PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/10/10 EST. NO.06 TIME 10:08 AM R.E. NAME: WAZIRI, MOHAMMAD 10-0N4104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0032 52.26 E.W. @ F.A.(+) 100209 Y 0018.1 0033 52.26 100509 Y 0019.1 0034 52.26 100609 Y 0020.1 0035 109.30 102609 Y 0021.1 0036 43.88 102709 Y 0022.1 0037 13.50 102809 Y 0023.1 0038 40.50 103009 Y 0024.1 004 0010 7,674.69 E.W. @ F.A.(+) 100209 Y 0040.0 0011 6.75 110509 Y 0026.1 0012 1,564.00 111009 Y 0041.0 0013 1,334.00 111609 Y 0042.0 005 0001 4,150.64 E.W. @ L.S.(+) 093009 Y 0001.0 15,094.04 TOTAL THIS ESTIMATE 93,094.43 TOTAL PREVIOUS ESTIMATE 108,188.47 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/10/10 EST. NO.06 TIME 10:08 AM R.E. NAME: WAZIRI, MOHAMMAD 10-0N4104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING CEM-4401 -5,000.00 04 REC'ED CEM-4401 5,000.00 05 0.00 0.00 LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -10,000.00 03 MISSING PAYROLLS -5,000.00 04 REC'ED PAYROLLS 10,000.00 04 REC'ED PAYROLLS 5,000.00 06 5,000.00 0.00 TOTAL DEDUCTIONS 5,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 02/10/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N4104 TIME 10:08 AM ESTIMATE NO. 06 BID OPENING 04/22/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/24/09 R.E. NAME: WAZIRI, MOHAMMAD DATE OF THIS ESTIMATE 02/10/10 LOCATION SEMI-FINAL ESTIMATE 10-SJ-5-0.3/6.4 ------------------- C C MYERS INC IN SAN JOAQUIN COUNTY ABOUT 7 MILES P O BOX 2948 SOUTH OF LATHROP FROM GAFFERY ROAD RANCHO CORDOVA CA 957426811 UNDERCROSSING TO ROUTE 5/33 SEPARATION AND OVERHEAD FED. AID NO. N O N E TREAT BRIDGE DECKS METHACRYLATE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 500.00 2.000 500.00 02 CONSTRUCTION SITE MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000.00 03 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 0.900 450.00 PROGRAM 04 STREET SWEEPING LS 1,200.0000 1,200.00 1.000 1,200.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 1.000 500.00 06 CONSTRUCTION AREA SIGNS LS 1,000.0000 1,000.00 1.000 1,000.00 07 TRAFFIC CONTROL SYSTEM LS 55,000.0000 55,000.00 1.000 55,000.00 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,500.0000 2,500.00 1.000 2,500.00 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.8700 9,657.00 12,961.700 11,276.68 10 REMOVE PAVEMENT MARKER EA 1.0000 150.00 863.000 863.00 11 REMOVE UNSOUND CONCRETE CF 59.0000 21,358.00 0.600 35.40 12 CLEAN BRIDGE DECK SQFT 0.1600 23,428.80 140,612.000 22,497.92 13 LEAD COMPLIANCE PLAN LS 2,750.0000 2,750.00 1.000 2,750.00 14 AGGREGATE BASE (APPROACH SLAB) CY 80.0000 1,680.00 0.000 0.00 15 STRUCTURAL CONCRETE, APPROACH SLAB CY 925.0000 188,700.00 222.100 205,442.50 (TYPE R) 16 PAVING NOTCH EXTENSION CY 2,200.0000 12,100.00 3.100 6,820.00 17 CLEAN EXPANSION JOINT LF 6.0000 3,618.00 591.500 3,549.00 18 RAPID SETTING CONCRETE (PATCH) CF 80.0000 28,960.00 0.600 48.00 19 REMOVE EPOXY CHIP SEAL SQFT 0.7100 94,401.60 132,960.000 94,401.60 F) 20 CORE TREATED BRIDGE DECK EA 60.0000 3,720.00 0.000 0.00 21 JOINT SEAL (MR 1/2") LF 16.0000 1,600.00 102.000 1,632.00 22 JOINT SEAL (MR 1") LF 20.0000 5,960.00 175.000 3,500.00 PROGRAM CAS145 PAGE 2 DATE 02/10/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N4104 TIME 10:08 AM ESTIMATE NO. 06 BID OPENING 04/22/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/24/09 R.E. NAME: WAZIRI, MOHAMMAD DATE OF THIS ESTIMATE 02/10/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 JOINT SEAL (MR 1 1/2") LF 42.0000 8,610.00 193.500 8,127.00 24 TREAT BRIDGE DECK SQFT 0.1600 23,428.80 146,430.000 23,428.80 F) 25 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 68.0000 110,500.00 2,088.000 141,984.00 26 THERMOPLASTIC TRAFFIC STRIPE LF 0.5600 6,216.00 11,591.000 6,490.96 (SPRAYABLE) 27 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.7800 867.00 188.000 1,086.64 28 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 02/10/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N4104 TIME 10:08 AM ESTIMATE NO. 06 BID OPENING 04/22/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/24/09 R.E. NAME: WAZIRI, MOHAMMAD DATE OF THIS ESTIMATE 02/10/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 597,083.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 15,094.04 108,188.47 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 15,094.04 705,271.97 29 MOBILIZATION LS 67,000.0000 67,000.00 1.000 67,000.00 ORIGINAL CONTRACT AMOUNT 677,905.20 TOTAL WORK COMPLETED 15,094.04 772,271.97 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 5,000.00 0.00 TOTAL 20,094.04 772,271.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/16/09 70 07/06/09 07/01/09 11/24/09 84 5 16 1 100% 100% WAZIRI, MOHAMMAD RESIDENT ENGINEER PROGRAM CAS145 DATE 02/10/10