PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/01/04 EST. NO.32 TIME 03:32 PM R.E. NAME: FRAYWAT, NABIL 08-3555U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0147 1,034.38 E.W. @ F.A.(+) 020603 N 0554.0 0616 127.48 050504 N 2608.0 0617 187.25 050404 N 2609.0 0618 443.00 121302 N 2660.0 0619 500.53 120803 N 1979.0 0620 720.35 122903 N 2017.0 0621 2,636.79 020604 N 2146.0 0622 876.95 020404 N 2324.0 0623 250.40 030304 N 2340.0 0624 1,080.21 032204 N 2400.0 0625 145.49 040204 N 2433.0 0626 257.04 040104 N 2434.0 0627 259.23 033104 N 2440.0 0628 439.92 040904 N 2467.0 0629 345.09 041304 N 2476.0 0630 973.57 042204 N 2522.0 0631 1,301.37 042604 N 2535.0 002 0021 1,662.50 E.W. @ F.A.(+) 010804 N 1948.0 0029 1,037.50 052204 N 2593.0 0030 1,100.00 060104 N 2606.0 0031 662.50 061404 N 2668.0 0032 1,162.50 061404 N 2669.0 0033 1,287.50 032604 N 2291.0 0034 600.00 042804 N 2529.0 0035 600.00 042804 N 2568.0 003 0026 32,726.70 E.W. @ F.A.(+) 061104 N 2670.0 006 1138 170.54 E.W. @ F.A.(+) 050404 N 2612.0 1139 174.58 050604 N 2614.0 1140 174.62 050404 N 2616.0 1141 174.62 050504 N 2617.0 1142 174.62 050304 N 2618.0 1143 174.62 050304 N 2619.0 1144 174.62 050404 N 2620.0 1145 174.62 050504 N 2621.0 1146 174.62 050604 N 2622.0 1147 174.62 050704 N 2623.0 1148 174.62 050604 N 2625.0 1149 340.74 052604 N 2626.0 1150 174.62 052504 N 2627.0 1151 340.74 052504 N 2628.0 1152 174.62 052404 N 2629.0 1153 346.23 022504 N 2314.0 1154 2,666.16 050404 N 2573.0 1155 215.67 051004 N 2576.0 1156 174.62 051004 N 2577.0 1157 174.62 051104 N 2578.0 1158 174.62 051104 N 2579.0 1159 340.74 051204 N 2580.0 1160 174.62 051204 N 2581.0 1161 174.62 051404 N 2582.0 1162 340.74 051404 N 2583.0 PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 2 DATE 07/01/04 EST. NO.32 TIME 03:32 PM R.E. NAME: FRAYWAT, NABIL 08-3555U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 1163 340.74 051304 N 2584.0 1164 174.62 051304 N 2585.0 1165 1,495.00 081603 N 1112.0 1166 19.83 081203 N 1115.0 1167 410.46 080103 N 1116.0 1168 1,495.00 071903 N 1128.0 1169 406.09 062103 N 1172.0 020 0071 750.00 E.W. @ U.P (+) 070903 N 1540.0 031 0005 1,236.25 E.W. @ F.A.(+) 033004 N 2607.0 059 0012 492.82 A.C. @ F.A.(+) 071503 N 1276.0 0013 579.52 071603 N 1278.0 0014 685.02 071803 N 1321.0 0015 535.61 072103 N 1381.0 0016 524.04 072203 N 1396.0 69,293.31 TOTAL THIS ESTIMATE 3,432,035.03 TOTAL PREVIOUS ESTIMATE 3,501,328.34 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/01/04 EST. NO.32 TIME 03:32 PM R.E. NAME: FRAYWAT, NABIL 08-3555U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE A/C OUT OF SPEC -592.31 02 SWPPP NON-COMPLIANCE -584,111.92 06 ITEM NO. 113 -1,200.00 07 SWPPP NON-COMPLIANCE 584,111.92 07 REQUEST FOR STAKING -22,500.00 11 SWPPP NON-COMPLIANCE -1,150,558.00 11 TEST STRIP DENSITY -3,530.90 11 SWPPP NON COMPLIANCE 1,150,558.00 12 INADEQUATE LCB -965.25 15 OUT OF STATE INSPECT -5,000.00 15 PCCP DEFICIENCIES -19,886.23 18 SURVEY RESTAKING -3,600.00 18 SWPPP -1,377,603.50 18 PCCP DEFICIENCIES -3,867.84 19 ASPHALT GRADING -1,150.50 21 SWPPP 1,377,603.50 22 AB OUT OF COMPLIANCE -1,200.00 23 PCCP THICKNESS DEFIC -11,793.87 23 SWPPP VIOLATION -624,757.57 23 SWPPP VIOLATION 624,757.57 24 SURVEY RESTAKING -5,512.50 30 SWPPP NON-COMPLIANCE -744,277.70 30 SWPPP NON-COMPLIANCE 744,277.70 31 0.00 -80,799.40 LABOR COMPLIANCE VIOLATION PAYROLL DISCREPANCY -10,000.00 08 PAYROLL DISCREPANCY 10,000.00 09 MISSING DOCUMENTS -10,000.00 19 MISSING PAYROLLS -10,000.00 21 MISSING DOCUMENTS 20,000.00 23 MISSING DOCUMENTS -10,000.00 25 MISSING DOCUMENTS 10,000.00 26 MISSING DOCUMENTS -4,000.00 27 MISSING DOCUMENTS -10,000.00 28 MISSING DOC. EST 27 3,000.00 28 MISSING DOCUMENTS -10,000.00 29 MISS DOC PART PE #29 9,000.00 30 MISSING DOCUMENTS -6,000.00 30 MISSING DOC. PE #28 10,000.00 30 MISSING