PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/22/26 EST. NO. 001 TIME 01:16 PM R.E. NAME: VU, KHOI 08-1R6904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/22/26 EST. NO. 001 TIME 01:16 PM R.E. NAME: VU, KHOI 08-1R6904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1R6904 TIME 01:16 PM ESTIMATE NO. 001 BID OPENING 05/28/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 10/22/26 LOCATION PROGRESS ESTIMATE 08-RIV-111-55.3/R63.3 ----------------- AMERICAN PAVEMENT SYSTEMS, RIVERSIDE COUNTY IN AND NEAR PALM SPRINGS INC. FROM GATEWAY DRIVE TO ROUTE 10/111 1012 11TH STREET, SUITE 1000 SEPARATION MODESTO CA 95354 FED. AID NO. N O N E PRECOATED AGGREGATE, ASPHALT-RUBBER BINDER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 4,500.0000 202,500.00 21.000 94,500.00 21.000 94,500 003 CONSTRUCTION AREA SIGNS LS 36,586.0000 36,586.00 0.500 18,293.00 0.500 18,293 004 TRAFFIC CONTROL SYSTEM LS 652,000.0000 652,000.00 0.500 326,000.00 0.500 326,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 300.0000 13,500.00 14.000 4,200.00 14.000 4,200 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 300.0000 13,500.00 13.000 3,900.00 13.000 3,900 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,000.0000 20,000.00 2.000 10,000.00 2.000 10,000 008 JOB SITE MANAGEMENT LS 25,000.0000 25,000.00 0.500 12,500.00 0.500 12,500 009 WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500 010 SAND COVER (SEAL) TON 100.0000 65,000.00 0.000 0 011 ASPHALT-RUBBER BINDER TON 650.0000 526,500.00 0.000 0 012 ASPHALTIC EMULSION (FLUSH COAT) TON 1,000.0000 82,000.00 0.000 0 013 CRACK TREATMENT LNMI 5,800.0000 185,600.00 29.000 168,200.00 29.000 168,200 014 PRECOATED AGGREGATE (SEAL COAT) TON 54.0000 305,640.00 0.000 0 015 REPLACE ASPHALT CONCRETE SURFACING CY 1,250.0000 80,000.00 0.000 0 016 REMOVE PAVEMENT MARKER EA 0.5000 930.00 1,846.000 923.00 1,846.000 923 017 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 5,580.00 0.000 0 018 OBJECT MARKER (TYPE P) EA 500.0000 500.00 0.000 0 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 24.5000 5,635.00 0.000 0 (0.080"-UNFRAMED) 020 ROADSIDE SIGN - TWO POST EA 1,375.0000 24,750.00 0.000 0 021 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 5.0000 15,750.00 0.000 0 WET NIGHT VISIBILITY) 022 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 2,460.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 2 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1R6904 TIME 01:16 PM ESTIMATE NO. 001 BID OPENING 05/28/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 10/22/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3600 31,176.00 86,750.000 31,230.00 86,750.000 31,230 024 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.5000 4,725.00 3,130.000 4,695.00 3,130.000 4,695 025 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.8000 238,000.00 0.000 0 (WARRANTY) (BROKEN 17-7) 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.500 500.00 0.500 500 SYSTEM ELEMENTS DURING CONSTRUCTION 027 INDUCTIVE LOOP DETECTOR (LS) LS 12,000.0000 12,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/22/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-1R6904 TIME 01:16 PM ESTIMATE NO. 001 BID OPENING 05/28/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/26 R.E. NAME: VU, KHOI DATE OF THIS ESTIMATE 10/22/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 679,941.00 679,941.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 679,941.00 679,941.00 ORIGINAL CONTRACT AMOUNT 2,557,832.00 TOTAL WORK COMPLETED 679,941.00 679,941.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 679,941.00 679,941.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/01/26 45 09/21/26 09/21/26 11/24/26 21 0 0 0 27% 47% PROGRESS IS SATISFACTORY VU, KHOI RESIDENT ENGINEER