PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/06 EST. NO.02 TIME 05:08 PM R.E. NAME: KAWWA, JABRA 08-354804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 433.99 E.W. @ F.A.(+) 042006 N 0001.0 0002 209.59 051506 N 0002.0 0003 242.79 051606 N 0003.0 0004 165.83 051706 N 0004.0 1,052.20 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 1,052.20 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/06 EST. NO.02 TIME 05:08 PM R.E. NAME: KAWWA, JABRA 08-354804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 LOCATION RERUN PROGRESS ESTIMATE 08-RIV-60-R0.5/7.5 ----------------------- YEAGER SKANSKA INC. IN RIVERSIDE COUNTY AT GLEN AVON MR. JON P. HADLEY FROM ROUTE 15 AND 60 SEPARATION TO 1995 AGUA MANSA ROAD VALLEY WAY UNDERCROSSING RIVERSIDE, CA 92509 FED. AID NO. ACNH-P060(123)E ,CMLN-6208(8) WIDEN HIGHWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH) LS 5,625.0000 5,625.00 0.000 0.00 02 TIME-RELATED OVERHEAD LS 1488,000.0000 1,488,000.00 0.051 75,888.00 0.062 92,256.00 03 TEMPORARY FENCE (TYPE CL-1.8) M 30.0000 11,400.00 0.000 0.00 04 PREPARE STORM WATER POLLUTION LS 11,475.0000 11,475.00 0.750 8,606.25 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 60,750.0000 60,750.00 0.030 1,822.50 0.060 3,645.00 06 CONSTRUCTION AREA SIGNS LS 135,000.0000 135,000.00 0.200 27,000.00 0.400 54,000.00 S) 07 TRAFFIC CONTROL SYSTEM LS 400,000.0000 400,000.00 0.050 20,000.00 0.060 24,000.00 S) 08 FLASHING ARROW SIGN EA 10,000.0000 100,000.00 0.050 500.00 S) 09 TYPE II BARRICADE EA 25.0000 4,500.00 0.000 0.00 S) 10 TYPE III BARRICADE EA 115.0000 920.00 1.500 172.50 1.500 172.50 S) 11 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 32,900.00 42.000 1,470.00 42.000 1,470.00 12 PORTABLE CHANGEABLE MESSAGE SIGN EA 20,000.0000 200,000.00 0.050 1,000.00 S) 13 TEMPORARY RAILING (TYPE K) M 30.0000 435,000.00 6,181.000 185,430.00 6,181.000 185,430.00 14 TEMPORARY CRASH CUSHION MODULE EA 300.0000 81,000.00 80.000 24,000.00 80.000 24,000.00 S) 15 TEMPORARY TRAFFIC SCREEN M 7.0000 172,200.00 0.000 0.00 S) 16 ABANDON CULVERT EA 2,000.0000 2,000.00 0.000 0.00 17 REMOVE CHAIN LINK FENCE M 20.0000 9,000.00 0.000 0.00 18 REMOVE METAL BEAM GUARD RAILING M 48.0000 87,840.00 185.000 8,880.00 185.000 8,880.00 19 REMOVE YELLOW PAINTED TRAFFIC STRIPE M 1.5000 41,250.00 0.000 0.00 AND PAVEMENT MARKING 20 REMOVE PAINTED TRAFFIC STRIPE M 1.5000 85,350.00 0.000 0.00 21 REMOVE PAINTED PAVEMENT MARKING M2 16.0000 768.00 2.000 32.00 2.000 32.00 22 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 1.5000 88,650.00 33,718.000 50,577.00 33,718.000 50,577.00 PROGRAM CAS145 PAGE 2 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE PAVEMENT MARKER EA 1.0000 39,000.00 10,831.000 10,831.00 11,298.000 11,298.00 