PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/24/09 EST. NO.01 TIME 10:00 AM R.E. NAME: KEWAL VIRK 10-0F6504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/24/09 EST. NO.01 TIME 10:00 AM R.E. NAME: KEWAL VIRK 10-0F6504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0F6504 TIME 10:00 AM ESTIMATE NO. 01 BID OPENING 06/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/09 R.E. NAME: KEWAL VIRK DATE OF THIS ESTIMATE 08/24/09 LOCATION PROGRESS ESTIMATE 10-MER-59-22.6/23.3 ----------------- BART KRIEGER PROJECT MANAGER IN MERCED COUNTY ABOUT 10 KM NORTH TEICHERT CONSTRUCTION OF MERCED FROM 0.2 KM SOUTH OF 835 SOUTH KILROY OAKDALE TO 0.5 KM NORTH OF OAKDALE TURLOCK, CA. 95381 ROAD P.O. BOX 3367 TURLOCK, CA. 95381 FED. AID NO. ACHS-S059(48)E ,STP-S059(48)E INTERSECTION REALIGNMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 TEMPORARY FENCE (TYPE ESA) M 10.0000 1,100.00 0.000 0.00 S) 03 CONSTRUCTION SITE MANAGEMENT LS 500.0000 500.00 0.250 125.00 0.250 125.00 04 PREPARE STORM WATER POLLUTION LS 500.0000 500.00 0.000 0.00 S) PREVENTION PLAN 05 TEMPORARY FIBER ROLL M 5.0000 20,000.00 0.000 0.00 06 TEMPORARY CONSTRUCTION ENTRANCE EA 1,000.0000 2,000.00 0.000 0.00 07 STREET SWEEPING LS 5,000.0000 5,000.00 0.250 1,250.00 0.250 1,250.00 08 CONSTRUCTION AREA SIGNS LS 4,100.0000 4,100.00 0.500 2,050.00 0.500 2,050.00 S) 09 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.250 6,250.00 0.250 6,250.00 S) 10 TEMPORARY TRAFFIC STRIPE (PAINT) M 3.4500 5,382.00 800.000 2,760.00 800.000 2,760.00 S) 11 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 150.00 0.000 0.00 S) 12 FLASHING BEACON (PORTABLE) EA 200.0000 600.00 0.000 0.00 S) 13 PORTABLE CHANGEABLE MESSAGE SIGN LS 10,000.0000 10,000.00 0.250 2,500.00 0.250 2,500.00 S) 14 TEMPORARY RAILING (TYPE K) M 40.0000 61,200.00 780.000 31,200.00 780.000 31,200.00 15 TEMPORARY CRASH CUSHION MODULE EA 150.0000 5,850.00 14.000 2,100.00 14.000 2,100.00 S) 16 ABANDON CULVERT EA 800.0000 1,600.00 2.000 1,600.00 2.000 1,600.00 17 REMOVE FENCE (TYPE BW) M 5.1000 11,067.00 880.000 4,488.00 880.000 4,488.00 S) 18 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 4.0000 5,920.00 800.000 3,200.00 800.000 3,200.00 S) STRIPE 19 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 2.0000 3,160.00 0.000 0.00 S) 20 REMOVE PAVEMENT MARKER EA 1.0000 210.00 0.000 0.00 S) 21 REMOVE ROADSIDE SIGN EA 65.0000 325.00 0.000 0.00 22 REMOVE BASE AND SURFACING M3 0.1000 166.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0F6504 TIME 10:00 AM ESTIMATE NO. 01 BID OPENING 06/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/09 R.E. NAME: KEWAL VIRK DATE OF THIS ESTIMATE 08/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 RELOCATE GATE EA 650.0000 650.00 0.000 0.00 24 RELOCATE ROADSIDE SIGN-ONE POST EA 165.0000 330.00 0.000 0.00 25 RELOCATE ROADSIDE SIGN-TWO POST EA 250.0000 500.00 0.000 0.00 26 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 12.0000 3,840.00 0.000 0.00 27 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 0.000 0.00 28 ROADWAY EXCAVATION M3 25.0000 104,250.00 0.000 0.00 29 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.000 