PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/26/13 EST. NO.25 TIME 10:44 AM R.E. NAME: YAP, SIONG 08-378704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0101 290.84 E.W. @ F.A.(+) 011513 Y 0454.1 0102 186.48 021113 Y 0474.0 0103 559.44 021513 Y 0475.0 0104 581.37 020713 Y 0473.0 002 0005 206.80 A.C. @ U.P.(+) 103112 Y 0411.0 0006 88.00 113012 Y 0419.0 0007 285.20 013113 Y 0469.0 2,198.13 TOTAL THIS ESTIMATE 1,395,692.17 TOTAL PREVIOUS ESTIMATE 1,397,890.30 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/26/13 EST. NO.25 TIME 10:44 AM R.E. NAME: YAP, SIONG 08-378704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 LOCATION PROGRESS ESTIMATE 08-SBD-62-142.2/142.9 ----------------- M C M CONSTRUCTION INC IN SAN BERNARDINO COUNTY CALIFORNIA P O BOX 620 AND IN LA PAZ COUNTY ARIZONA FROM NORTH HIGHLANDS CA 956600620 THE INTERSECTION OF LPARKER DAM ROAD AT EARP TO THIRD STREET AT PARKER FED. AID NO. STP-BRST(PP0)620,STP-BRST(PP0)29,BR- S95(A20)A BRIDGE TO BE REPLACED ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 15,000.0000 15,000.00 0.750 11,250 002 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 3,500.00 4.000 1,000.00 7.000 1,750 003 TIME-RELATED OVERHEAD LS 1,500,000.0000 1,500,000.00 0.034 51,000.00 0.795 1,192,500 004 TEMPORARY FENCE (TYPE ESA) LF 8.0000 4,080.00 450.000 3,600 005 48" TEMPORARY CULVERT LF 60.0000 7,200.00 80.000 4,800 006 CONSTRUCTION SITE MANAGEMENT LS 25,000.0000 25,000.00 0.030 750.00 0.730 18,250 007 PREPARE STORM WATER POLLUTION LS 2,500.0000 2,500.00 0.900 2,250 PREVENTION PLAN 008 BIOLOGICAL MONITOR LS 15,000.0000 15,000.00 0.030 450.00 0.760 11,400 009 TEMPORARY FIBER ROLL LF 2.7000 27,000.00 935.000 2,524 010 TEMPORARY SILT FENCE LF 2.7000 17,550.00 3,350.000 9,045 011 TEMPORARY CONSTRUCTION ENTRANCE EA 1,500.0000 12,000.00 2.000 3,000 012 TEMPORARY COVER SQYD 4.0000 4,000.00 1,505.000 6,020 013 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 3,000.00 1.000 500 014 STREET SWEEPING LS 15,000.0000 15,000.00 0.030 450.00 0.690 10,350 015 TEMPORARY CONCRETE WASHOUT BIN EA 1,500.0000 6,000.00 1.000 1,500 016 TEMPORARY SOIL BINDER SQYD 0.2400 18,480.00 52,000.000 12,480 017 CONSTRUCTION AREA SIGNS LS 8,000.0000 8,000.00 0.750 6,000 018 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 0.030 600.00 0.700 14,000 019 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 2.0000 720.00 760.000 1,520 020 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.5000 24,500.00 42,959.000 21,479 021 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 7,200.00 89.000 3,560 022 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,000.0000 5,000.00 0.600 3,000 PROGRAM CAS145 PAGE 2 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY RAILING (TYPE K) LF 15.0000 171,000.00 11,200.000 168,000 024 TEMPORARY CRASH CUSHION MODULE EA 300.0000 10,200.00 39.000 11,700 025 TEMPORARY TRAFFIC SCREEN LF 3.0000 34,200.00 0.000 0 026 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.5000 