PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/24/10 EST. NO.03 TIME 10:12 AM R.E. NAME: PAWAN K GARG 10-0H3204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/24/10 EST. NO.03 TIME 10:12 AM R.E. NAME: PAWAN K GARG 10-0H3204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0H3204 TIME 10:12 AM ESTIMATE NO. 03 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: PAWAN K GARG DATE OF THIS ESTIMATE 11/24/10 LOCATION PROGRESS ESTIMATE 10-TUO-108-5.7/6.2 ----------------- GEORGE REED INC. IN TUOLUMNE COUNTY NEAR SONORA P.O. BOX 548 FROM 0.3 KM WEST OF VIA ESTE ROAD SONORA CA 95370 TO 0.4 KM EAST OF VIA ESTE ROAD P.O.BOX 548 SONORA CA 95370 FED. AID NO. HSST-P108(48)E ,P-P108(48)E WIDEN HIGHWAY WITH HOT MIX ASPHALT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 TEMPORARY FENCE (TYPE ESA) M 11.5000 2,990.00 269.000 3,093.50 03 CONSTRUCTION SITE MANAGEMENT LS 1,040.0000 1,040.00 0.500 520.00 0.500 520.00 04 PREPARE STORM WATER POLLUTION LS 520.0000 520.00 1.000 520.00 PREVENTION PLAN 05 TEMPORARY FIBER ROLL M 18.0000 7,380.00 30.000 540.00 06 TEMPORARY SILT FENCE M 9.4000 5,734.00 0.000 0.00 07 STREET SWEEPING LS 9,900.0000 9,900.00 0.500 4,950.00 0.500 4,950.00 08 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 520.0000 520.00 1.000 520.00 1.000 520.00 09 CONSTRUCTION AREA SIGNS LS 5,200.0000 5,200.00 0.750 3,900.00 10 TRAFFIC CONTROL SYSTEM LS 43,000.0000 43,000.00 0.500 21,500.00 11 TEMPORARY TRAFFIC STRIPE (TAPE) M 6.9000 14,007.00 0.000 0.00 12 CHANNELIZER (SURFACE MOUNTED) EA 26.0000 598.00 5.000 130.00 23.000 598.00 13 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,500.0000 1,500.00 0.100 150.00 0.600 900.00 14 TEMPORARY RAILING (TYPE K) M 55.5000 33,300.00 591.000 32,800.50 15 TEMPORARY CRASH CUSHION MODULE EA 49.0000 4,116.00 84.000 4,116.00 16 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 2.7000 3,645.00 652.000 1,760.40 1,350.000 3,645.00 STRIPE 17 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 3.0000 24.00 8.000 24.00 18 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 27.0000 459.00 0.000 0.00 19 REMOVE ROADSIDE SIGN EA 52.0000 104.00 0.000 0.00 20 REMOVE CULVERT M 45.0000 2,205.00 49.000 2,205.00 21 REMOVE DOWNDRAIN M 93.0000 837.00 0.000 0.00 22 RESET MILEPOST MARKER EA 16.0000 16.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 11/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0H3204 TIME 10:12 AM ESTIMATE NO. 03 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: PAWAN K GARG DATE OF THIS ESTIMATE 11/24/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 RELOCATE MAILBOX EA 260.0000 2,600.00 5.000 1,300.00 5.000 1,300.00 24 RELOCATE ROADSIDE SIGN EA 183.0000 1,281.00 0.000 0.00 25 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 9.4000 2,820.00 300.000 2,820.00 26 CLEARING AND GRUBBING LS 6,700.0000 6,700.00 0.150 1,005.00 0.900 6,030.00 27 ROADWAY EXCAVATION M3 37.0000 58,460.00 700.000 25,900.00 1,300.000 48,100.00 28 LEAD COMPLIANCE PLAN LS 3,700.0000 3,700.00 1.000 3,700.00 29 DITCH EXCAVATION M3 91.0000 4,095.00 45.000 4,095.00 45.000 4,095.00 30 DUFF HA 12,500.0000 3,750.00 0.300 3,750.00 0.300 3,750.00 31 EROSION CONTROL (TYPE D) HA 16,000.0000 4,800.00 0.300 4,800.00 0.300 4,800.00 32 CLASS 2 AGGREGATE BASE M3 52.0000 44,200.00 700.000 36,400.00 700.000 