PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/07 EST. NO.01 TIME 01:04 PM R.E. NAME: UPPAL, GURDIP "DANNY" 10-0L7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/07 EST. NO.01 TIME 01:04 PM R.E. NAME: UPPAL, GURDIP "DANNY" 10-0L7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L7104 TIME 01:04 PM ESTIMATE NO. 01 BID OPENING 05/16/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: UPPAL, GURDIP "DANNY" DATE OF THIS ESTIMATE 07/25/07 LOCATION PROGRESS ESTIMATE 10-MER-152-R9.8/10.0 ----------------- GRANITE CONSTRUCTION COMPANY IN MERCED COUNTY NEAR LOS BANOS 2716 GRANITE COURT FROM 0.4 KM WEST OF SAN LUIS FRESNO, CA 93706 FOREBAY BRIDGE TO SAN LUIS FOREBAY BRIDGE FED. AID NO. N O N E WIDEN ASPHALT CONCRETE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 800.0000 800.00 0.000 0.00 02 PREPARE STORM WATER POLLUTION LS 1,600.0000 1,600.00 1.000 1,600.00 1.000 1,600.00 PREVENTION PLAN 03 TEMPORARY CONSTRUCTION ENTRANCE EA 1,400.0000 2,800.00 0.000 0.00 04 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 200.00 0.000 0.00 05 STREET SWEEPING LS 10,000.0000 10,000.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 2,300.0000 2,300.00 0.390 897.00 0.390 897.00 S) 07 TRAFFIC CONTROL SYSTEM LS 52,000.0000 52,000.00 0.140 7,280.00 0.140 7,280.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 0.140 420.00 0.140 420.00 S) 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 18.0000 1,476.00 0.000 0.00 S) 10 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 90.0000 720.00 0.000 0.00 S) 11 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000.00 12 ROADWAY EXCAVATION (MATERIAL CONTAINING M3 95.0000 53,200.00 545.000 51,775.00 545.000 51,775.00 NATURALLY OCCURRING ASBESTOS) 13 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000.00 14 EROSION CONTROL (TYPE D) M2 2.0000 5,000.00 0.000 0.00 S) 15 CLASS 2 AGGREGATE BASE M3 92.0000 59,800.00 641.000 58,972.00 641.000 58,972.00 16 ASPHALT CONCRETE (TYPE B) TONN 125.0000 57,500.00 0.000 0.00 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 2,400.0000 7,440.00 0.000 0.00 (2.0 MM-UNFRAMED) 18 ROADSIDE SIGN - ONE POST EA 220.0000 1,320.00 0.000 0.00 19 450 MM REINFORCED CONCRETE PIPE M 200.0000 24,000.00 118.000 23,600.00 118.000 23,600.00 20 450 MM CONCRETE FLARED END SECTION EA 600.0000 1,200.00 2.000 1,200.00 2.000 1,200.00 21 900 MM PRECAST CONCRETE PIPE INLET M 1,100.0000 1,540.00 1.400 1,540.00 1.400 1,540.00 22 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 850.0000 2,550.00 3.000 2,550.00 3.000 2,550.00 PROGRAM CAS145 PAGE 2 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L7104 TIME 01:04 PM ESTIMATE NO. 01 BID OPENING 05/16/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: UPPAL, GURDIP "DANNY" DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROCK SLOPE PROTECTION FABRIC M2 25.0000 300.00 12.000 300.00 12.000 300.00 24 MISCELLANEOUS IRON AND STEEL KG 8.0000 1,496.00 0.000 0.00 F) 25 DELINEATOR (CLASS 1) EA 36.0000 324.00 0.000 0.00 26 THERMOPLASTIC PAVEMENT MARKING M2 240.0000 2,880.00 0.000 0.00 S) 27 THERMOPLASTIC TRAFFIC STRIPE M 3.0000 2,790.00 0.000 0.00 S) (SPRAYABLE) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.0000 392.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L7104 TIME 01:04 PM ESTIMATE NO. 01 BID OPENING 05/16/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: UPPAL, GURDIP "DANNY" DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 157,134.00 157,134.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 157,134.00 157,134.00 29 MOBILIZATION LS 30,000.0000 30,000.00 0.950 28,500.00 0.950 28,500.00 ORIGINAL CONTRACT AMOUNT 333,628.00 TOTAL WORK COMPLETED 185,634.00 185,634.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 185,634.00 185,634.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/07 70 07/09/07 07/09/07 10/17/07 10 0 0 0 56% 14% PROGRESS IS SATISFACTORY UPPAL, GURDIP "DANNY" RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/07