6,100.00 11,730.000 5,865 STRIPE (HAZARDOUS WASTE) 027 OBLITERATE SURFACING SQYD 6.0000 1,440.00 330.000 1,980 028 REMOVE FENCE LF 4.0000 3,800.00 875.000 3,500 029 REMOVE METAL BEAM GUARD RAILING LF 5.0000 11,450.00 2,188.000 10,940 030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 4,240.00 8,135.000 3,254 031 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 580.00 105.000 210 032 REMOVE PAVEMENT MARKER EA 1.0000 530.00 164.000 164 033 REMOVE ROADSIDE SIGN EA 250.0000 750.00 3.000 750 034 REMOVE PIPE LF 37.0000 8,510.00 224.300 8,299 035 REMOVE HEADWALL EA 500.0000 500.00 2.000 1,000 036 REMOVE DOWNDRAIN EA 200.0000 200.00 1.000 200 037 RESET ROADSIDE SIGN EA 500.0000 5,500.00 0.000 0 038 RELOCATE 2" WATERLINE LF 60.0000 6,000.00 0.000 0 039 RELOCATE MONUMENT PLAQUE EA 2,000.0000 2,000.00 0.000 0 040 RELOCATE ROADSIDE SIGN EA 500.0000 5,500.00 0.000 0 041 ADJUST MANHOLE TO GRADE EA 750.0000 2,250.00 2.000 1,500 042 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 4.0000 9,520.00 0.000 0 043 REMOVE CONCRETE CY 130.0000 1,170.00 6.770 880 044 BRIDGE REMOVAL LS 350,000.0000 350,000.00 0.700 245,000 045 CLEARING AND GRUBBING LS 25,000.0000 25,000.00 1.000 25,000 046 ROADWAY EXCAVATION CY 14.5000 404,550.00 29,900.000 433,550 047 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 048 STRUCTURE EXCAVATION (BRIDGE) CY 100.0000 180,000.00 1,800.000 180,000 (F) 049 STRUCTURE EXCAVATION (RETAINING WALL) CY 60.0000 337,020.00 7,591.000 455,460 (F) PROGRAM CAS145 PAGE 3 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 STRUCTURE EXCAVATION (TIEBACK WALL) CY 60.0000 28,080.00 0.000 0 (F) 051 STRUCTURE BACKFILL (BRIDGE) CY 60.0000 48,600.00 405.000 24,300 (F) 052 STRUCTURE BACKFILL (RETAINING WALL) CY 25.0000 152,000.00 4,700.000 117,500 (F) 053 STRUCTURE BACKFILL (TIEBACK WALL) CY 25.0000 2,200.00 0.000 0 (F) 054 EROSION CONTROL (DRY SEED) (ACRE) ACRE 3,000.0000 17,400.00 0.000 0 055 COMPOST (INCORPORATE) SQYD 5.0000 135,000.00 0.000 0 056 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,500.0000 6,000.00 0.000 0 057 EROSION CONTROL (POLYMER STABILIZED ACRE 1,700.0000 9,860.00 0.000 0 FIBER MATRIX) (ACRE) 058 PLANT (GROUP B) EA 54.0000 9,180.00 0.000 0 059 PLANT ESTABLISHMENT WORK LS 25,000.0000 25,000.00 0.000 0 060 CLASS 2 AGGREGATE BASE CY 35.0000 233,100.00 3,797.100 132,898 061 HOT MIX ASPHALT (TYPE C) TON 111.0000 820,290.00 4,123.170 457,671 062 HOT MIX ASPHALT (TYPE A) TON 115.0000 156,400.00 0.000 0 063 DATA CORE LS 1,300.0000 1,300.00 0.500 650 064 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 7.5000 7,575.00 0.000 0 065 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 7.5000 3,525.00 0.000 0 066 PLACE HOT MIX ASPHALT SQYD 65.0000 195.00 0.000 0 (MISCELLANEOUS AREA) 067 LIQUID ASPHALT (PRIME COAT) TON 1,167.0000 31,509.00 7.250 8,460 068 TACK COAT TON 924.0000 11,088.00 0.000 0 069 FURNISH 48" STEEL PIPE PILING LF 670.0000 397,980.00 594.000 397,980 070 DRIVE 48" STEEL PIPE PILE EA 150,000.0000 600,000.00 