PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/07 EST. NO.02 TIME 08:33 AM R.E. NAME: UPPAL, GURDIP "DANNY" 10-0L7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/07 EST. NO.02 TIME 08:33 AM R.E. NAME: UPPAL, GURDIP "DANNY" 10-0L7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L7104 TIME 08:33 AM ESTIMATE NO. 02 BID OPENING 05/16/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: UPPAL, GURDIP "DANNY" DATE OF THIS ESTIMATE 08/21/07 LOCATION PROGRESS ESTIMATE 10-MER-152-R9.8/10.0 ----------------- GRANITE CONSTRUCTION COMPANY IN MERCED COUNTY NEAR LOS BANOS 2716 GRANITE COURT FROM 0.4 KM WEST OF SAN LUIS FRESNO, CA 93706 FOREBAY BRIDGE TO SAN LUIS FOREBAY BRIDGE FED. AID NO. N O N E WIDEN ASPHALT CONCRETE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 800.0000 800.00 1.000 800.00 1.000 800.00 02 PREPARE STORM WATER POLLUTION LS 1,600.0000 1,600.00 1.000 1,600.00 PREVENTION PLAN 03 TEMPORARY CONSTRUCTION ENTRANCE EA 1,400.0000 2,800.00 0.000 0.00 04 TEMPORARY DRAINAGE INLET PROTECTION EA 200.0000 200.00 1.000 200.00 1.000 200.00 05 STREET SWEEPING LS 10,000.0000 10,000.00 0.750 7,500.00 0.750 7,500.00 06 CONSTRUCTION AREA SIGNS LS 2,300.0000 2,300.00 0.360 828.00 0.750 1,725.00 S) 07 TRAFFIC CONTROL SYSTEM LS 52,000.0000 52,000.00 0.610 31,720.00 0.750 39,000.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 3,000.0000 3,000.00 0.610 1,830.00 0.750 2,250.00 S) 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 18.0000 1,476.00 82.000 1,476.00 82.000 1,476.00 S) 10 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 90.0000 720.00 8.000 720.00 8.000 720.00 S) 11 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000.00 12 ROADWAY EXCAVATION (MATERIAL CONTAINING M3 95.0000 53,200.00 15.000 1,425.00 560.000 53,200.00 NATURALLY OCCURRING ASBESTOS) 13 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 14 EROSION CONTROL (TYPE D) M2 2.0000 5,000.00 2,500.000 5,000.00 2,500.000 5,000.00 S) 15 CLASS 2 AGGREGATE BASE M3 92.0000 59,800.00 9.000 828.00 650.000 59,800.00 16 ASPHALT CONCRETE (TYPE B) TONN 125.0000 57,500.00 487.820 60,977.50 487.820 60,977.50 17 FURNISH SINGLE SHEET ALUMINUM SIGN M2 2,400.0000 7,440.00 3.100 7,440.00 3.100 7,440.00 (2.0 MM-UNFRAMED) 18 ROADSIDE SIGN - ONE POST EA 220.0000 1,320.00 6.000 1,320.00 6.000 1,320.00 19 450 MM REINFORCED CONCRETE PIPE M 200.0000 24,000.00 118.000 23,600.00 20 450 MM CONCRETE FLARED END SECTION EA 600.0000 1,200.00 2.000 1,200.00 21 900 MM PRECAST CONCRETE PIPE INLET M 1,100.0000 1,540.00 1.400 1,540.00 22 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 850.0000 2,550.00 3.000 2,550.00 PROGRAM CAS145 PAGE 2 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L7104 TIME 08:33 AM ESTIMATE NO. 02 BID OPENING 05/16/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: UPPAL, GURDIP "DANNY" DATE OF THIS ESTIMATE 08/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROCK SLOPE PROTECTION FABRIC M2 25.0000 300.00 12.000 300.00 24 MISCELLANEOUS IRON AND STEEL KG 8.0000 1,496.00 187.000 1,496.00 187.000 1,496.00 F) 25 DELINEATOR (CLASS 1) EA 36.0000 324.00 9.000 324.00 9.000 324.00 26 THERMOPLASTIC PAVEMENT MARKING M2 240.0000 2,880.00 11.700 2,808.00 11.700 2,808.00 S) 27 THERMOPLASTIC TRAFFIC STRIPE M 3.0000 2,790.00 936.000 2,808.00 936.000 2,808.00 S) (SPRAYABLE) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.0000 392.00 58.000 406.00 58.000 406.00 S) PROGRAM CAS145 PAGE 3 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0L7104 TIME 08:33 AM ESTIMATE NO. 02 BID OPENING 05/16/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: UPPAL, GURDIP "DANNY" DATE OF THIS ESTIMATE 08/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 129,906.50 287,040.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 129,906.50 287,040.50 29 MOBILIZATION LS 30,000.0000 30,000.00 0.050 1,500.00 1.000 30,000.00 ORIGINAL CONTRACT AMOUNT 333,628.00 TOTAL WORK COMPLETED 131,406.50 317,040.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 131,406.50 317,040.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/07 70 07/09/07 07/09/07 10/17/07 31 0 0 0 94% 44% PROGRESS IS SATISFACTORY UPPAL, GURDIP "DANNY" RESIDENT ENGINEER PROGRAM CAS145 DATE 08/21/07