24 REMOVE CHANNELIZERS EA 11.0000 627.00 8.000 88.00 8.000 88.00 25 REMOVE ROADSIDE SIGN EA 125.0000 1,750.00 0.000 0.00 26 REMOVE ROADSIDE SIGN (WOOD POST) EA 175.0000 1,225.00 0.000 0.00 27 REMOVE ROADSIDE SIGN PANEL EA 110.0000 220.00 0.000 0.00 28 REMOVE SIGN STRUCTURE EA 5,000.0000 50,000.00 0.000 0.00 29 RECONSTRUCT SIGN STRUCTURE, (LOCATION A) LS 8,000.0000 8,000.00 0.000 0.00 30 RECONSTRUCT SIGN STRUCTURE, (LOCATION B) LS 7,500.0000 7,500.00 0.000 0.00 31 REMOVE ASPHALT CONCRETE DIKE M 0.5000 3,250.00 0.000 0.00 32 REMOVE PIPE M 40.0000 7,200.00 0.000 0.00 33 REMOVE INLET EA 1,600.0000 35,200.00 0.000 0.00 34 RELOCATE CONCRETE BARRIER (TYPE K) M 30.0000 303,000.00 6,285.000 188,550.00 6,285.000 188,550.00 35 MODIFY INLET EA 3,000.0000 108,000.00 0.000 0.00 36 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.6000 154,700.00 0.000 0.00 37 REMOVE CONCRETE M3 175.0000 5,775.00 0.000 0.00 38 CAP INLET EA 1,000.0000 19,000.00 18.000 18,000.00 18.000 18,000.00 39 REMOVE BARRIER RAILING M 180.0000 55,800.00 0.000 0.00 40 REMOVE BRIDGE RAILING M 50.0000 27,000.00 0.000 0.00 41 BRIDGE REMOVAL (PORTION), LOCATION A LS 17,800.0000 17,800.00 0.000 0.00 42 BRIDGE REMOVAL (PORTION), LOCATION B LS 50,700.0000 50,700.00 0.000 0.00 43 BRIDGE REMOVAL (PORTION), LOCATION C LS 20,400.0000 20,400.00 0.000 0.00 44 BRIDGE REMOVAL (PORTION), LOCATION D LS 5,900.0000 5,900.00 0.000 0.00 45 BRIDGE REMOVAL (PORTION), LOCATION E LS 34,200.0000 34,200.00 0.000 0.00 46 BRIDGE REMOVAL (PORTION), LOCATION F LS 14,600.0000 14,600.00 0.750 10,950.00 0.750 10,950.00 47 BRIDGE REMOVAL (PORTION), LOCATION G LS 19,600.0000 19,600.00 0.050 980.00 0.050 980.00 48 BRIDGE REMOVAL (PORTION), LOCATION H LS 15,500.0000 15,500.00 0.750 11,625.00 0.750 11,625.00 49 CLEARING AND GRUBBING LS 20,250.0000 20,250.00 0.100 2,025.00 0.100 2,025.00 PROGRAM CAS145 PAGE 3 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 DEVELOP WATER SUPPLY LS 14,580.0000 14,580.00 0.050 729.00 0.100 1,458.00 51 ROADWAY EXCAVATION M3 18.0000 693,000.00 700.000 12,600.00 52 LEAD COMPLIANCE PLAN LS 3,726.0000 3,726.00 0.000 0.00 53 STRUCTURE EXCAVATION (BRIDGE) M3 270.0000 561,870.00 300.000 81,000.00 300.000 81,000.00 54 STRUCTURE EXCAVATION (RETAINING WALL) M3 25.0000 18,000.00 0.000 0.00 55 STRUCTURE BACKFILL (BRIDGE) M3 90.0000 118,710.00 0.000 0.00 56 STRUCTURE BACKFILL (RETAINING WALL) M3 98.0000 24,500.00 0.000 0.00 57 SOIL ANCHOR M 120.0000 243,240.00 0.000 0.00 S) 58 HIGHWAY PLANTING LS 18,000.0000 18,000.00 0.000 0.00 S) 59 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 60 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 61 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 62 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 63 