4.000 600,000 071 108" DRIVEN STEEL SHELL LF 2,600.0000 1,562,600.00 298.100 775,060.00 598.990 1,557,374 072 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 130.0000 452,920.00 402.500 52,325 073 96" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 2,800.0000 722,400.00 19.000 53,200.00 146.000 408,800 074 108" CAST-IN-DRILLED-HOLE CONCRETE LF 800.0000 480,800.00 545.200 436,160 PILING 075 PRESTRESSING CAST-IN-PLACE CONCRETE LS 250,000.0000 250,000.00 0.430 107,500 076 TIEBACK ANCHOR EA 1,800.0000 252,000.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 500.0000 125,500.00 80.500 40,250.00 198.000 99,000 (F) 078 STRUCTURAL CONCRETE, BRIDGE CY 1,113.0000 6,833,820.00 3,302.100 3,675,237 (F) 079 STRUCTURAL CONCRETE, RETAINING WALL CY 500.0000 736,500.00 491.000 245,500.00 1,614.000 807,000 (F) 080 STRUCTURAL CONCRETE, APPROACH SLAB CY 350.0000 54,950.00 70.560 24,696 (F) (TYPE N) 081 MINOR CONCRETE CY 700.0000 11,200.00 20.000 14,000 082 ARCHITECTURAL SURFACE (TEXTURE CONCRETE) SQFT 10.0000 151,000.00 3,775.000 37,750.00 13,590.000 135,900 (F) 083 MONUMENT PLAQUES EA 2,500.0000 7,500.00 0.000 0 084 PTFE SPHERICAL BEARING EA 7,500.0000 60,000.00 4.000 30,000 085 JOINT SEAL ASSEMBLY (MR 6") LF 350.0000 45,500.00 51.170 17,909 086 BAR REINFORCING STEEL LB 2.5000 1,400.00 0.000 0 087 BAR REINFORCING STEEL (BRIDGE) LB 0.8000 1,896,000.00 115,000.000 92,000.00 1,366,751.000 1,093,400 (F) 088 BAR REINFORCING STEEL (RETAINING WALL) LB 0.8000 185,720.00 203,461.000 162,768 (F) 089 HEADED BAR REINFORCEMENT EA 75.0000 14,175.00 72.000 5,400 (F) 090 SHOTCRETE CY 460.0000 81,880.00 0.000 0 (F) 091 STRUCTURAL STEEL LB 2.0000 82,000.00 41,000.000 82,000 (F) 092 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 60.00 0.000 0 (0.063"-UNFRAMED) 093 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 1,100.00 0.000 0 (0.080"-FRAMED) 094 ROADSIDE SIGN - ONE POST EA 500.0000 500.00 0.000 0 095 ROADSIDE SIGN - TWO POST EA 750.0000 750.00 0.000 0 096 INSTALL ROADSIDE SIGN EA 450.0000 450.00 0.000 0 (LAMINATED WOOD BOX POST) 097 18" REINFORCED CONCRETE PIPE LF 82.0000 5,412.00 66.000 5,412 098 12" BITUMINOUS COATED CORRUGATED STEEL LF 39.0000 21,450.00 0.000 0 PIPE (.079" THICK) 099 48" BITUMINOUS COATED CORRUGATED STEEL LF 174.0000 41,760.00 80.000 13,920 PIPE (.168" THICK) 100 18" BITUMINOUS COATED CORRUGATED STEEL LF 52.0000 1,872.00 0.000 0 PIPE DOWNDRAIN (.079" THICK) 101 18" BITUMINOUS COATED ENTRANCE TAPER EA 550.0000 550.00 0.000 0 102 36" BITUMINOUS COATED CORRUGATED STEEL EA 750.0000 750.00 0.000 0 PIPE RISER (.138" THICK) 103 WELDED STEEL PIPE CASING (BRIDGE) LF 160.0000 13,760.