PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/21/05 EST. NO.01 TIME 02:15 PM R.E. NAME: BLUM, ALFRED 10-0E5104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/21/05 EST. NO.01 TIME 02:15 PM R.E. NAME: BLUM, ALFRED 10-0E5104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0E5104 TIME 02:15 PM ESTIMATE NO. 01 BID OPENING 12/07/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/05 R.E. NAME: BLUM, ALFRED DATE OF THIS ESTIMATE 04/21/05 LOCATION PROGRESS ESTIMATE 10-TUO-49-14.7/ .0 ----------------- CLAYBORN CONTRACTING IN TUOLUMNE COUNTY AT JAMESTOWN AT INTERSECTION OF ROUTE 49 AND RAWHIDE ROAD AND HUMBUG STREET FED. AID NO. ACST-P049(133)E ,PHG-P049(133)E INSTALL SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 300.0000 300.00 1.000 300.00 1.000 300.00 PROGRAM 02 WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.360 540.00 0.360 540.00 03 TEMPORARY FIBER ROLL M 25.0000 625.00 24.000 600.00 24.000 600.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,000.0000 1,000.00 1.000 1,000.00 1.000 1,000.00 05 CONSTRUCTION AREA SIGNS LS 1,600.0000 1,600.00 0.650 1,040.00 0.650 1,040.00 S) 06 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.360 3,600.00 0.360 3,600.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,500.0000 1,500.00 0.000 0.00 S) 08 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 9.0000 3,150.00 0.000 0.00 S) STRIPE 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 5.0000 280.00 0.000 0.00 S) 10 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 20.0000 420.00 0.000 0.00 S) 11 REMOVE PAVEMENT MARKER EA 5.0000 340.00 0.000 0.00 S) 12 REMOVE ROADSIDE SIGN EA 40.0000 360.00 0.000 0.00 13 ADJUST WATER VALVE COVER TO GRADE EA 200.0000 200.00 0.000 0.00 14 ROADWAY EXCAVATION M3 525.0000 8,400.00 0.000 0.00 15 LEAD COMPLIANCE PLAN LS 3,700.0000 3,700.00 0.000 0.00 16 IMPORTED MATERIAL (SHOULDER BACKING) TONN 1,000.0000 1,800.00 0.000 0.00 17 ASPHALT CONCRETE (TYPE B) TONN 105.0000 13,650.00 0.000 0.00 18 ROADSIDE SIGN - ONE POST EA 140.0000 980.00 0.000 0.00 19 ROADSIDE SIGN - TWO POST EA 220.0000 660.00 0.000 0.00 20 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 90.0000 180.00 0.000 0.00 METHOD) 21 THERMOPLASTIC PAVEMENT MARKING M2 50.0000 2,600.00 0.000 0.00 S) 22 THERMOPLASTIC TRAFFIC STRIPE M 6.0000 3,180.00 0.000 0.00 S) (SPRAYABLE) PROGRAM CAS145 PAGE 2 DATE 04/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0E5104 TIME 02:15 PM ESTIMATE NO. 01 BID OPENING 12/07/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/05 R.E. NAME: BLUM, ALFRED DATE OF THIS ESTIMATE 04/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 480.00 0.000 0.00 S) 24 SIGNAL AND LIGHTING LS 134,216.0000 134,216.00 0.360 48,317.76 0.360 48,317.76 PROGRAM CAS145 PAGE 3 DATE 04/21/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0E5104 TIME 02:15 PM ESTIMATE NO. 01 BID OPENING 12/07/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/05 R.E. NAME: BLUM, ALFRED DATE OF THIS ESTIMATE 04/21/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 55,397.76 55,397.76 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 55,397.76 55,397.76 ORIGINAL CONTRACT AMOUNT 191,121.00 TOTAL WORK COMPLETED 55,397.76 55,397.76 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 55,397.76 55,397.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/23/04 45 03/21/05 03/21/05 06/01/05 16 6 0 0 26% 36% PROGRESS IS SATISFACTORY BLUM, ALFRED RESIDENT ENGINEER PROGRAM CAS145 DATE 04/21/05