STABILIZING EMULSION (EROSION CONTROL) KG 50.0000 7,500.00 0.000 0.00 S) 64 PLANT ESTABLISHMENT WORK LS 15,000.0000 15,000.00 0.000 0.00 S) 65 IRRIGATION SYSTEM LS 275,000.0000 275,000.00 0.000 0.00 S) 66 200 MM CORRUGATED HIGH DENSITY M 300.0000 12,000.00 0.000 0.00 S) POLYETHYLENE PIPE CONDUIT 67 250 MM WELDED STEEL PIPE CONDUIT M 300.0000 4,500.00 0.000 0.00 S) (6.35 MM THICK) 68 AGGREGATE BASE (APPROACH SLAB) M3 200.0000 6,800.00 0.000 0.00 69 LEAN CONCRETE BASE M3 154.0000 3,927,000.00 0.000 0.00 70 ASPHALT CONCRETE (TYPE A) TONN 86.0000 1,324,400.00 3,443.160 296,111.76 5,203.000 447,458.00 71 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 3.5000 10,780.00 0.000 0.00 72 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 3.5000 1,575.00 0.000 0.00 73 CONCRETE PAVEMENT M3 205.0000 10,024,500.00 0.000 0.00 74 SEAL PAVEMENT JOINT M 2.6000 247,000.00 0.000 0.00 75 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 5,850.00 0.000 0.00 (BROKEN 3.66M - 0.9M) 76 GRIND EXISTING CONCRETE M2 7.0000 139,300.00 14,538.000 101,766.00 19,900.000 139,300.00 S) PAVEMENT PROGRAM CAS145 PAGE 4 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 425.0000 178,500.00 0.000 0.00 S) PILING 78 FURNISH PILING (CLASS 625) M 105.0000 65,310.00 0.000 0.00 79 DRIVE PILE (CLASS 625) EA 1,160.0000 90,480.00 0.000 0.00 S) 80 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 135.0000 2,187,000.00 0.000 0.00 S) PILING (BARRIER) 81 PRESTRESSING CAST-IN-PLACE CONCRETE LS 525,000.0000 525,000.00 0.000 0.00 S) 82 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 580.0000 154,280.00 0.000 0.00 F) 83 STRUCTURAL CONCRETE, BRIDGE M3 890.0000 4,198,130.00 0.000 0.00 F) 84 STRUCTURAL CONCRETE, RETAINING WALL M3 575.0000 235,750.00 0.000 0.00 85 STRUCTURAL CONCRETE, BARRIER SLAB M3 400.0000 179,600.00 0.000 0.00 F) 86 STRUCTURAL CONCRETE, APPROACH SLAB M3 715.0000 578,435.00 0.000 0.00 F) (TYPE N) 87 STRUCTURAL CONCRETE, APPROACH SLAB M3 975.0000 320,775.00 0.000 0.00 (TYPE R) 88 MINOR CONCRETE (MINOR STRUCTURE) M3 1,700.0000 51,000.00 0.000 0.00 89 PAVING NOTCH EXTENSION M3 1,100.0000 16,500.00 0.000 0.00 90 DRILL AND BOND DOWEL M 40.0000 8,480.00 0.000 0.00 91 CLEAN EXPANSION JOINT M 65.0000 24,310.00 0.000 0.00 92 SOUND WALL (BARRIER) (MASONRY BLOCK) M2 177.0000 3,453,447.00 0.000 0.00 93 SOUND WALL (MASONRY BLOCK) M2 195.0000 286,650.00 0.000 0.00 94 PTFE BEARING EA 1,000.0000 16,000.00 0.000 0.00 S) 95 JOINT SEAL (TYPE AL) M 150.0000 6,750.00 0.000 0.00 S) 96 JOINT SEAL (MR 15 MM) M 200.0000 54,200.00 0.000 0.00 S) 97 JOINT SEAL (MR 40 MM) M 350.0000 35,700.00 0.000 0.00 S) 98 JOINT SEAL (MR 50 MM) M 325.0000 148,850.00 0.000 0.00 S) 99 BAR REINFORCING STEEL KG 1.5000 54,225.00 0.000 0.00 SF) 00 BAR REINFORCING STEEL (BRIDGE) KG 1.8000 1,187,262.00 0.000 0.00 SF) 01 HEADED BAR REINFORCEMENT EA 10.0000 400.00 0.000 0.00 SF) 02 FURNISH SIGN STRUCTURE (TRUSS) KG 10.0000 957,200.00 0.000 0.00 F) 03 INSTALL SIGN STRUCTURE (TRUSS) KG 1.0000 95,720.00 0.000 0.00 SF) PROGRAM CAS145 PAGE 5 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 760 MM CAST-IN-DRILLED-HOLE M 750.0000 24,000.00 0.000 0.00 S) CONCRETE PILE (SIGN FOUNDATION) 05 920 MM CAST-IN-DRILLED-HOLE M 2,400.0000 240,000.00 0.000 0.00 S) CONCRETE PILE (SIGN FOUNDATION) 06 METAL (BARRIER MOUNTED SIGN) KG 15.0000 46,650.00 0.000 0.00 07 ROADSIDE SIGN - ONE POST EA 500.0000 1,000.00 0.000 0.00 08 ROADSIDE SIGN - TWO POST EA 1,250.0000 1,250.00 0.000 0.00 09 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 225.0000 2,250.00 0.000 0.00 METHOD) 10 INSTALL SIGN OVERLAY M2 1,000.0000 5,000.00 0.000 0.00 11 INSTALL SIGN PANEL ON EXISTING FRAME M2 55.0000 3,190.00 0.000 0.00 12 450 MM ALTERNATIVE PIPE CULVERT M 215.0000 113,950.00 0.000 0.00 13 JACKED 450 MM REINFORCED CONCRETE PIPE M 2,200.0000 39,600.00 0.000 0.00 (CLASS II) 14 300 MM CORRUGATED STEEL PIPE DOWNDRAIN M 81.0000 1,215.00 0.000 0.00 (2.01 MM THICK) 15 300 MM ENTRANCE TAPER EA 545.0000 1,635.00 0.000 0.00 16 450 MM CORRUGATED STEEL PIPE RISER M 550.0000 4,950.00 0.000 0.00 (2.01 MM THICK) 17 450 MM ALTERNATIVE FLARED END SECTION EA 1,250.0000 6,250.00 0.000 0.00 18 ROCK SLOPE PROTECTION M3 540.0000 2,700.00 0.000 0.00 (BACKING NO. 1, METHOD B) 19 SLOPE PAVING (CONCRETE) M3 900.0000 108,900.00 0.000 0.00 F) 20 ROCK SLOPE PROTECTION FABRIC (TYPE A) M2 15.0000 375.00 0.000 0.00 21 MINOR CONCRETE (MISCELLANEOUS M3 1,300.0000 29,900.00 0.000 0.00 CONSTRUCTION) 22 MISCELLANEOUS IRON AND STEEL KG 4.5000 85,635.00 0.000 0.00 SF) 23 CHAIN LINK FENCE (TYPE CL-1.8) M 110.0000 2,640.00 0.000 0.00 24 TRANSITION RAILING (TYPE WB) EA 4,500.0000 58,500.00 0.000 0.00 S) 25 METAL BEAM GUARD RAILING (WOOD POST) M 95.0000 33,250.00 0.000 0.00 S) 26 CHAIN LINK RAILING (TYPE 7L) M 210.0000 25,200.00 0.000 0.00 SF) 27 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,000.0000 36,000.00 0.000 0.00 S) 28 CONCRETE BARRIER (TYPE 736) M 320.0000 1,558,400.00 0.000 0.00 29 CONCRETE BARRIER (TYPE 60G) M 210.0000 1,045,800.00 0.000 0.00 30 CONCRETE BARRIER (TYPE 60GA MODIFIED) M 355.0000 20,235.00 0.000 0.00 F) PROGRAM CAS145 PAGE 6 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 CONCRETE BARRIER (TYPE 60GA) M 350.0000 178,500.00 0.000 0.00 F) 32 CONCRETE BARRIER (TYPE 60GC) M 415.0000 1,025,050.00 0.000 0.00 33 CONCRETE BARRIER (TYPE 60GE) M 600.0000 102,000.00 0.000 0.00 34 CONCRETE BARRIER (TYPE 732R) M 310.0000 242,730.00 0.000 0.00 F) 35 CONCRETE BARRIER (TYPE 60GW MODIFY) M 670.0000 1,567,800.00 0.000 0.00 36 