PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/24/07 EST. NO.01 TIME 08:39 AM R.E. NAME: JASWINDER SINGH BAJWA 10-0L3904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/24/07 EST. NO.01 TIME 08:39 AM R.E. NAME: JASWINDER SINGH BAJWA 10-0L3904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L3904 TIME 08:39 AM ESTIMATE NO. 01 BID OPENING 07/24/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/07 R.E. NAME: JASWINDER SINGH BAJWA DATE OF THIS ESTIMATE 12/24/07 LOCATION PROGRESS ESTIMATE 10-SJ-12-13.7/ .0 ----------------- AMLAND IN SAN JOAQUIN COUNTY NEAR LODI AT 3168 KNIGHTS BRIDGE ROAD DAVIS ROAD SAN JOSE CA 95132 FED. AID NO. ACST-P012(97)E ,PHG-P012(97)E ,STPL-6210(4) INSTALL NEW SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,450.0000 1,450.00 0.750 1,087.50 0.750 1,087.50 PROGRAM 02 WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 0.100 300.00 0.100 300.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 750.0000 750.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 0.500 1,750.00 0.500 1,750.00 S) 05 TRAFFIC CONTROL SYSTEM LS 15,000.0000 15,000.00 0.100 1,500.00 0.100 1,500.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 6,000.0000 6,000.00 0.100 600.00 0.100 600.00 S) 07 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 200.0000 4,400.00 0.000 0.00 S) STRIPE 08 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 195.0000 1,170.00 0.000 0.00 S) 09 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 195.0000 3,900.00 0.000 0.00 S) 10 REMOVE PAVEMENT MARKER EA 185.0000 1,665.00 0.000 0.00 S) 11 REMOVE ROADSIDE SIGN EA 100.0000 400.00 0.000 0.00 12 REMOVE ROADSIDE SIGN PANEL EA 100.0000 400.00 0.000 0.00 13 RELOCATE ROADSIDE SIGN EA 200.0000 400.00 0.000 0.00 14 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000.00 15 FURNISH SINGLE SHEET ALUMINUM SIGN M2 170.0000 1,190.00 0.000 0.00 (1.6 MM-UNFRAMED) 16 FURNISH SINGLE SHEET ALUMINUM SIGN M2 200.0000 620.00 0.000 0.00 (2.0 MM-UNFRAMED) 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 250.0000 350.00 0.000 0.00 (1.6 MM-FRAMED) 18 ROADSIDE SIGN - ONE POST EA 350.0000 700.00 0.000 0.00 19 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 150.0000 600.00 0.000 0.00 METHOD) 20 THERMOPLASTIC PAVEMENT MARKING M2 200.0000 7,200.00 0.000 0.00 S) 21 PAVEMENT MARKER (RETROREFLECTIVE) EA 220.0000 1,980.00 0.000 0.00 S) 22 SIGNAL AND LIGHTING LS 165,750.0000 165,750.00 0.100 16,575.00 0.100 16,575.00 PROGRAM CAS145 PAGE 2 DATE 12/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L3904 TIME 08:39 AM ESTIMATE NO. 01 BID OPENING 07/24/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/07 R.E. NAME: JASWINDER SINGH BAJWA DATE OF THIS ESTIMATE 12/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 23,812.50 23,812.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 23,812.50 23,812.50 ORIGINAL CONTRACT AMOUNT 222,425.00 TOTAL WORK COMPLETED 23,812.50 23,812.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 23,812.50 23,812.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/03/07 45 11/27/07 11/27/07 02/22/08 45 0 0 14 11% 69% PROGRESS IS SATISFACTORY CCO JASWINDER SINGH BAJWA RESIDENT ENGINEER PROGRAM CAS145 DATE 12/24/07