DOCUMENTS -5,000.00 31 PART RELEASE PE 30 5,000.00 31 0.00 -8,000.00 TOTAL DEDUCTIONS 0.00 -88,799.40 PROGRAM CAS145 PAGE 1 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 08-SBD-15-41.9/70.6 ------------------------------ E L YEAGER CONSTRUCTION IN SAN BERNARDINO COUNTY IN AND COMPANY INC NEAR VICTORVILLE, APPLE VALLEY AND P O BOX 87 BARSTOW AT VARIOUS LOCATIONS RIVERSIDE CA 925020087 FED. AID NO. ACIM-015 -1(215)145,ACNH-015 -1(215)N ,I-015 -1(215)N WIDEN ROADWAY AND BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 22,500.0000 22,500.00 0.750 16,875.00 02 TEMPORARY TORTOISE FENCE M 8.5000 5,100.00 5,468.500 46,482.25 03 TEMPORARY FENCE (TYPE CL-1.8) M 24.0000 53,520.00 1,172.300 28,135.20 04 PREPARE STORM WATER POLLUTION LS 10,000.0000 10,000.00 0.750 7,500.00 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 125,000.0000 125,000.00 0.570 71,250.00 06 CONSTRUCTION AREA SIGN (1-POST) EA 185.0000 79,550.00 569.220 105,305.70 S) 07 CONSTRUCTION AREA SIGN (2-POST) EA 575.0000 57,500.00 52.770 30,342.75 S) 08 TRAFFIC CONTROL SYSTEM LS 400,000.0000 400,000.00 0.760 304,000.00 S) 09 TYPE III BARRICADE EA 75.0000 24,000.00 236.000 17,700.00 S) 10 TEMPORARY PAVEMENT MARKING (PAINT) M2 20.0000 1,580.00 162.970 3,259.40 S) 11 TEMPORARY TRAFFIC STRIPE (TAPE) M 3.5000 157,500.00 80,527.000 281,844.50 S) 12 TEMPORARY TRAFFIC STRIPE (PAINT) M 0.5000 148,000.00 426,664.000 213,332.00 S) 13 CHANNELIZER (SURFACE MOUNTED) EA 26.0000 117,000.00 4,411.000 114,686.00 S) 14 CHANNELIZER (SURFACE MOUNTED) EA 26.0000 20,800.00 0.000 0.00 S) (LEFT IN PLACE) 15 FLASHING BEACON (PORTABLE) EA 1,000.0000 7,000.00 4.770 4,770.00 S) 16 TEMPORARY PAVEMENT MARKER EA 2.5000 173,000.00 79,159.000 197,897.50 S) 17 PORTABLE CHANGEABLE MESSAGE SIGN EA 15,000.0000 135,000.00 7.600 114,000.00 S) 18 TEMPORARY RAILING (TYPE K) M 15.0000 2,010,000.00 137,644.062 2,064,660.93 S) 19 TEMPORARY CRASH CUSHION MODULE EA 200.0000 90,000.00 624.000 124,800.00 S) 20 TEMPORARY TRAFFIC SCREEN M 5.0000 845,000.00 148,592.000 742,960.00 S) 21 ABANDON CULVERT M 14.0000 22,820.00 452.300 6,332.20 22 OBLITERATE SURFACING M2 2.0000 614,000.00 5,955.000 11,910.00 PROGRAM CAS145 PAGE 2 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE FENCE (TYPE BW AND TYPE WM) M 1.7500 79,100.00 69,066.800 120,866.90 24 REMOVE CHAIN LINK FENCE M 3.0000 3,030.00 1,128.400 3,385.20 25 REMOVE YELLOW PAINTED TRAFFIC STRIPE M 1.7000 121,210.00 18,402.000 31,283.40 26 REMOVE YELLOW PAINTED PAVEMENT MARKING M2 20.0000 2,000.00 0.000 0.00 27 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 1.7000 36,040.00 9,743.000 16,563.10 STRIPE 28 REMOVE PAINTED TRAFFIC STRIPE M 1.1500 124,200.00 82,583.000 94,970.45 29 REMOVE PAINTED PAVEMENT MARKING M2 12.0000 6,000.00 182.700 2,192.40 30 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 15.0000 3,000.00 44.400 666.00 31 REMOVE PAVEMENT MARKER EA 0.5000 22,050.00 32,052.000 16,026.00 32 REMOVE ROADSIDE SIGN (WOOD POST) EA 100.0000 4,700.00 17.000 1,700.00 33 REMOVE SIGN STRUCTURE EA 3,000.0000 12,000.00 3.000 9,000.00 34 REMOVE ASPHALT CONCRETE DIKE M 5.0000 1,350.00 1,076.000 5,380.00 35 REMOVE CULVERT M 20.0000 162,800.00 7,431.400 148,628.00 36 REMOVE INLET EA 400.0000 48,000.00 81.300 32,520.00 37 REMOVE HEADWALL EA 600.0000 162,000.00 213.000 127,800.00 38 REMOVE CONCRETE PAVEMENT M3 18.0000 153,720.00 8,383.000 150,894.00 39 REMOVE ASPHALT CONCRETE SURFACING M2 5.0000 22,650.00 3,435.360 17,176.80 40 REMOVE CONCRETE DECK SURFACE M2 30.0000 60,000.00 1,887.250 56,617.50 41 SALVAGE METAL BEAM GUARD RAILING M 17.0000 7,310.00 655.180 11,138.06 42 RECONSTRUCT WOOD FENCE M 60.0000 8,400.00 112.500 6,750.00 43 RECONSTRUCT FENCE (TYPE BW) M 4.5000 108,450.00 0.000 0.00 44 RECONSTRUCT FENCE (TYPE WM) M 6.5000 10,270.00 0.000 0.00 45 RECONSTRUCT CHAIN LINK FENCE M 