0.00 30 SAND BACKFILL M3 200.0000 1,400.00 0.000 0.00 31 IMPORTED BORROW M3 11.3000 102,717.00 0.000 0.00 32 EROSION CONTROL (TYPE D) M2 0.7500 11,025.00 0.000 0.00 S) 33 CLASS 2 AGGREGATE BASE M3 45.0000 163,350.00 0.000 0.00 34 HOT MIX ASPHALT (TYPE A) TONN 77.6000 491,984.00 0.000 0.00 35 METAL CATTLE GUARD (4.9 M) EA 10,000.0000 10,000.00 0.000 0.00 36 FURNISH SINGLE SHEET ALUMINUM SIGN M2 90.0000 990.00 0.000 0.00 (2.0 MM-UNFRAMED) 37 ROADSIDE SIGN - ONE POST EA 250.0000 2,000.00 0.000 0.00 38 ROADSIDE SIGN (TELESPAR POST) EA 200.0000 400.00 0.000 0.00 39 ROADSIDE SIGN - TWO POST EA 425.0000 425.00 0.000 0.00 40 300 MM ALTERNATIVE PIPE CULVERT M 45.0000 2,295.00 0.000 0.00 41 450 MM ALTERNATIVE PIPE CULVERT M 100.0000 2,200.00 0.000 0.00 42 600 MM ALTERNATIVE PIPE CULVERT M 250.0000 17,750.00 21.000 5,250.00 21.000 5,250.00 43 900 MM ALTERNATIVE PIPE CULVERT M 350.0000 12,600.00 20.000 7,000.00 20.000 7,000.00 44 450 MM ALTERNATIVE FLARED END SECTION EA 450.0000 900.00 0.000 0.00 45 600 MM ALTERNATIVE FLARED END SECTION EA 500.0000 2,000.00 0.000 0.00 46 900 MM ALTERNATIVE FLARED END SECTION EA 750.0000 1,500.00 0.000 0.00 47 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 100.0000 2,400.00 0.000 0.00 48 ROCK SLOPE PROTECTION FABRIC M2 6.5000 507.00 0.000 0.00 49 FENCE (TYPE BW, METAL POST) M 12.5000 25,500.00 477.000 5,962.50 477.000 5,962.50 S) PROGRAM CAS145 PAGE 3 DATE 08/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0F6504 TIME 10:00 AM ESTIMATE NO. 01 BID OPENING 06/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/09 R.E. NAME: KEWAL VIRK DATE OF THIS ESTIMATE 08/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 DELINEATOR (CLASS 1) EA 30.0000 2,280.00 0.000 0.00 51 OBJECT MARKER (TYPE P) EA 25.0000 250.00 0.000 0.00 52 THERMOPLASTIC PAVEMENT MARKING M2 65.0000 2,990.00 0.000 0.00 S) 53 THERMOPLASTIC TRAFFIC STRIPE M 1.6500 5,676.00 0.000 0.00 S) (SPRAYABLE) 54 PAINT TRAFFIC STRIPE (2-COAT) M 2.0000 1,940.00 0.000 0.00 S) 55 PAINT PAVEMENT MARKING M2 65.0000 325.00 0.000 0.00 S) 56 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.6000 2,904.00 0.000 0.00 S) 57 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 200.0000 200.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION 58 TRAFFIC MONITORING STATION LS 30,000.0000 30,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 08/24/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0F6504 TIME 10:00 AM ESTIMATE NO. 01 BID OPENING 06/10/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/09 R.E. NAME: KEWAL VIRK DATE OF THIS ESTIMATE 08/24/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 75,735.50 75,735.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 75,735.50 75,735.50 59 MOBILIZATION LS 46,300.0000 46,300.00 0.500 23,150.00 0.500 23,150.00 ORIGINAL CONTRACT AMOUNT 1,227,458.00 TOTAL WORK COMPLETED 98,885.50 98,885.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 98,885.50 98,885.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/21/09 60 08/05/09 08/05/09 10/29/09 8 0 0 0 8% 13% PROGRESS IS SATISFACTORY CCO KEWAL VIRK RESIDENT ENGINEER PROGRAM CAS145 DATE 08/24/09