PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/24/08 EST. NO.03 TIME 10:40 AM R.E. NAME: SINGH MANJIT 10-0N4804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/24/08 EST. NO.03 TIME 10:40 AM R.E. NAME: SINGH MANJIT 10-0N4804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 013 -750.00 02 0.00 -750.00 TOTAL DEDUCTIONS 0.00 -750.00 PROGRAM CAS145 PAGE 1 DATE 11/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N4804 TIME 10:40 AM ESTIMATE NO. 03 BID OPENING 04/30/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 11/24/08 LOCATION PROGRESS ESTIMATE 10-SJ-5-R22.5/25.4 ----------------- DEBRUIN CONSTRUCTION INC IN SAN JOAQUIN COUNTY IN STOCKTON P O BOX 1355 AT VARIOUS LOCATIONS FROM FRENCH FRENCH CAMP CA 95231 CAMP TURNPIKE UNDERCROSSING TO CHARTER WAY UNDERCROSSING FED. AID NO. N O N E GRIND DECKS AND SEAL JOINTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 750.0000 750.00 0.130 97.50 0.950 712.50 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.750 750.00 PROGRAM 03 STREET SWEEPING LS 500.0000 500.00 0.630 315.00 0.950 475.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 0.130 65.00 0.950 475.00 05 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.100 250.00 0.900 2,250.00 S) 06 TRAFFIC CONTROL SYSTEM LS 30,000.0000 30,000.00 0.130 3,900.00 0.950 28,500.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,800.0000 2,800.00 0.130 364.00 0.950 2,660.00 S) 08 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.6500 3,052.50 1,850.000 3,052.50 S) STRIPE 09 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.2000 7,008.00 5,840.000 7,008.00 S) 10 REMOVE PAVEMENT MARKER EA 1.0000 140.00 140.000 140.00 11 REMOVE UNSOUND CONCRETE CF 125.0000 1,500.00 20.500 2,562.50 55.500 6,937.50 12 CLEAN BRIDGE DECK SQFT 0.1000 9,978.10 23,174.000 2,317.40 99,781.000 9,978.10 13 LEAD COMPLIANCE PLAN LS 2,750.0000 2,750.00 1.000 2,750.00 14 CLEAN EXPANSION JOINT LF 10.5000 15,246.00 1,343.500 14,106.75 1,343.500 14,106.75 15 RAPID SETTING CONCRETE (PATCH) CF 150.0000 1,800.00 20.500 3,075.00 55.500 8,325.00 16 GRIND EPOXY GRIT OVERLAY AND CONCRETE SQFT 0.8500 84,813.85 2,310.000 1,963.50 102,091.000 86,777.35 S) DECK SURFACE 17 CORE TREATED BRIDGE DECK EA 90.0000 6,120.00 32.000 2,880.00 32.000 2,880.00 S) 18 JOINT SEAL (MR 1/2") LF 20.0000 18,360.00 773.000 15,460.00 773.000 15,460.00 S) 19 JOINT SEAL (MR 1") LF 20.0000 10,680.00 483.500 9,670.00 483.500 9,670.00 S) 20 TREAT BRIDGE DECK SQFT 0.1200 11,973.72 29,816.000 3,577.92 99,781.000 11,973.72 F) 21 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 75.0000 85,200.00 640.000 48,000.00 1,437.000 107,775.00 22 THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 8,459.00 7,690.000 8,459.00 7,690.000 8,459.00 S) (SPRAYABLE) PROGRAM CAS145 PAGE 2 DATE 11/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N4804 TIME 10:40 AM ESTIMATE NO. 03 BID OPENING 04/30/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 11/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVEMENT MARKER (RETROREFLECTIVE) EA 12.0000 1,680.00 140.000 1,680.00 140.000 1,680.00 24 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 250.0000 250.00 1.000 250.00 1.000 250.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 11/24/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0N4804 TIME 10:40 AM ESTIMATE NO. 03 BID OPENING 04/30/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/08 R.E. NAME: SINGH MANJIT DATE OF THIS ESTIMATE 11/24/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 118,993.57 333,045.42 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 118,993.57 333,045.42 25 MOBILIZATION LS 7,500.0000 7,500.00 1.000 7,500.00 ORIGINAL CONTRACT AMOUNT 314,561.17 TOTAL WORK COMPLETED 118,993.57 340,545.42 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -750.00 TOTAL 118,993.57 339,795.42 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 013 LEAD COMPLIANCE PLAN 2,000.00 2,750.00 750.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/02/08 40 06/17/08 06/17/08 11/30/08 40 0 0 0 96% 100% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO SINGH MANJIT RESIDENT ENGINEER PROGRAM CAS145 DATE 11/24/08