PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/08 EST. NO.04 TIME 02:42 PM R.E. NAME: NOMER GUTIERREZ 10-0J3904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 2,244.01 E.W. @ F.A.(+) 051208 N 0005.0 0002 982.67 051508 N 0006.0 3,226.68 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 3,226.68 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/08 EST. NO.04 TIME 02:42 PM R.E. NAME: NOMER GUTIERREZ 10-0J3904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0J3904 TIME 02:42 PM ESTIMATE NO. 04 BID OPENING 10/02/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/13/08 R.E. NAME: NOMER GUTIERREZ DATE OF THIS ESTIMATE 06/19/08 LOCATION RERUN PROGRESS ESTIMATE 10-SJ-88-9.6/ .0 ----------------------- TEICHERT CONSTRUCTION IN SAN JOAQUIN COUNTY NEAR P O BOX 3367 LOCKEFORD AT HARNEY LANE TURLOCK CA 95381 FED. AID NO. ACST-P088(48)E ,PH-P088(48)E ,STPL-6210(6) INSTALL TRAFFIC SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 1.000 1,000.00 S) PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 1.000 500.00 1.000 500.00 04 CONSTRUCTION AREA SIGNS LS 1,000.0000 1,000.00 0.300 300.00 1.000 1,000.00 S) 05 TRAFFIC CONTROL SYSTEM LS 105,500.0000 105,500.00 0.200 21,100.00 1.000 105,500.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 10,000.0000 10,000.00 0.100 1,000.00 1.000 10,000.00 S) 07 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 16.0000 384.00 9.840 157.44 33.840 541.44 S) 08 REMOVE ROADSIDE SIGN EA 40.0000 120.00 3.000 120.00 3.000 120.00 09 RELOCATE ROADSIDE SIGN EA 100.0000 300.00 3.000 300.00 3.000 300.00 10 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 1.000 10,000.00 11 ROADWAY EXCAVATION M3 142.0000 18,460.00 130.000 18,460.00 12 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 1.000 4,000.00 13 DITCH EXCAVATION M3 100.0000 4,400.00 44.000 4,400.00 14 ASPHALT CONCRETE (TYPE A) TONN 75.0000 35,250.00 4.000 300.00 470.000 35,250.00 15 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 100.0000 1,000.00 10.000 1,000.00 10.000 1,000.00 16 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 100.0000 2,800.00 28.000 2,800.00 28.000 2,800.00 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 145.0000 725.00 5.000 725.00 5.000 725.00 (1.6 MM-UNFRAMED) 18 ROADSIDE SIGN - ONE POST EA 130.0000 260.00 2.000 260.00 2.000 260.00 19 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 80.0000 320.00 4.000 320.00 4.000 320.00 METHOD) 20 600 MM STEEL FLARED END SECTION EA 275.0000 275.00 0.000 0.00 21 DELINEATOR (CLASS 1) EA 30.0000 300.00 10.000 300.00 10.000 300.00 22 THERMOPLASTIC PAVEMENT MARKING M2 80.0000 3,520.00 39.930 3,194.40 39.930 3,194.40 S) PROGRAM CAS145 PAGE 2 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0J3904 TIME 02:42 PM ESTIMATE NO. 04 BID OPENING 10/02/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/13/08 R.E. NAME: NOMER GUTIERREZ DATE OF THIS ESTIMATE 06/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC TRAFFIC STRIPE M 10.0000 2,100.00 441.310 4,413.10 441.310 4,413.10 S) (SPRAYABLE) 24 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 480.00 36.000 720.00 36.000 720.00 S) 25 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 4,000.0000 4,000.00 1.000 4,000.00 1.000 4,000.00 SYSTEM ELEMENTS DURING CONSTRUCTION 26 SIGNAL AND LIGHTING LS 115,000.0000 115,000.00 0.280 32,200.00 1.000 115,000.00 PROGRAM CAS145 PAGE 3 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0J3904 TIME 02:42 PM ESTIMATE NO. 04 BID OPENING 10/02/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/13/08 R.E. NAME: NOMER GUTIERREZ DATE OF THIS ESTIMATE 06/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 73,709.94 323,803.94 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 3,226.68 3,226.68 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 76,936.62 327,030.62 27 MOBILIZATION LS 35,800.0000 35,800.00 1.000 35,800.00 ORIGINAL CONTRACT AMOUNT 358,494.00 TOTAL WORK COMPLETED 76,936.62 362,830.62 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 76,936.62 362,830.62 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/07/07 50 03/14/08 03/24/08 06/19/08 53 5 0 3 79% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO NOMER GUTIERREZ RESIDENT ENGINEER PROGRAM CAS145 DATE 06/19/08