PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/25/07 EST. NO.02 TIME 08:01 AM R.E. NAME: BAL BAHADUR PAUL 10-0M3304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/25/07 EST. NO.02 TIME 08:01 AM R.E. NAME: BAL BAHADUR PAUL 10-0M3304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0M3304 TIME 08:01 AM ESTIMATE NO. 02 BID OPENING 03/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: BAL BAHADUR PAUL DATE OF THIS ESTIMATE 07/25/07 LOCATION PROGRESS ESTIMATE 10-SJ-88-0.0/5.2 ----------------- 10-SJ-99-7.0/10.0 GEORGE REED INC. IN SAN JOAQUIN COUNTY NEAR STOCKTON 686 EAST LOCKEFORD STREET AND MANTECA AT VARIOUS LOCATIONS LODI CA 95240 FED. AID NO. N O N E RESURFACE HIGHWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 13,250.0000 13,250.00 0.750 9,937.50 1.000 13,250.00 02 PREPARE WATER POLLUTION CONTROL LS 750.0000 750.00 1.000 750.00 PROGRAM 03 TEMPORARY DRAINAGE INLET PROTECTION EA 685.0000 4,795.00 7.000 4,795.00 7.000 4,795.00 04 STREET SWEEPING LS 26,000.0000 26,000.00 1.000 26,000.00 1.000 26,000.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 525.0000 525.00 1.000 525.00 1.000 525.00 06 CONSTRUCTION AREA SIGNS LS 7,500.0000 7,500.00 0.200 1,500.00 0.700 5,250.00 S) 07 TRAFFIC CONTROL SYSTEM LS 118,500.0000 118,500.00 0.750 88,875.00 1.000 118,500.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 6,450.0000 6,450.00 0.750 4,837.50 1.000 6,450.00 S) 09 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 48.0000 17,760.00 14.000 672.00 314.000 15,072.00 S) 10 ADJUST FRAME AND COVER TO GRADE EA 600.0000 9,000.00 8.000 4,800.00 8.000 4,800.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 9.0000 99,900.00 -106.000 -954.00 8,219.000 73,971.00 S) 12 LEAD COMPLIANCE PLAN LS 1,600.0000 1,600.00 1.000 1,600.00 1.000 1,600.00 13 IMPORTED MATERIAL (SHOULDER BACKING) TONN 48.0000 27,360.00 712.500 34,200.00 712.500 34,200.00 14 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 650.0000 9,750.00 10.200 6,630.00 10.200 6,630.00 15 RUBBERIZED ASPHALT CONCRETE (TYPE O) TONN 90.0000 1,170,000.00 9,778.000 880,020.00 12,578.000 1,132,020.00 16 ASPHALTIC EMULSION (PAINT BINDER) TONN 600.0000 48,000.00 58.300 34,980.00 58.300 34,980.00 17 THERMOPLASTIC PAVEMENT MARKING M2 45.0000 16,650.00 314.000 14,130.00 314.000 14,130.00 S) 18 THERMOPLASTIC TRAFFIC STRIPE M 0.7500 45,525.00 54,950.000 41,212.50 54,950.000 41,212.50 S) (SPRAYABLE) 19 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 19,760.00 1,575.000 6,300.00 1,575.000 6,300.00 S) PROGRAM CAS145 PAGE 2 DATE 07/25/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0M3304 TIME 08:01 AM ESTIMATE NO. 02 BID OPENING 03/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/07 R.E. NAME: BAL BAHADUR PAUL DATE OF THIS ESTIMATE 07/25/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 1,160,060.50 1,540,435.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 1,160,060.50 1,540,435.50 ORIGINAL CONTRACT AMOUNT 1,643,075.00 TOTAL WORK COMPLETED 1,160,060.50 1,540,435.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,160,060.50 1,540,435.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/03/07 45 05/31/07 05/18/07 07/27/07 45 0 0 0 92% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO BAL BAHADUR PAUL RESIDENT ENGINEER PROGRAM CAS145 DATE 07/25/07