34.0000 17,340.00 25.000 850.00 46 RESET MILEPOST MARKER EA 20.0000 5,200.00 0.000 0.00 47 RESET OBJECT MARKER EA 20.0000 1,800.00 0.000 0.00 48 RESET ROADSIDE SIGN (ONE POST) EA 150.0000 7,800.00 65.000 9,750.00 49 RESET ROADSIDE SIGN (TWO POST) EA 500.0000 22,000.00 25.000 12,500.00 PROGRAM CAS145 PAGE 3 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 RESET OVERHEAD SIGN PANEL EA 500.0000 1,500.00 3.000 1,500.00 51 RESET SURVEY MONUMENT EA 175.0000 22,750.00 0.000 0.00 52 RELOCATE CONCRETE BARRIER (TYPE K) M 8.0000 328,800.00 34,506.000 276,048.00 53 RELOCATE ROADSIDE SIGN-ONE POST EA 150.0000 9,900.00 44.000 6,600.00 54 RELOCATE ROADSIDE SIGN-TWO POST EA 500.0000 5,500.00 7.000 3,500.00 55 RELOCATED OVERHEAD SIGN PANEL EA 1,500.0000 1,500.00 1.000 1,500.00 56 RELOCATE SIGN STRUCTURE EA 3,000.0000 12,000.00 3.000 9,000.00 57 MODIFY INLET EA 2,000.0000 50,000.00 2.000 4,000.00 58 MODIFY DROP STRUCTURE LS 3,600.0000 3,600.00 1.000 3,600.00 59 COLD PLAN ASPHALT CONCRETE PAVEMENT M2 1.7500 572,250.00 337,424.720 590,493.26 S) (100 MM, MAXIMUM) 60 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.0000 112,000.00 213,711.080 213,711.08 S) (60 MM MAXIMUM) 61 COLD PLAN LEAN CONCRETE BASE M2 1.0000 26,200.00 0.000 0.00 S) (30 MM, MAXIMUM) 62 SAWCUT ASPHALT CONCRETE M 0.1000 6,400.00 59,337.000 5,933.70 (300 MM DEEP) 63 SAWCUT ASPHALT CONCRETE M 0.1000 370.00 3,385.000 338.50 (340 MM DEPTH) 64 REPLACE CONCRETE BARRIER (TYPE K) M 70.0000 151,900.00 0.000 0.00 65 REMOVE CONCRETE M3 80.0000 68,000.00 295.773 23,661.84 66 REMOVE CONCRETE (CURB AND GUTTER) M 17.0000 850.00 36.000 612.00 67 REMOVE CONCRETE CURB AND SIDEWALK M3 60.0000 6,000.00 13.900 834.00 68 PREPARE CONCRETE BRIDGE DECK SURFACE M2 20.0000 4,000.00 98.800 1,976.00 69 REMOVE SOUND WALL M2 250.0000 500.00 2.000 500.00 70 REMOVE BRIDGE APPROACH RAILING EA 600.0000 9,600.00 16.000 9,600.00 71 RAILROAD TRACK REMOVAL M 8.0000 11,120.00 1,200.000 9,600.00 72 GRADE CROSSING REMOVAL M 75.0000 12,000.00 160.000 12,000.00 73 BRIDGE REMOVAL LS 76,000.0000 76,000.00 0.850 64,600.00 74 BRIDGE REMOVAL (PORTION), LOCATION A LS 24,000.0000 24,000.00 1.000 24,000.00 75 BRIDGE REMOVAL (PORTION), LOCATION B LS 30,000.0000 30,000.00 1.000 30,000.00 76 BRIDGE REMOVAL (PORTION), LOCATION C LS 48,000.0000 48,000.00 1.000 48,000.00 PROGRAM CAS145 PAGE 4 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 BRIDGE REMOVAL (PORTION), LOCATION D LS 17,000.0000 17,000.00 1.000 17,000.00 78 BRIDGE REMOVAL (PORTION), LOCATION E LS 13,000.0000 13,000.00 0.900 11,700.00 79 600 MM PLASTIC PIPELINER M 150.0000 36,000.00 0.000 0.00 80 900 MM PLASTIC PIPELINER M 200.0000 80,000.00 0.000 0.00 81 1200 MM PLASTIC PIPELINER M 300.0000 150,000.00 423.100 126,930.00 82 CLEARING AND GRUBBING LS 180,000.0000 180,000.00 0.910 163,800.00 83 DEVELOP WATER SUPPLY LS 315,000.0000 315,000.00 1.000 315,000.00 84 ROADWAY EXCAVATION M3 6.5000 8,515,000.00 1,208,225.800 7,853,467.70 85 ROADWAY EXCAVATION (TYPE Y) M3 7.0000 1,638,000.00 233,931.000 1,637,517.00 (AERIALLY DEPOSITED LEAD) 86 LEAD COMPLIANCE PLAN LS 15,000.0000 15,000.00 1.000 15,000.00 87 SHOULDER BACKING M3 2.0000 110,000.00 13,483.960 26,967.92 88 STRUCTURE EXCAVATION (BRIDGE) M3 30.0000 214,200.00 7,140.000 214,200.00 F) 89 STRUCTURE EXCAVATION (RETAINING WALL) M3 8.0000 115,200.00 12,930.860 103,446.88 90 STRUCTURE BACKFILL (BRIDGE) M3 45.0000 200,700.00 4,151.000 186,795.00 F) 91 STRUCTURE BACKFILL (RETAINING WALL) M3 12.0000 128,400.00 8,591.930 103,103.16 92 PERVIOUS BACKFILL MATERIAL M3 120.0000 22,800.00 161.800 19,416.00 F) 93 PERVIOUS BACKFILL MATERIAL (RETAINING M3 60.0000 40,800.00 550.810 33,048.60 WALL) 94 SAND BACKFILL M3 130.0000 137,800.00 257.650 33,494.50 95 HIGHWAY PLANTING LS 8,000.0000 8,000.00 0.985 7,880.00 S) 96 ROADSIDE CLEARING LS 9,000.0000 