO. 001 TIME 08:05 AM R.E. NAME: ALAM, MAHFUAL 08-1R4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1R4004 TIME 08:05 AM ESTIMATE NO. 001 BID OPENING 05/28/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 09/17/26 LOCATION PROGRESS ESTIMATE 08-SBD-210-R32.8 ----------------- CT&T CONCRETE PAVING, INC. SAN BERNARDINO COUNTY IN REDLANDS AT 324 S. DIAMOND BAR BLVD, PMB LUGONIA AVENUE UNDERCROSSING DIAMOND BAR CA 91765 FED. AID NO. N O N E MINOR CONC (SW & MINOR STRUCTURE) AND CHAI ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.800 1,600.00 0.800 1,600 002 TIME-RELATED OVERHEAD (WDAY) WDAY 400.0000 10,000.00 12.000 4,800.00 12.000 4,800 003 CONSTRUCTION AREA SIGNS LS 12,500.0000 12,500.00 0.750 9,375.00 0.750 9,375 004 TRAFFIC CONTROL SYSTEM LS 60,000.0000 60,000.00 0.500 30,000.00 0.500 30,000 005 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 100.0000 2,500.00 0.000 0 SYSTEM 006 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 4,200.0000 4,200.00 0.500 2,100.00 0.500 2,100 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 1,100.0000 4,400.00 2.000 2,200.00 2.000 2,200 008 JOB SITE MANAGEMENT LS 7,500.0000 7,500.00 0.500 3,750.00 0.500 3,750 009 WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 0.800 2,000.00 0.800 2,000 010 TEMPORARY SOIL BINDER SQYD 3.5000 1,750.00 0.000 0 011 TEMPORARY DRAINAGE INLET PROTECTION EA 650.0000 650.00 1.000 650.00 1.000 650 012 TEMPORARY FIBER ROLL LF 3.5000 1,750.00 500.000 1,750.00 500.000 1,750 013 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500 014 TREATED WOOD WASTE LB 5.0000 700.00 0.000 0 015 REMOVE CONCRETE (MISCELLANEOUS) (SQFT) SQFT 27.0000 4,050.00 71.500 1,930.50 71.500 1,930 016 CLEARING AND GRUBBING (LS) LS 9,000.0000 9,000.00 0.800 7,200.00 0.800 7,200 017 ROADWAY EXCAVATION CY 135.0000 6,750.00 50.000 6,750.00 50.000 6,750 018 DITCH EXCAVATION CY 2,000.0000 2,000.00 0.000 0 019 RELOCATE WATER METER EA 35,000.0000 35,000.00 0.250 8,750.00 0.250 8,750 020 BONDED FIBER MATRIX (SQFT) SQFT 1.0000 1,580.00 0.000 0 021 MINOR CONCRETE (MINOR STRUCTURE) CY 2,300.0000 34,500.00 0.000 0 (F) 022 4" PLASTIC PIPE UNDERDRAIN LF 190.0000 2,280.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1R4004 TIME 08:05 AM ESTIMATE NO. 001 BID OPENING 05/28/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 09/17/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ADJUST FRAME AND COVER TO GRADE EA 600.0000 1,800.00 0.000 0 024 CONCRETE (DITCH LINING) CY 1,800.0000 1,800.00 0.000 0 025 MINOR CONCRETE (CURB AND GUTTER) CY 700.0000 10,500.00 0.000 0 026 MINOR CONCRETE (SIDEWALK) CY 800.0000 40,000.00 0.000 0 027 REMOVE CONCRETE (CURB AND GUTTER) LF 60.0000 9,000.00 135.000 8,100.00 135.000 8,100 028 CHAIN LINK FENCE (TYPE CL-6) LF 50.0000 27,500.00 0.000 0 029 12' CHAIN LINK GATE (TYPE CL-6) EA 3,000.0000 6,000.00 0.000 0 030 REMOVE CHAIN LINK FENCE LF 10.0000 5,500.00 550.000 5,500.00 550.000 5,500 031 REMOVE ROADSIDE SIGN EA 700.0000 700.00 0.000 0 032 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 270.00 0.000 0 (0.080"-UNFRAMED) 033 ROADSIDE SIGN - ONE POST EA 1,500.0000 1,500.00 0.000 0 034 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 36.0000 2,268.00 0.000 0 WET NIGHT VISIBILITY) 035 REMOVE PAVEMENT MARKING SQFT 16.0000 1,008.00 0.000 0 036 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 12,000.0000 12,000.00 0.500 6,000.00 0.500 6,000 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 09/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1R4004 TIME 08:05 AM ESTIMATE NO. 001 BID OPENING 05/28/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/26 R.E. NAME: ALAM, MAHFUAL DATE OF THIS ESTIMATE 09/17/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 104,955.50 104,955.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 104,955.50 104,955.50 ORIGINAL CONTRACT AMOUNT 330,456.00 TOTAL WORK COMPLETED 104,955.50 104,955.50 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 104,955.50 104,955.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/20/26 25 08/24/26 08/24/26 10/07/26 12 7 0 0 32% 48% PROGRESS IS SATISFACTORY ALAM, MAHFUAL RESIDENT ENGINEER