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 18" BITUMINOUS COATED STEEL FLARED END EA 450.0000 900.00 0.000 0 SECTION 105 48" BITUMINOUS COATED STEEL FLARED END EA 530.0000 530.00 0.000 0 SECTION 106 ROCK SLOPE PROTECTION CY 120.0000 8,400.00 20.100 2,412 (FACING, METHOD B) 107 ROCK SLOPE PROTECTION FABRIC SQYD 4.5000 675.00 48.300 217 108 MINOR CONCRETE (CURB, SIDEWALK AND CY 250.0000 15,000.00 0.000 0 CURB RAMP) 109 MISCELLANEOUS IRON AND STEEL LB 4.5000 2,745.00 0.000 0 110 BRIDGE DECK DRAINAGE SYSTEM LB 5.0000 178,000.00 0.000 0 (F) 111 CHAIN LINK FENCE (TYPE CL-6) LF 26.0000 4,680.00 0.000 0 112 SURVEY MONUMENT (TYPE D) EA 800.0000 4,000.00 0.000 0 113 DELINEATOR (CLASS 1) EA 60.0000 240.00 0.000 0 114 GUARD RAILING DELINEATOR EA 70.0000 980.00 0.000 0 115 OBJECT MARKER (TYPE L) EA 100.0000 200.00 0.000 0 116 METAL BEAM GUARD RAILING LF 23.0000 16,790.00 0.000 0 117 VEGETATION CONTROL (MINOR CONCRETE) SQYD 35.0000 19,250.00 0.000 0 118 TUBULAR HANDRAILING LF 40.0000 55,680.00 0.000 0 (F) 119 TUBULAR BICYCLE RAILING LF 40.0000 53,600.00 0.000 0 (F) 120 TRANSITION RAILING (TYPE WB) EA 3,500.0000 3,500.00 0.000 0 121 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 760.0000 760.00 0.000 0 122 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,900.0000 8,700.00 0.000 0 123 CRASH CUSHION (ADIEM) EA 20,000.0000 40,000.00 0.000 0 124 CONCRETE BARRIER LF 60.0000 43,200.00 0.000 0 (F) (TYPE 80 MODIFIED) 125 CONCRETE BARRIER LF 140.0000 100,800.00 0.000 0 (F) (TYPE 80SW MODIFIED) 126 CONCRETE BARRIER LF 60.0000 39,420.00 0.000 0 (F) (TYPE 80A MODIFIED) 127 CONCRETE BARRIER LF 140.0000 94,080.00 0.000 0 (F) (TYPE 80SWA MODIFIED) 128 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 1,520.00 0.000 0 129 THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 10,350.00 0.000 0 (SPRAYABLE) 130 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 1,600.00 0.000 0 PROGRAM CAS145 PAGE 6 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 PAVEMENT MARKER (REFLECTIVE-RECESSED) EA 20.0000 2,800.00 0.000 0 132 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.540 2,700 SYSTEM ELEMENTS DURING CONSTRUCTION 133 HIGHWAY LIGHTING LS 150,000.0000 150,000.00 0.120 18,000 134 LIGHTING (NAVIGATION) LS 60,000.0000 60,000.00 0.350 21,000 135 INDUCTIVE LOOP DETECTOR EA 7,700.0000 15,400.00 0.000 0 136 BRIDGE FIXTURE LUMINAIRES LS 150,000.0000 150,000.00 0.000 0 PROGRAM CAS145 PAGE 7 DATE 03/26/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 08-378704 TIME 10:44 AM ESTIMATE NO. 25 BID OPENING 10/21/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/13 R.E. NAME: YAP, SIONG DATE OF THIS ESTIMATE 03/26/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,298,010.00 13,415,625.07 ADJUSTMENT OF COMPENSATION 580.00 126,285.28 EXTRA WORK 1,618.13 1,271,605.02 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,300,208.13 14,813,515.37 137 MOBILIZATION LS 2,255,992.0000 2,255,992.00 1.000 2,255,992 ORIGINAL CONTRACT AMOUNT 23,465,093.00 TOTAL WORK COMPLETED 1,300,208.13 17,069,507.37 MATERIALS ON HAND ON SITE 221,865.87 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,300,208.13 17,291,373.24 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/28/11 830 04/11/11 04/11/11 10/15/14 461 13 23 0 68% 54% PROGRESS IS SATISFACTORY YAP, SIONG RESIDENT ENGINEER PROGRAM CAS145 DATE 03/26/13