9,000.00 0.610 5,490.00 97 ROCK GRAVEL (TYPE 1) M2 8.0000 150,400.00 4,533.000 36,264.00 S) 98 DUFF HA 1,100.0000 143,000.00 113.420 124,762.00 S) 99 STRAW (EROSION CONTROL) TONN 225.0000 2,025.00 10.910 2,454.75 S) 00 FIBER (EROSION CONTROL) KG 0.8000 2,136.00 3,270.960 2,616.77 S) 01 COMPOST (EROSION CONTROL) KG 0.0200 200.00 12,266.110 245.32 S) 02 PURE LIVE SEED (EROSION CONTROL) KG 150.0000 10,050.00 81.770 12,265.50 S) 03 STABILIZING EMULSION (EROSION CONTROL) KG 1.3000 1,742.00 1,635.480 2,126.12 S) PROGRAM CAS145 PAGE 5 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 JUTE MESH M2 1.2500 27,750.00 27,258.000 34,072.50 S) 05 TRANSPLANT JOSHUA TREE EA 300.0000 4,800.00 0.000 0.00 S) 06 TRANSPLANT YUCCA PLANT EA 100.0000 2,100.00 0.000 0.00 S) 07 MAINTAIN EXISTING PLANTS LS 6,500.0000 6,500.00 0.647 4,205.50 S) 08 PLANT ESTABLISHMENT WORK LS 30,000.0000 30,000.00 0.216 6,480.00 S) 09 IRRIGATION SYSTEM LS 133,000.0000 133,000.00 0.972 129,276.00 S) 10 200 MM CORRUGATED STEEL PIPE CONDUIT M 235.0000 49,350.00 186.570 43,843.95 S) (1.63 MM THICK) 11 300 MM WELDED STEEL PIPE CONDUIT M 500.0000 30,000.00 0.000 0.00 S) (6.35 MM THICK) 12 CLASS 2 AGGREGATE SUBBASE M3 10.0000 1,640,000.00 194,752.730 1,947,527.30 13 CLASS 2 AGGREGATE BASE M3 24.0000 2,042,400.00 83,196.490 1,996,715.76 14 AGGREGATE BASE (APPROACH SLAB) M3 75.0000 4,275.00 0.000 0.00 15 LEAN CONCRETE BASE M3 62.0000 7,316,000.00 72,860.680 4,517,362.16 16 ASPHALT TREATED PERMEABLE BASE M3 80.0000 41,600.00 122.740 9,819.20 17 ASPHALT CONCRETE (TYPE A, BOND BREAKER) TONN 32.0000 2,009,600.00 24,952.240 798,471.68 18 ASPHALT CONCRETE (TYPE C) TONN 34.0000 1,305,600.00 39,810.310 1,353,550.54 19 ASPHALT CONCRETE TONN 32.0000 8,192,000.00 1,060.120 33,923.84 209,163.060 6,693,217.92 20 ASPHALT CONCRETE (OPEN GRADED) TONN 33.0000 419,100.00 57.270 1,889.91 946.850 31,246.05 21 PAVING ASPHALT (PAINT BINDER) TONN 300.0000 567,000.00 609.180 182,754.00 22 PAVEMENT REINFORCING FABRIC M2 2.0000 1,900.00 0.000 0.00 23 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 4.0000 164,000.00 208.000 832.00 AREA) 24 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 2.6000 338.00 103.000 267.80 25 PLACE ASPHALT CONCRETE DIKE (TYPE D) M 1.6000 5,200.00 1,890.000 3,024.00 26 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 1.6000 5,888.00 0.000 0.00 27 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 2.6000 858.00 1,588.500 4,130.10 28 RUMBLE STRIP M 0.1000 6,690.00 2,984.000 298.40 29 CONCRETE PAVEMENT M3 74.5000 19,966,000.00 154,478.980 11,508,684.01 30 PLACE CONCRETE DIKE (TYPE C MODIFIED) M 5.0000 950.00 178.000 890.00 PROGRAM CAS145 PAGE 6 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 PLACE CONCRETE DIKE (TYPE D MODIFIED) M 5.0000 35,000.00 8,607.000 43,035.00 32 PLACE CONCRETE DIKE (TYPE F MODIFIED) M 5.0000 700.00 90.000 450.00 33 RUMBLE STRIP (PORTLAND CEMENT CONCRETE M 0.2500 17,950.00 40,196.000 10,049.00 S) PAVEMENT) (ROLLED-IN-INDICATATIONS) 34 SEAL PAVEMENT JOINT M 1.0000 364,000.00 213,681.390 213,681.39 35 FURNISH STEEL PILING (HP 250 X 62) M 25.0000 38,125.00 1,570.064 39,251.60 36 DRIVE STEEL PILE (HP 250 X 62) EA 900.0000 160,200.00 178.000 160,200.00 S) 37 FURNISH STEEL PILING (HP 250 X 85) M 40.0000 9,200.00 227.399 9,095.96 38 DRIVE STEEL PILE (HP 250 X 85) EA 700.0000 24,500.00 35.000 24,500.00 S) 39 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 85.0000 295,630.00 3,488.670 296,536.95 S) PILING 40 350 MM CAST-IN-DRILLED-HOLE CONCRETE M 85.0000 19,550.00 228.000 19,380.00 S) PILING (SOUND WALL) 41 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 85.0000 6,290.00 74.000 6,290.00 S) PILING (SOUND WALL) 42 PRESTRESSING CAST-IN-PLACE CONCRETE LS 16,000.0000 16,000.00 1.000 16,000.00 S) 43 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 