PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/21/08 EST. NO.01 TIME 10:20 AM R.E. NAME: SINGH MANJIT 10-0N3604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/21/08 EST. NO.01 TIME 10:20 AM R.E. NAME: SINGH MANJIT 10-0N3604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N3604 TIME 10:20 AM ESTIMATE NO. 01 BID OPENING 05/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 07/21/08 LOCATION PROGRESS ESTIMATE 10-SJ-4-R15.7/ .0 ----------------- VICTORY ENGINEERS INC IN SAN JOAQUIN COUNTY IN STOCKTON 575 EAST ALLUVIAL AVE NO 106 AT GARFIELD STREET OVERHEAD FRESNO CA 93720 FED. AID NO. N O N E RECONSTRUCT BRIDGE ABUTMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 0.080 200.00 0.080 200.00 02 PREPARE WATER POLLUTION CONTROL LS 650.0000 650.00 0.750 487.50 0.750 487.50 S) PROGRAM 03 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,000.0000 1,000.00 0.080 80.00 0.080 80.00 04 CONSTRUCTION AREA SIGNS LS 1,500.0000 1,500.00 0.200 300.00 0.200 300.00 S) 05 TRAFFIC CONTROL SYSTEM LS 10,000.0000 10,000.00 0.080 800.00 0.080 800.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 6,000.0000 6,000.00 0.080 480.00 0.080 480.00 S) 07 BRIDGE REMOVAL (PORTION) LS 15,000.0000 15,000.00 0.500 7,500.00 0.500 7,500.00 08 ASBESTOS HEALTH AND SAFETY PLAN LS 1,500.0000 1,500.00 0.500 750.00 0.500 750.00 09 ASBESTOS SURVEY LS 1,000.0000 1,000.00 0.500 500.00 0.500 500.00 10 STRUCTURAL CONCRETE, BRIDGE CY 1,350.0000 47,250.00 0.000 0.00 F) 11 DRILL AND BOND DOWEL LF 32.5000 16,900.00 0.000 0.00 12 BAR REINFORCING STEEL (BRIDGE) LB 1.9000 11,020.00 0.000 0.00 F) 13 SLOPE PAVING (CONCRETE) (PORTION) CF 75.0000 6,000.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 07/21/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N3604 TIME 10:20 AM ESTIMATE NO. 01 BID OPENING 05/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/08 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 07/21/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 11,097.50 11,097.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 11,097.50 11,097.50 14 MOBILIZATION LS 6,350.0000 6,350.00 0.500 3,175.00 0.500 3,175.00 ORIGINAL CONTRACT AMOUNT 126,670.00 TOTAL WORK COMPLETED 14,272.50 14,272.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 14,272.50 14,272.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/20/08 60 07/07/08 07/07/08 08/29/08 10 0 0 0 11% 17% PROGRESS IS SATISFACTORY SINGH MANJIT RESIDENT ENGINEER PROGRAM CAS145 DATE 07/21/08