PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/24/08 EST. NO.06 TIME 09:54 AM R.E. NAME: JASWINDER SINGH BAJWA 10-0L3904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 6,200.00 E.W. @ L.S.(+) 032508 N 001A 0 6,200.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 6,200.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/24/08 EST. NO.06 TIME 09:54 AM R.E. NAME: JASWINDER SINGH BAJWA 10-0L3904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -5,000.00 05 0.00 -5,000.00 OTHER OUTSTANDING DOCUMENTS MISSING CEM-2402 -10,000.00 05 REC'ED CEM-2402 10,000.00 06 10,000.00 0.00 TOTAL DEDUCTIONS 10,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 06/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L3904 TIME 09:54 AM ESTIMATE NO. 06 BID OPENING 07/24/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/03/08 R.E. NAME: JASWINDER SINGH BAJWA DATE OF THIS ESTIMATE 06/24/08 LOCATION SEMI-FINAL ESTIMATE 10-SJ-12-13.7/ .0 ------------------- AMLAND IN SAN JOAQUIN COUNTY NEAR LODI AT 3168 KNIGHTS BRIDGE ROAD DAVIS ROAD SAN JOSE CA 95132 FED. AID NO. ACST-P012(97)E ,PHG-P012(97)E ,STPL-6210(4) INSTALL NEW SIGNALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,450.0000 1,450.00 1.000 1,450.00 PROGRAM 02 WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 1.000 3,000.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 750.0000 750.00 1.000 750.00 04 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 1.000 3,500.00 S) 05 TRAFFIC CONTROL SYSTEM LS 15,000.0000 15,000.00 1.000 15,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 6,000.0000 6,000.00 1.000 6,000.00 S) 07 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 200.0000 4,400.00 27.000 5,400.00 S) STRIPE 08 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 195.0000 1,170.00 5.000 975.00 S) 09 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 195.0000 3,900.00 19.120 3,728.40 S) 10 REMOVE PAVEMENT MARKER EA 185.0000 1,665.00 10.000 1,850.00 S) 11 REMOVE ROADSIDE SIGN EA 100.0000 400.00 4.000 400.00 12 REMOVE ROADSIDE SIGN PANEL EA 100.0000 400.00 4.000 400.00 13 RELOCATE ROADSIDE SIGN EA 200.0000 400.00 2.000 400.00 14 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 15 FURNISH SINGLE SHEET ALUMINUM SIGN M2 170.0000 1,190.00 6.620 1,125.40 (1.6 MM-UNFRAMED) 16 FURNISH SINGLE SHEET ALUMINUM SIGN M2 200.0000 620.00 3.020 604.00 (2.0 MM-UNFRAMED) 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 250.0000 350.00 1.360 340.00 (1.6 MM-FRAMED) 18 ROADSIDE SIGN - ONE POST EA 350.0000 700.00 2.000 700.00 19 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 150.0000 600.00 4.000 600.00 METHOD) 20 THERMOPLASTIC PAVEMENT MARKING M2 200.0000 7,200.00 36.330 7,266.00 S) 21 PAVEMENT MARKER (RETROREFLECTIVE) EA 220.0000 1,980.00 10.000 2,200.00 S) 22 SIGNAL AND LIGHTING LS 165,750.0000 165,750.00 1.000 165,750.00 PROGRAM CAS145 PAGE 2 DATE 06/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L3904 TIME 09:54 AM ESTIMATE NO. 06 BID OPENING 07/24/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/03/08 R.E. NAME: JASWINDER SINGH BAJWA DATE OF THIS ESTIMATE 06/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 223,438.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 6,200.00 6,200.00 SUBTOTAL AMOUNT EARNED 6,200.00 229,638.80 ORIGINAL CONTRACT AMOUNT 222,425.00 TOTAL WORK COMPLETED 6,200.00 229,638.80 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -5,000.00 TOTAL 16,200.00 224,638.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/03/07 45 11/27/07 11/27/07 04/03/08 45 42 0 0 100% 100% JASWINDER SINGH BAJWA RESIDENT ENGINEER PROGRAM CAS145 DATE 06/24/08