275.0000 426,250.00 1,613.570 443,731.75 F) 44 STRUCTURAL CONCRETE, BRIDGE M3 495.0000 2,450,250.00 4,910.850 2,430,870.75 F) 45 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 46 STRUCTURAL CONCRETE, RETAINING WALL M3 225.0000 1,161,000.00 5,025.630 1,130,766.75 47 STRUCTURAL CONCRETE, APPROACH SLAB M3 500.0000 285,000.00 524.460 262,230.00 F) (TYPE N) 48 STRUCTURAL CONCRETE, APPROACH SLAB M3 600.0000 312,000.00 520.000 312,000.00 F) (TYPE R) 49 STRUCTURAL CONCRETE,APPROACH SLAB M3 675.0000 24,300.00 36.000 24,300.00 F) (TYPE EQ MODIFIED) 50 STRUCTURAL CONCRETE,APPROACH SLAB M3 550.0000 22,550.00 41.000 22,550.00 F) (TYPE R MODIFIED) 51 CLASS 2 CONCRETE (BOX CULVERT) M3 650.0000 546,000.00 892.120 579,878.00 52 CLASS 2 CONCRETE (CHANNEL LINING) M3 225.0000 99,000.00 127.270 28,635.75 53 CLASS 2 CONCRETE (HEADWALL) M3 700.0000 658,000.00 843.260 590,282.00 54 MINOR CONCRETE (MINOR STRUCTURE) M3 1,000.0000 220,000.00 168.840 168,840.00 55 PAVING NOTCH EXTENSION M3 4,000.0000 60,000.00 14.960 59,840.00 56 CONCRETE SURFACE TEXTURE M2 100.0000 385,000.00 4,748.100 474,810.00 57 DRILL AND BOND DOWEL M 60.0000 166,200.00 1,754.710 105,282.60 PROGRAM CAS145 PAGE 7 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 58 DRILLED HOLE (16 MM) M 30.0000 4,200.00 766.470 22,994.10 59 CLEAN EXPANSION JOINT M 30.0000 10,800.00 106.260 3,187.80 60 FURNISH POLYESTER CONCRETE OVERLAY M3 1,700.0000 18,700.00 14.940 25,398.00 61 PLACE POLYESTER CONCRETE OVERLAY M2 75.0000 15,000.00 197.200 14,790.00 62 SOUND WALL (BARRIER) (MASONRY BLOCK) M2 125.0000 420,000.00 3,786.200 473,275.00 S) 63 SOUND WALL (MASONRY BLOCK) M2 125.0000 117,500.00 843.530 105,441.25 S) 64 PTFE SPHERICAL BEARING EA 8,000.0000 64,000.00 8.000 64,000.00 S) 65 JOINT SEAL (TYPE A - MR 30 MM) M 70.0000 43,400.00 455.040 31,852.80 S) 66 JOINT SEAL (MR 15 MM) M 70.0000 7,000.00 94.090 6,586.30 S) 67 JOINT SEAL (MR 40 MM) M 310.0000 2,790.00 0.000 0.00 S) 68 BAR REINFORCING STEEL KG 1.1500 202,400.00 170,219.600 195,752.54 S) 69 BAR REINFORCING STEEL (BRIDGE) KG 1.0400 1,046,864.00 1,006,600.000 1,046,864.00 SF) 70 BAR REINFORCING STEEL (RETAINING WALL) KG 1.0500 306,600.00 290,400.006 304,920.01 S) 71 WATERPROOFING AND COVER M2 85.0000 43,350.00 510.000 43,350.00 SF) 72 FURNISH STRUCTURAL STEEL (BRIDGE) KG 2.3000 1,197,610.00 520,700.000 1,197,610.00 F) 73 ERECT STRUCTURAL STEEL (BRIDGE) KG 0.6000 312,420.00 520,700.000 312,420.00 SF) 74 FURNISH CMS SIGN STRUCTURE KG 7.8000 122,460.00 15,780.000 123,084.00 75 INSTALL CMS SIGN STRUCTURE KG 0.7500 11,775.00 15,780.000 11,835.00 S) 76 FURNISH SIGN STRUCTURE (TRUSS) KG 4.0000 492,000.00 68,570.000 274,280.00 77 INSTALL SIGN STRUCTURE (TRUSS) KG 0.3000 36,900.00 64,340.000 19,302.00 S) 78 760 MM CAST-IN-DRILLED-HOLE M 800.0000 51,200.00 12.000 9,600.00 S) CONCRETE PILE (SIGN FOUNDATION) 79 920 MM CAST-IN-DRILLED-HOLE M 900.0000 99,000.00 101.500 91,350.00 S) CONCRETE PILE (SIGN FOUNDATION) 80 1220 MM CAST-IN-DRILLED-HOLE M 1,000.0000 6,000.00 5.500 5,500.00 S) CONCRETE PILE (SIGN FOUNDATION) 81 ROADSIDE SIGN - ONE POST EA 250.0000 16,500.00 23.000 5,750.00 82 ROADSIDE SIGN - TWO POST EA 700.0000 6,300.00 0.000 0.00 83 INSTALL SIGN OVERLAY M2 150.0000 300.00 18.100 2,715.00 84 CLEAN AND PAINT STRUCTURAL STEEL LS 250,000.0000 250,000.00 1.000 250,000.00 S) PROGRAM CAS145 PAGE 8 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 85 RAILROAD BALLAST M3 40.0000 144,800.00 2,747.780 109,911.20 S) 86 RAILROAD SUBBALLAST M3 25.0000 125,000.00 4,021.490 100,537.25 S) 87 RAILROAD APPROACH RAILING (TYPE I) M 250.0000 15,500.00 62.000 15,500.00 88 RAILROAD APPROACH RAILING (TYPE II) M 640.0000 35,200.00 55.000 35,200.00 89 WOOD PLANK GRADE CROSSING M 350.0000 77,000.00 215.000 75,250.00 S) 90 RAILROAD TRACK M 250.0000 347,500.00 1,387.000 346,750.00 S) 91 375 