PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/18 EST. NO. 002 TIME 10:56 AM R.E. NAME: DAVID ABLEDU 10-0G7204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/18 EST. NO. 002 TIME 10:56 AM R.E. NAME: DAVID ABLEDU 10-0G7204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 028 -5,046.80 001 OVERBID ITEM NO. 028 -2,523.40 002 -2,523.40 -7,570.20 TOTAL DEDUCTIONS -2,523.40 -7,570.20 PROGRAM CAS145 PAGE 1 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0G7204 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 10/12/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/18 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 06/18/18 LOCATION PROGRESS ESTIMATE 10-SJ-5-25.8/26.1 ----------------- PETERSON-CHASE GENERAL IN SAN JOAQUIN COUNTY IN STOCKTON ENGINEERING CONSTRUCTION, INC. AT VARIOUS BRIDGE LOCATIONS 16351 CONSTRUCTION CIRCLE WES IRVINE CA 92606 FED. AID NO. ACNH-X077(25)E SEISMIC RETROFIT OF VARIOUS BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION AREA SIGNS LS 17,600.0000 17,600.00 0.675 11,880 002 TRAFFIC CONTROL SYSTEM LS 220,000.0000 220,000.00 0.070 15,400.00 0.210 46,200 003 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 18,000.0000 18,000.00 0.070 1,260.00 0.210 3,780 004 JOB SITE MANAGEMENT LS 12,000.0000 12,000.00 0.070 840.00 0.210 2,520 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.680 680.00 0.750 750 006 STREET SWEEPING LS 3,000.0000 3,000.00 0.070 210.00 0.210 630 007 TEMPORARY CONCRETE WASHOUT LS 6,000.0000 6,000.00 0.000 0 008 BIRD AND BAT EXCLUSION DEVICES LS 12,000.0000 12,000.00 0.040 480.00 0.580 6,960 009 PRUNE EXISTING PLANTS LS 12,000.0000 12,000.00 0.000 0 010 RESET BOULDERS LS 5,000.0000 5,000.00 0.000 0 011 RESET BOULDER FOUNTAIN LS 5,000.0000 5,000.00 0.000 0 012 WOOD MULCH CY 105.0000 11,550.00 0.000 0 013 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,000.0000 4,000.00 0.000 0 014 HYDROMULCH SQFT 0.2000 814.00 0.000 0 015 FIBER ROLLS LF 5.0000 3,150.00 0.000 0 016 HYDROSEED SQFT 0.5000 2,035.00 0.000 0 017 DIAPHRAGM BOLSTER EA 10,000.0000 720,000.00 0.000 0 018 CORE CONCRETE (6") LF 300.0000 135,600.00 80.500 24,150.00 177.380 53,214 019 ACCESS OPENING, SOFFIT EA 2,780.0000 300,240.00 17.000 47,260.00 42.000 116,760 020 BRIDGE REMOVAL (PORTION), LOCATION A LS 15,000.0000 15,000.00 0.250 3,750.00 0.250 3,750 021 BRIDGE REMOVAL (PORTION), LOCATION B LS 26,000.0000 26,000.00 0.080 2,080.00 0.330 8,580 022 BRIDGE REMOVAL (PORTION), LOCATION C LS 5,000.0000 5,000.00 0.500 2,500.00 1.000 5,000 PROGRAM CAS145 PAGE 2 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0G7204 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 10/12/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/18 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 06/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MISCELLANEOUS METAL LB 16.0000 213,120.00 0.000 0 (F) (RESTRAINER - CABLE TYPE) 024 TEMPORARY FENCE (TYPE CL-6) LF 14.0000 35,980.00 50.000 700 025 CHAIN LINK FENCE (TYPE CL-6, LF 115.0000 2,875.00 0.000 0 EXTENSION ARM) 026 REMOVE CHAIN LINK FENCE LF 64.0000 1,600.00 0.000 0 027 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.070 35.00 0.140 70 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/18/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0G7204 TIME 10:56 AM ESTIMATE NO. 002 BID OPENING 10/12/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/18 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 06/18/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 98,645.00 260,794.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 98,645.00 260,794.00 028 MOBILIZATION LS 210,000.0000 210,000.00 0.250 52,500.00 0.750 157,500 ORIGINAL CONTRACT AMOUNT 1,999,064.00 TOTAL WORK COMPLETED 151,145.00 418,294.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -2,523.40 -7,570.20 TOTAL 148,621.60 410,723.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 028 MOBILIZATION 199,906.40 210,000.00 10,093.60 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/18/17 280 01/24/18 00/00/00 03/26/19 93 11 0 0 21% 33% PROGRESS IS SATISFACTORY DAVID ABLEDU RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/18