36,400.00 33 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 900.0000 4,500.00 0.000 0.00 34 HOT MIX ASPHALT (TYPE B) TONN 90.0000 134,100.00 522.000 46,980.00 700.000 63,000.00 35 PLACE HOT MIX ASPHALT M2 4.0000 1,720.00 0.000 0.00 (MISCELLANEOUS AREA) 36 TACK COAT TONN 1.0000 8.00 0.000 0.00 37 MINOR CONCRETE (MINOR STRUCTURE) M3 555.0000 9,990.00 0.000 0.00 F) 38 FURNISH SINGLE SHEET ALUMINUM SIGN M2 120.0000 432.00 0.000 0.00 (1.6 MM-UNFRAMED) 39 ROADSIDE SIGN - ONE POST EA 313.0000 1,252.00 0.000 0.00 40 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 157.0000 157.00 0.000 0.00 METHOD) 41 450 MM REINFORCED CONCRETE PIPE M 835.0000 21,710.00 8.000 6,680.00 26.000 21,710.00 42 600 MM REINFORCED CONCRETE PIPE M 900.0000 36,900.00 41.000 36,900.00 43 450 MM CORRUGATED STEEL PIPE M 240.0000 2,640.00 10.700 2,568.00 10.700 2,568.00 (2.77 MM THICK) 44 900 MM CORRUGATED STEEL PIPE INLET M 1,390.0000 1,946.00 0.000 0.00 (2.77 MM THICK) 45 450 MM CORRUGATED STEEL PIPE TEE ENERGY M 2,500.0000 3,500.00 0.000 0.00 DISSIPATOR (2.77 MM THICK) 46 600 MM CONCRETE FLARED END SECTION EA 470.0000 470.00 0.000 0.00 47 900 MM PRECAST CONCRETE PIPE INLET M 1,200.0000 7,200.00 0.000 0.00 48 MINOR CONCRETE (BACKFILL) M3 125.0000 1,750.00 10.000 1,250.00 10.000 1,250.00 49 ROCK SLOPE PROTECTION M3 97.0000 4,656.00 0.000 0.00 (FACING, METHOD B) PROGRAM CAS145 PAGE 3 DATE 11/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0H3204 TIME 10:12 AM ESTIMATE NO. 03 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: PAWAN K GARG DATE OF THIS ESTIMATE 11/24/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CONCRETE (DITCH LINING) M3 1,220.0000 21,960.00 26.000 31,720.00 26.000 31,720.00 51 ROCK SLOPE PROTECTION FABRIC M2 1.7000 306.00 0.000 0.00 52 MINOR CONCRETE (GUTTER DEPRESSION) M3 630.0000 7,560.00 0.000 0.00 53 STEEL COVER EA 3,780.0000 3,780.00 0.000 0.00 54 INLET GRATE EA 630.0000 3,780.00 0.000 0.00 55 DELINEATOR (CLASS 1) EA 40.0000 200.00 0.000 0.00 56 MARKER (CULVERT) EA 52.0000 468.00 0.000 0.00 57 OBJECT MARKER (TYPE L) EA 52.0000 52.00 0.000 0.00 58 THERMOPLASTIC TRAFFIC STRIPE M 1.3000 1,261.00 0.000 0.00 (SPRAYABLE) 59 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.6000 2,224.00 1,384.000 2,214.40 60 PAINT PAVEMENT MARKING (2-COAT) M2 42.0000 1,554.00 0.000 0.00 61 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 520.0000 520.00 0.500 260.00 0.500 260.00 SYSTEM ELEMENTS DURING CONSTRUCTION 62 HIGHWAY LIGHTING LS 14,900.0000 14,900.00 0.650 9,685.00 0.650 9,685.00 PROGRAM CAS145 PAGE 4 DATE 11/24/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0H3204 TIME 10:12 AM ESTIMATE NO. 03 BID OPENING 11/04/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: PAWAN K GARG DATE OF THIS ESTIMATE 11/24/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 184,423.40 360,134.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 184,423.40 360,134.40 ORIGINAL CONTRACT AMOUNT 561,247.00 TOTAL WORK COMPLETED 184,423.40 360,134.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 184,423.40 360,134.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/14/09 45 09/07/10 09/07/10 12/31/10 40 0 0 0 60% 89% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO *** SUSPENDED ON 12/22/09. PAWAN K GARG RESIDENT ENGINEER PROGRAM CAS145 DATE 11/24/10