MM ALTERNATIVE PIPE CULVERT M 140.0000 56,000.00 298.600 41,804.00 92 450 MM ALTERNATIVE PIPE CULVERT M 95.0000 73,150.00 853.510 81,083.45 93 600 MM ALTERNATIVE PIPE CULVERT M 200.0000 124,000.00 1,395.600 279,120.00 94 750 MM ALTERNATIVE PIPE CULVERT M 175.0000 89,250.00 484.400 84,770.00 95 900 MM ALTERNATIVE PIPE CULVERT M 300.0000 363,000.00 1,243.400 373,020.00 96 1050 MM ALTERNATIVE PIPE CULVERT M 400.0000 440,000.00 1,015.300 406,120.00 97 1200 MM ALTERNATIVE PIPE CULVERT M 250.0000 1,237,500.00 3,213.900 803,475.00 98 1350 MM ALTERNATIVE PIPE CULVERT M 500.0000 4,745,000.00 9,121.600 4,560,800.00 99 1650 MM ALTERNATIVE PIPE CULVERT M 700.0000 98,000.00 159.860 111,902.00 00 1950 MM ALTERNATIVE PIPE CULVERT M 700.0000 112,000.00 163.200 114,240.00 01 450 MM REINFORCED CONCRETE PIPE M 175.0000 16,625.00 101.800 17,815.00 02 600 MM REINFORCED CONCRETE PIPE M 180.0000 12,600.00 92.400 16,632.00 03 750 MM REINFORCED CONCRETE PIPE M 325.0000 19,500.00 91.000 29,575.00 04 900 MM REINFORCED CONCRETE PIPE M 450.0000 35,100.00 46.800 21,060.00 05 1050 MM REINFORCED CONCRETE PIPE M 400.0000 48,000.00 115.400 46,160.00 06 1200 MM REINFORCED CONCRETE PIPE M 500.0000 70,000.00 65.000 32,500.00 07 1350 MM REINFORCED CONCRETE PIPE M 350.0000 178,500.00 680.500 238,175.00 08 80 MM PLASTIC PIPE (EDGE DRAIN) M 18.0000 21,600.00 445.000 8,010.00 09 80 MM PLASTIC PIPE (EDGE DRAIN OUTLET) M 75.0000 27,000.00 67.000 5,025.00 10 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 11 GRATED LINE DRAIN M 350.0000 18,550.00 46.500 16,275.00 PROGRAM CAS145 PAGE 9 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 12 300 MM CORRUGATED STEEL PIPE RISER M 500.0000 42,500.00 69.700 34,850.00 (1.63 MM THICK) 13 900 MM CORRUGATED STEEL PIPE RISER M 1,200.0000 216,000.00 175.590 210,708.00 (2.01 MM THICK) 14 375 MM STEEL FLARED END SECTION EA 300.0000 5,100.00 8.000 2,400.00 15 450 MM STEEL FLARED END SECTION EA 350.0000 8,750.00 16.000 5,600.00 16 600 MM STEEL FLARED END SECTION EA 350.0000 10,850.00 9.000 3,150.00 17 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 75.0000 48,750.00 1,276.100 95,707.50 18 ROCK SLOPE PROTECTION M3 80.0000 103,200.00 1,060.300 84,824.00 (FACING, METHOD B) 19 ROCK SLOPE PROTECTION M3 150.0000 153,000.00 1,199.110 179,866.50 (BACKING NO. 1, METHOD B) 20 ROCK SLOPE PROTECTION (1/2T, METHOD B) M3 75.0000 133,500.00 2,755.700 206,677.50 21 ROCK SLOPE PROTECTION (1/4T, METHOD B) M3 75.0000 25,500.00 294.000 22,050.00 22 SLOPE PAVING (CONCRETE) M3 500.0000 23,500.00 109.699 54,849.50 23 ROCK SLOPE PROTECTION FABRIC M2 3.0000 33,300.00 10,647.000 31,941.00 24 MINOR CONCRETE (MISCELLANEOUS M3 500.0000 50,000.00 45.490 22,745.00 CONSTRUCTION) 25 MINOR CONCRETE (GUTTER) M 75.0000 52,500.00 399.300 29,947.50 26 MISCELLANEOUS IRON AND STEEL KG 2.0000 60,000.00 15,387.000 30,774.00 S) 27 MISCELLANEOUS METAL KG 13.0000 18,720.00 1,440.000 18,720.00 SF)(RESTRAINER - PIPE TYPE) 28 MISCELLANEOUS METAL (BRIDGE) KG 13.0000 25,480.00 1,960.000 25,480.00 SF) 29 FENCE (TYPE BW, 5 STRAND, METAL POST) M 6.5000 264,550.00 62,651.200 407,232.80 S) 30 FENCE (TYPE WM, METAL POST) M 6.5000 33,800.00 4,266.000 27,729.00 S) 31 CHAIN LINK FENCE (TYPE CL-1.8) M 30.0000 150,300.00 1,158.840 34,765.20 S) 32 1.2 M CHAIN LINK GATE (TYPE CL-1.8) EA 800.0000 800.00 0.000 0.00 S) 33 3.7 M CHAIN LINK GATE (TYPE CL-1.8) EA 1,500.0000 3,000.00 1.000 1,500.00 S) 34 DELINEATOR (CLASS 1) EA 45.0000 18,000.00 0.000 0.00 35 METAL BEAM GUARD RAILING (WOOD POST) M 54.0000 82,080.00 1,061.240 57,306.96 S) 36 CORRUGATED METAL GUARD RAILING M 200.0000 30,000.00 150.000 30,000.00 S) 37 CONCRETE BARRIER (TYPE K) M 75.0000 385,500.00 3,233.000 242,475.00 38 CONCRETE BARRIER (TYPE K MODIFIED) M 85.0000 7,310.00 0.000 0.00 PROGRAM CAS145 PAGE 10 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 