PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/25/13 EST. NO.04 TIME 07:25 AM R.E. NAME: CARY J. CRUZ 09-349104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/25/13 EST. NO.04 TIME 07:25 AM R.E. NAME: CARY J. CRUZ 09-349104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 09-349104 TIME 07:25 AM ESTIMATE NO. 04 BID OPENING 05/01/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/13 R.E. NAME: CARY J. CRUZ DATE OF THIS ESTIMATE 11/25/13 LOCATION PROGRESS ESTIMATE 09-KER-14-35.4/ .0 ----------------- 09-KER-14-37.3/ .0 TRUESDELL CORPORATION OF IN KERN COUNTY AT VARIOUS LOCATIONS 09-KER-58-R107.6/ .0 CALIFORNIA INC 1310 W. 23RD STREET TEMPE AZ 85282 FED. AID NO. N O N E REHAB FIVE BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.150 75.00 0.850 425 002 PREPARE WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.750 11,250 PROGRAM 003 TEMPORARY DRAINAGE INLET PROTECTION EA 50.0000 300.00 3.000 150 004 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 1.000 500 005 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.200 2,000.00 0.800 8,000 006 TRAFFIC CONTROL SYSTEM LS 102,012.0000 102,012.00 0.200 20,402.40 0.800 81,609 007 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 0.200 600.00 0.800 2,400 008 REMOVE PAINTED TRAFFIC STRIPE LF 0.1000 363.00 0.000 0 009 REMOVE PAVEMENT MARKER EA 0.1000 9.80 0.000 0 010 REMOVE CONCRETE DECK SURFACE SQFT 2.4000 71,882.40 29,735.000 71,364 011 REMOVE CONCRETE DECK SURFACE SQFT 25.0000 107,100.00 3,211.000 80,275 (HYDRODEMO) 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 11.5000 29,440.00 1,694.930 19,491 013 REMOVE UNSOUND CONCRETE CF 10.0000 1,190.00 128.000 1,280 014 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2500 11,149.75 4,284.000 1,071.00 37,275.000 9,318 015 BRIDGE REMOVAL (PORTION) LS 13,000.0000 13,000.00 1.000 13,000 016 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 017 HOT MIX ASPHALT (TYPE A) TON 265.0000 116,600.00 328.040 86,930 018 SHOULDER RUMBLE STRIP STA 1,850.0000 20,350.00 0.000 0 (HMA,GROUND-IN INDENTATIONS) 019 STRUCTURAL CONCRETE, BRIDGE CY 1,200.0000 41,400.00 1.500 1,800 (F) 020 CLEAN EXPANSION JOINT LF 20.0000 3,200.00 0.000 0 021 RAPID SETTING CONCRETE PATCH CF 10.0000 1,150.00 128.000 1,280 022 FURNISH POLYESTER CONCRETE OVERLAY CF 60.0000 226,320.00 227.000 13,620.00 3,223.000 193,380 PROGRAM CAS145 PAGE 2 DATE 11/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 09-349104 TIME 07:25 AM ESTIMATE NO. 04 BID OPENING 05/01/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/13 R.E. NAME: CARY J. CRUZ DATE OF THIS ESTIMATE 11/25/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE POLYESTER CONCRETE OVERLAY SQFT 2.9500 118,929.25 32,991.000 97,323 (F) 024 JOINT SEAL (MR 1") LF 30.0000 4,800.00 0.000 0 025 ROCK SLOPE PROTECTION (2T, METHOD A) CY 145.0000 12,905.00 0.000 0 026 PAINT TRAFFIC STRIPE (2-COAT) LF 2.5000 14,625.00 0.000 0 027 PAVEMENT MARKER (RETROREFLECTIVE) EA 22.0000 1,166.00 0.000 0 028 PAVEMENT MARKER (REFLECTIVE-RECESSED) EA 105.0000 4,305.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 11/25/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 09-349104 TIME 07:25 AM ESTIMATE NO. 04 BID OPENING 05/01/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/13 R.E. NAME: CARY J. CRUZ DATE OF THIS ESTIMATE 11/25/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 37,768.40 684,778.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 37,768.40 684,778.10 029 MOBILIZATION LS 101,840.8000 101,840.80 1.000 101,840 ORIGINAL CONTRACT AMOUNT 1,038,038.00 TOTAL WORK COMPLETED 37,768.40 786,618.90 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 37,768.40 786,618.90 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/19/12 65 09/04/12 09/04/12 12/24/13 40 240 0 0 76% 62% PROGRESS IS SATISFACTORY *** SUSPENDED ON 09/06/12. CARY J. CRUZ RESIDENT ENGINEER PROGRAM CAS145 DATE 11/25/13