CONCRETE BARRIER (TYPE 736 MODIFIED) M 145.0000 99,615.00 0.000 0.00 F) 37 CONCRETE BARRIER (TYPE 736R MODIFIED) M 315.0000 64,260.00 0.000 0.00 F) 38 THERMOPLASTIC PAVEMENT MARKING M2 35.0000 12,950.00 0.000 0.00 S) 39 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 110,500.00 0.000 0.00 S) 40 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.8000 3,060.00 0.000 0.00 S) 41 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 6,300.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 42 PAINT TRAFFIC STRIPE (2-COAT) M 0.4500 58,050.00 27,227.000 12,252.15 27,227.000 12,252.15 S) 43 PAINT PAVEMENT MARKING (2-COAT) M2 15.0000 975.00 14.680 220.20 14.680 220.20 S) 44 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2500 42,500.00 7,564.000 9,455.00 7,564.000 9,455.00 S) 45 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.7500 58,300.00 2,492.000 6,853.00 2,492.000 6,853.00 S) 46 PAVEMENT MARKER EA 25.0000 7,500.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) 47 SPRINKLER CONTROL CONDUIT (BRIDGE) M 50.0000 27,500.00 0.000 0.00 S) 48 TRAFFIC MONITORING STATION (LOCATION 1) LS 50,000.0000 50,000.00 0.000 0.00 S) 49 TRAFFIC MONITORING STATION (LOCATION 2) LS 50,000.0000 50,000.00 0.000 0.00 S) 50 MODIFY LIGHTING AND SIGN ILLUMINATION LS 1000,000.0000 1,000,000.00 0.000 0.00 S) 51 FIBER OPTIC SYSTEM LS 1300,000.0000 1,300,000.00 0.000 0.00 S) 52 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 53 MAINTAIN EXISTING PLANTING LS 150,000.0000 150,000.00 0.000 0.00 54 MAINTAIN EXISTING IRRIGATION LS 50,000.0000 50,000.00 0.000 0.00 55 SEAL LONGITUDINAL ISOLATION M 7.0000 139,300.00 7,960.000 55,720.00 7,960.000 55,720.00 56 JOINT REPAIR SPALLED JOINTS M2 7.0000 1,400.00 0.000 0.00 57 600 MM CAST-IN-DRILLED-HOLE CONCRETE M 165.0000 2,475.00 0.000 0.00 PILING PROGRAM CAS145 PAGE 7 DATE 05/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-354804 TIME 05:08 PM ESTIMATE NO. 02 BID OPENING 01/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/19/06 R.E. NAME: KAWWA, JABRA DATE OF THIS ESTIMATE 05/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,202,428.11 1,464,401.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 1,052.20 1,052.20 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,203,480.31 1,465,453.30 58 MOBILIZATION LS 4500,000.0000 4,500,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 51,635,850.00 TOTAL WORK COMPLETED 1,203,480.31 1,465,453.30 MATERIALS ON HAND ON SITE 470,000.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,203,480.31 1,935,453.30 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/17/06 370 04/10/06 04/03/06 10/10/07 23 12 0 0 3% 9% PROGRESS IS SATISFACTORY KAWWA, JABRA RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 05/24/06