39 CONCRETE BARRIER (TYPE 25) M 165.0000 12,870.00 0.000 0.00 F) 40 CONCRETE BARRIER (TYPE 27A) M 250.0000 5,000.00 0.000 0.00 41 DOUBLE THRIE BEAM BARRIER (STEEL POST) M 54.0000 75,600.00 0.000 0.00 S) 42 CABLE RAILING M 24.0000 59,280.00 1,192.400 28,617.60 S) 43 TERMINAL SYSTEM (TYPE ET) EA 2,400.0000 12,000.00 3.000 7,200.00 S) 44 TERMINAL SYSTEM (TYPE SRT) EA 1,650.0000 128,700.00 41.000 67,650.00 S) 45 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 300.0000 13,800.00 20.000 6,000.00 S) 46 CONCRETE BARRIER (TYPE 60) M 132.0000 3,960.00 0.000 0.00 47 CONCRETE BARRIER (TYPE 60A) M 130.0000 14,950.00 100.540 13,070.20 F) 48 CONCRETE BARRIER (TYPE 60C) M 145.0000 78,300.00 427.000 61,915.00 49 CONCRETE BARRIER (TYPE 60D) M 100.0000 78,000.00 448.920 44,892.00 50 CONCRETE BARRIER M 150.0000 26,700.00 0.000 0.00 F) (TYPE 60 A MODIFIED) 51 CONCRETE BARRIER (TYPE 60 W) M 400.0000 184,000.00 458.000 183,200.00 52 CONCRETE BARRIER (TYPE 736) M 80.0000 142,400.00 980.454 78,436.32 F) 53 CONCRETE BARRIER (TYPE 736SV) M 100.0000 3,000.00 30.000 3,000.00 54 THERMOPLASTIC PAVEMENT MARKING M2 35.0000 18,900.00 0.000 0.00 S) 55 THERMOPLASTIC TRAFFIC STRIPE M 0.5500 142,450.00 130,416.000 71,728.80 S) (SPRAYABLE) 56 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2000 56,280.00 18,004.000 21,604.80 S) 57 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.6000 61,360.00 7,876.000 20,477.60 S) 58 PAVEMENT MARKER EA 7.5000 17,250.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) 59 SIGNAL AND LIGHTING LS 105,000.0000 105,000.00 0.964 101,220.00 S) 60 SIGN DISCONNECT EA 400.0000 4,000.00 11.000 4,400.00 S) 61 RELOCATE MERCURY VAPOR SIGN LIGHTING EA 450.0000 900.00 0.000 0.00 S) EQUIPMENT 62 REMOVE SIGN LIGHTING EQUIPMENT EA 625.0000 1,875.00 2.000 1,250.00 S) 63 REMOVE SIGN DISCONNECT EA 115.0000 460.00 2.000 230.00 S) 64 INSTALL STATE FURNISHED MODEL 500 EA 4,000.0000 8,000.00 2.000 8,000.00 S) SIGN PANEL ASSEMBLY 65 RELOCATE MODEL 500 CHANGEABLE MESSAGE EA 1,000.0000 1,000.00 1.000 1,000.00 S) SIGN AND OVERHEAD SIGN TRUSS PROGRAM CAS145 PAGE 11 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 66 TYPE III SERVICE EQUIPMENT ENCLOSURE EA 2,500.0000 10,000.00 3.000 7,500.00 S) 67 MODIFY TYPE III SERVICE EQUIPMENT EA 600.0000 1,800.00 0.000 0.00 S) 68 TELEPHONE DEMARCATION CABINET EA 1,400.0000 1,400.00 1.000 1,400.00 S) 69 INSTALL MODEL 334 CABINET EA 1,100.0000 5,500.00 1.000 1,100.00 S) 70 MODIFY MODEL 334 CABINET FOR CLOSED EA 900.0000 1,800.00 0.000 0.00 S) CIRCUIT TELEVISION 71 5 KVA TRANSFORMER EA 800.0000 2,400.00 1.000 800.00 S) 72 15 KVA TRANSFORMER AND PAD EA 2,000.0000 6,000.00 3.000 6,000.00 S) 73 SIZE 27 CONDUIT M 12.0000 1,200.00 227.000 2,724.00 S) 74 SIZE 41 CONDUIT M 24.0000 164,640.00 5,944.000 142,656.00 S) 75 SIZE 53 CONDUIT M 32.0000 85,760.00 3,460.000 110,720.00 S) 76 SIZE 78 CONDUIT M 30.0000 66,900.00 2,415.000 72,450.00 S) 77 SIZE 103 CONDUIT M 70.0000 43,400.00 601.000 42,070.00 S) 78 SIZE 63 CONDUIT M 30.0000 1,800.00 78.000 2,340.00 S) 79 203 MM STEEL SLEEVE M 240.0000 24,000.00 59.000 14,160.00 S) 80 INDUCTIVE LOOP DETECTOR EA 550.0000 15,400.00 14.000 7,700.00 S) 81 CLOSED CIRCUIT TELEVISION ASSEMBLY EA 3,700.0000 7,400.00 0.000 0.00 S) (CABINET MOUNTED) 82 CLOSED CIRCUIT TELEVISION ASSEMBLY EA 20,000.0000 20,000.00 0.000 0.00 S) (POLE MOUNTED) 83 SLOW SCAN VIDEO CODES EA 4,500.0000 13,500.00 0.000 0.00 S) 84 CELLULAR DIGITAL PACKET DATA CELLULAR EA 2,500.0000 15,000.00 0.000 0.00 S) ASSEMBLY 85 CAMERA POLE (CCTV 45) EA 2,500.0000 2,500.00 1.000 2,500.00 S) 86 RELOCATE ELECTROLIER EA 1,500.0000 22,500.00 13.000 19,500.00 S) 87 RETROFIT MODEL 500 CHANGEABLE MESSAGE EA 6,000.0000 6,000.00 1.000 6,000.00 S) SIGN WITH STATE FURNISHED ZENON LAMP MODULES AND 5 KVA TRANSFORMERS 88 150-WATT HIGH PRESSURE