PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/19 EST. NO. 005 TIME 01:33 PM R.E. NAME: DAVID ABLEDU 10-0Q1804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 006 0001 80,462.00 E.W. @ L.S.(+) 111818 N 1001 0 80,462.00 TOTAL THIS ESTIMATE 26,664.00 TOTAL PREVIOUS ESTIMATE 107,126.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/19 EST. NO. 005 TIME 01:33 PM R.E. NAME: DAVID ABLEDU 10-0Q1804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING CEM-4401 -10,000.00 004 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 03/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0Q1804 TIME 01:33 PM ESTIMATE NO. 005 BID OPENING 07/03/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/19 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 03/22/19 LOCATION PROGRESS ESTIMATE 10-SJ-88-16.4/25.4 ----------------- GEORGE REED, INC. IN SAN JOAQUIN COUNTY AT AND NEAR 140 EMPIRE AVE CLEMENTS FROM 0.1 MILE EAST OF MODESTO CA 95354 DISCH ROAD TO AMADOR COUNTY LINE FED. AID NO. ACNH-P088(70)E DIGOUT AND REPAIR OF LOCALIZED ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500 002 CONSTRUCTION AREA SIGNS LS 7,500.0000 7,500.00 0.670 5,025 003 TRAFFIC CONTROL SYSTEM LS 1,150,000.0000 1,150,000.00 0.740 851,000 004 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 1,800.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.740 14,800 006 TEMPORARY RAILING (TYPE K) LF 15.0000 39,000.00 0.000 0 007 TEMPORARY ALTERNATIVE CRASH CUSHION EA 4,500.0000 36,000.00 0.000 0 SYSTEM 008 TEMPORARY TRAFFIC SCREEN LF 17.0000 44,200.00 0.000 0 009 JOB SITE MANAGEMENT LS 18,500.0000 18,500.00 0.740 13,690 010 PREPARE WATER POLLUTION CONTROL PROGRAM LS 830.0000 830.00 0.750 622 011 TEMPORARY SILT FENCE LF 2.0000 106,800.00 0.000 0 012 TEMPORARY CONCRETE WASHOUT LS 4,000.0000 4,000.00 0.000 0 013 TREATED WOOD WASTE LB 0.1000 6,680.00 0.000 0 014 TEMPORARY HIGH-VISIBILITY FENCE LF 3.6000 6,120.00 0.000 0 015 CLEARING AND GRUBBING (LS) LS 27,000.0000 27,000.00 0.000 0 016 ROADWAY EXCAVATION CY 84.0000 11,760.00 120.000 10,080 017 SHOULDER BACKING TON 85.0000 147,050.00 2,039.000 173,315 018 CLASS 2 AGGREGATE BASE (CY) CY 250.0000 15,000.00 60.000 15,000 019 PREPAVING INERTIAL PROFILER LS 5,800.0000 5,800.00 1.000 5,800 020 PREPAVING GRINDING DAY EA 15,000.0000 30,000.00 2.000 30,000 021 HOT MIX ASPHALT (TYPE A) TON 110.0000 115,500.00 1,312.500 144,375 022 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 100.0000 2,770,000.00 25,263.120 2,526,312 PROGRAM CAS145 PAGE 2 DATE 03/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0Q1804 TIME 01:33 PM ESTIMATE NO. 005 BID OPENING 07/03/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/19 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 03/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 DATA CORE LS 7,500.0000 7,500.00 1.000 7,500 024 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.6500 10,048.50 9,069.000 14,963 025 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.6500 676.50 352.000 580 026 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.6500 28,710.00 18,290.000 30,178 027 PLACE HOT MIX ASPHALT SQYD 75.0000 13,500.00 168.000 12,600 (MISCELLANEOUS AREA) 028 TACK COAT TON 400.0000 24,800.00 71.600 28,640 029 REMOVE ASPHALT CONCRETE DIKE LF 0.5000 11,900.00 0.000 0 030 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.0000 77,040.00 8,025.000 96,300 031 STRUCTURAL CONCRETE, BRIDGE CY 22,000.0000 26,400.00 0.000 0 (F) 032 BAR REINFORCING STEEL (RETAINING WALL) LB 55.0000 5,720.00 0.000 0 (F) 033 REMOVE ASPHALT CONCRETE SURFACING SQFT 157.0000 8,949.00 0.000 0 034 PAINT BRIDGE IDENTIFICATION EA 400.0000 800.00 2.000 800 035 BRIDGE REMOVAL (PORTION) LS 27,000.0000 27,000.00 0.000 0 036 ADJUST MONUMENT COVER TO GRADE EA 1,300.0000 1,300.00 0.000 0 037 REMOVE PAVEMENT MARKER EA 2.0000 6,060.00 3,030.000 6,060 038 GUARD RAILING DELINEATOR EA 17.0000 3,570.00 0.000 0 039 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 15,150.00 3,046.000 15,230 040 OBJECT MARKER (TYPE L) EA 45.0000 810.00 0.000 0 041 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 26.0000 135,460.00 0.000 0 042 VEGETATION CONTROL (MINOR CONCRETE) SQYD 80.0000 358,400.00 0.000 0 043 TRANSITION RAILING (TYPE WB-31) EA 5,000.0000 40,000.00 0.000 0 044 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,100.0000 68,200.00 0.000 0 045 CONCRETE BARRIER (TYPE 742 MODIFIED) LF 530.0000 14,840.00 0.000 0 (F) 046 CONCRETE BARRIER (TYPE 742B MODIFIED) LF 1,000.0000 39,000.00 0.000 0 (F) 047 CONCRETE BARRIER TRANSITION LF 1,078.0000 15,092.00 0.000 0 (F) 048 REMOVE GUARDRAIL LF 6.0000 36,720.00 0.000 0 049 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 13,550.00 1,863.000 9,315 PROGRAM CAS145 PAGE 3 DATE 03/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0Q1804 TIME 01:33 PM ESTIMATE NO. 005 BID OPENING 07/03/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/19 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 03/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 77,500.00 68,646.000 34,323 (SPRAYABLE) 051 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 49,800.00 166,000.000 49,800 052 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 9,485.00 2,710.000 9,485 053 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 054 MODIFYING EXISTING ELECTRICAL SYSTEM LS 70,000.0000 70,000.00 0.525 36,750 PROGRAM CAS145 PAGE 4 DATE 03/22/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0Q1804 TIME 01:33 PM ESTIMATE NO. 005 BID OPENING 07/03/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/19 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 03/22/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 4,145,045.65 ADJUSTMENT OF COMPENSATION 0.00 -13,336.00 EXTRA WORK 80,462.00 120,462.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 80,462.00 4,252,171.65 055 MOBILIZATION LS 631,000.0000 631,000.00 1.000 631,000 ORIGINAL CONTRACT AMOUNT 6,396,021.00 TOTAL WORK COMPLETED 80,462.00 4,883,171.65 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -10,000.00 TOTAL 80,462.00 4,873,171.65 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/20/18 50 10/09/18 10/09/18 04/30/19 30 81 6 0 76% 54% PROGRESS IS SATISFACTORY DAVID ABLEDU RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/19