PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/21/09 EST. NO.06 TIME 12:37 PM R.E. NAME: SINGH MANJIT 10-0N3004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/21/09 EST. NO.06 TIME 12:37 PM R.E. NAME: SINGH MANJIT 10-0N3004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -5,000.00 04 REC'ED PAYROLLS 5,000.00 05 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 01/21/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N3004 TIME 12:37 PM ESTIMATE NO. 06 BID OPENING 05/07/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/09 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 01/21/09 LOCATION PROGRESS ESTIMATE 10-SJ-5-R11.8/39.6 ----------------- CALIFORNIA ENGINEERING IN SAN JOAQUIN COUNTY AT VARIOUS CONTRACTORS INC LOCATIONS FROM OLD US 50 20 HAPPY VALLEY ROAD OVERCROSSING TO ROUTE 5/12 PLEASANTON CA 94566 SEPARATION FED. AID NO. N O N E REPLACE JOINTS AND APPROACH SLABS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 0.100 100.00 1.000 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 S) PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.100 100.00 1.000 1,000.00 04 CONSTRUCTION AREA SIGNS LS 2,000.0000 2,000.00 0.900 1,800.00 S) 05 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.100 5,000.00 1.000 50,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,000.0000 1,000.00 0.100 100.00 1.000 1,000.00 S) 07 REMOVE UNSOUND CONCRETE CF 200.0000 1,600.00 10.640 2,128.00 08 BRIDGE REMOVAL (PORTION), LOCATION A LS 2,000.0000 2,000.00 1.000 2,000.00 09 BRIDGE REMOVAL (PORTION), LOCATION B LS 7,000.0000 7,000.00 1.000 7,000.00 10 BRIDGE REMOVAL (PORTION), LOCATION C LS 7,000.0000 7,000.00 1.000 7,000.00 11 BRIDGE REMOVAL (PORTION), LOCATION D LS 2,000.0000 2,000.00 1.000 2,000.00 12 BRIDGE REMOVAL (PORTION), LOCATION E LS 2,000.0000 2,000.00 1.000 2,000.00 13 BRIDGE REMOVAL (PORTION), LOCATION F LS 2,000.0000 2,000.00 1.000 2,000.00 14 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 S) 15 AGGREGATE BASE (APPROACH SLAB) CY 250.0000 4,125.00 11.240 2,810.00 16 STRUCTURAL CONCRETE, BRIDGE CY 6,000.0000 85,200.00 1.600 9,600.00 11.800 70,800.00 F) 17 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,700.0000 280,500.00 170.350 289,595.00 (TYPE R) 18 PAVING NOTCH EXTENSION CY 1,500.0000 7,050.00 4.160 6,240.00 19 CLEAN EXPANSION JOINT LF 20.0000 26,620.00 1,642.630 32,852.60 20 RAPID SETTING CONCRETE (PATCH) CF 150.0000 1,200.00 9.200 1,380.00 21 JOINT SEAL (MR 1/2") LF 25.0000 6,900.00 327.330 8,183.25 S) 22 JOINT SEAL (MR 1") LF 35.0000 24,745.00 129.000 4,515.00 908.190 31,786.65 S) PROGRAM CAS145 PAGE 2 DATE 01/21/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N3004 TIME 12:37 PM ESTIMATE NO. 06 BID OPENING 05/07/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/09 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 01/21/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 JOINT SEAL (MR 1 1/2") LF 45.0000 27,990.00 91.580 4,121.10 508.520 22,883.40 S) 24 JOINT SEAL ASSEMBLY (MR 4") LF 600.0000 87,000.00 31.420 18,852.00 143.170 85,902.00 S) 25 BAR REINFORCING STEEL (BRIDGE) LB 2.5000 3,055.00 225.000 562.50 334.000 835.00 SF) 26 CONCRETE BARRIER (TYPE 9B MODIFIED) LF 750.0000 3,000.00 2.000 1,500.00 2.000 1,500.00 F) 27 THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 217.00 0.000 0.00 (SPRAYABLE) 28 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 138.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 01/21/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N3004 TIME 12:37 PM ESTIMATE NO. 06 BID OPENING 05/07/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/09 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 01/21/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 44,450.60 635,445.90 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 41,190.36 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 44,450.60 676,636.26 29 MOBILIZATION LS 70,000.0000 70,000.00 1.000 70,000.00 ORIGINAL CONTRACT AMOUNT 708,340.00 TOTAL WORK COMPLETED 44,450.60 746,636.26 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 44,450.60 746,636.26 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/10/08 115 06/25/08 06/25/08 01/31/09 117 18 7 0 83% 96% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO SINGH MANJIT RESIDENT ENGINEER PROGRAM CAS145 DATE 01/21/09