PENDANT SOFFIT EA 1,400.0000 5,600.00 0.000 0.00 S) LUMINAIRE 89 200-WATT HIGH PRESSURE SODIUM LUMINAIRE EA 300.0000 4,500.00 11.000 3,300.00 S) 90 310-WATT HIGH PRESSURE SODIUM LUMINAIRE EA 300.0000 10,500.00 28.000 8,400.00 S) 91 250-WATT WALL SURFACE MOUNT LUMINAIRE EA 500.0000 4,500.00 0.000 0.00 S) PROGRAM CAS145 PAGE 12 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 92 MERCURY VAPOR SIGN LIGHTING FIXTURE EA 650.0000 12,350.00 0.000 0.00 S) 93 TYPE 15-SB LIGHTING STANDARD WITH EA 1,800.0000 27,000.00 11.000 19,800.00 S) LUMINAIRE ARM 94 TYPE 30 LIGHTING STANDARD WITH EA 2,200.0000 8,800.00 1.000 2,200.00 S) LUMINAIRE ARM 95 TYPE 31 LIGHTING STANDARD WITH EA 3,000.0000 42,000.00 8.000 24,000.00 S) LUMINAIRE ARM 96 FOUNDATION FOR ELECTROLLER OR CCTV POLE EA 360.0000 14,040.00 28.000 10,080.00 S) 97 TYPE 21 LIGHTING STANDARD WITH EA 1,500.0000 6,000.00 4.000 6,000.00 S) LUMINAIRE ARM 98 FUSED SPLICE CONNECTOR EA 125.0000 5,500.00 21.000 2,625.00 S) 99 REMOVE LUMINAIRE EA 120.0000 1,920.00 15.000 1,800.00 S) 00 CONDUCTOR (NO. 14) M 1.0000 1,150.00 725.000 725.00 S) 01 CONDUCTOR (NO. 12) M 3.5000 70.00 0.000 0.00 S) 02 CONDUCTOR (NO. 10) M 1.2000 6,780.00 6,085.000 7,302.00 S) 03 CONDUCTOR (NO. 8) M 1.7000 15,878.00 7,200.000 12,240.00 S) 04 CONDUCTOR (NO. 6) M 2.0000 12,860.00 10,446.000 20,892.00 S) 05 CONDUCTOR (NO. 4) M 3.0000 18,000.00 5,540.000 16,620.00 S) 06 CONDUCTOR (NO. 2) M 4.0000 18,160.00 3,773.000 15,092.00 S) 07 CONDUCTOR (NO. 1) M 5.0000 2,300.00 0.000 0.00 S) 08 CONDUCTOR (NO. 2/0) M 6.0000 36,600.00 5,991.000 35,946.00 S) 09 CONDUCTOR (NO. 4/0) M 30.0000 900.00 0.000 0.00 S) 10 CONDUCTOR (BARE NO. 8) M 2.0000 17,400.00 8,218.000 16,436.00 S) 11 TELEPHONE CABLE M 3.0000 6,900.00 2,018.000 6,054.00 S) 12 LOOP DETECTOR LEAD-IN CABLE M 2.0000 1,400.00 990.000 1,980.00 S) 13 NO. 5(T) PULL BOX EA 700.0000 70,000.00 90.000 63,000.00 S) 14 NO. 5 PULL BOX EA 400.0000 36,400.00 58.000 23,200.00 S) 15 NO. 6(E) PULL BOX EA 550.0000 20,900.00 38.000 20,900.00 S) 16 REMOVE PULL BOX EA 60.0000 780.00 39.000 2,340.00 S) 17 NO. 6 (E) (T) PULL BOX EA 1,200.0000 19,200.00 12.000 14,400.00 S) 18 NO. 9/9A STRUCTURE PULL BOX EA 400.0000 5,200.00 27.000 10,800.00 S) PROGRAM CAS145 PAGE 13 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 19 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 20 RECONSTRUCT ROCK SLOPE PROTECTION M3 65.0000 104,000.00 420.000 27,300.00 21 RELOCATE GRATE EA 100.0000 6,000.00 0.000 0.00 22 REMOVE SLOPE PAVING M2 10.0000 12,700.00 632.000 6,320.00 23 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.0000 26,000.00 51,821.700 51,821.70 (30 MM MAXIMUM) 24 1524 MM CAST-IN-DRILLED-HOLE CONCRETE M 2,000.0000 26,000.00 13.400 26,800.00 PILE (SIGN FOUNDATION) 25 ROCK SLOPE PROTECTION (2T, METHOD A) M3 75.0000 37,500.00 125.000 9,375.00 PROGRAM CAS145 PAGE 14 DATE 07/01/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-3555U4 TIME 03:32 PM ESTIMATE NO. 32 BID OPENING 02/28/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/16/04 R.E. NAME: FRAYWAT, NABIL DATE OF THIS ESTIMATE 07/01/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 35,813.75 70,625,585.39 ADJUSTMENT OF COMPENSATION 2,817.01 906,174.15 EXTRA WORK 66,476.30 2,595,154.19 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 105,107.06 74,126,913.73 26 MOBILIZATION LS 9800,000.0000 9,800,000.00 1.000 9,800,000.00 ORIGINAL CONTRACT AMOUNT 99,599,234.00 TOTAL WORK COMPLETED 105,107.06 83,926,913.73 MATERIALS ON HAND ON SITE 362,885.19 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -88,799.40 TOTAL 105,107.06 84,200,999.52 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/28/02 705 04/04/02 04/02/02 01/14/05 450 103 11 0 PLANT ESTABLISHMENT PERI PROGRESS IS SATISFACTORY FRAYWAT, NABIL RESIDENT ENGINEER PROGRAM CAS145 DATE 07/01/04